Loading...
36-071 (5) y r, 48. Prior to issuance of a building permit for lots 8, 12, 13, 18, 20, 21, &29 landscaping along the side lot lines of lots between these lots shall contain sufficient enough vegetation to clearly indicate the boundary of these lots and the boundary of the width of the open space access between these parcels. 49. Prior to issuance of building permits for lots 8, 12, 13, 18, 20, 21, & 29 public trail easements shall be recorded post signs for trail access at the points indicated on the plans. 50. Easement for pedestrian access at detention basin 1 must be approved and recorded prior to sale of the first lot. Other: 51. Electric services are provided through Mass Electric, not Western Mass Electric. 52. Final plans must show location of utilities providing for cable tv, electric, gas, phone, fiber optic, etc. as required in the subdivision rules and regulations. 53. In accordance with 6:03 (10), GPS control points must be identified. Vertical and horizontal, control points must be certified by a surveyor to be accurate within one centimeter, prior to final endorsement. Monuments must be placed at these points. 54. Submittal of detail of check dams is required prior to final endorsement. 55. No common driveways have been approved in this permit. 7 7, 38. The applicant must provide specifications for a sanitary sewer cleanout where each lot ties into the system at the property line. Pedestrian Safety: 39. Maximum design speed for streets within the subdivision should be 25 miles per hour. 40. A striped pedestrian crosswalk shall be painted across Burts Pit Road at the intersection of Cardinal Way and Redford Drive. 41. A landing pad shall be located at Redford Drive to ensure that a safe waiting place is provided for pedestrians to cross Burts Pit Road. 42. Four pedestrian crosswalk signs shall be posted in accordance with the Manual on Uniform Control Devices to the east and west of this crosswalk. 43. The proposed"ANR" lot on the southwest corner of Cardinal Way and Burts Pit Road shall be accessed from Cardinal Way. All required pen-nits for a side lot access shall be obtained prior to issuance of a building permit for this "ANR" lot. Open Space: 44. Prior to the construction of the road (Cardinal Way), a conservation restriction approved by the Secretary of Environmental Affairs must be recorded for the open space shown on the plans. In order to meet the state requirements for recording a conservation restriction, the public benefit test shall be met by dedicating the trails, as shown on the plans, for public access, for at a minimum, the residents and property owners of the development. This conservation restriction may be granted to the Northampton Conservation Commission or other eligible group. 45. If the open space is to remain under private ownership with a conservation restriction,prior to the sale of the first building lot the applicant must: 1)build the trail as shown on the plans; 2)post signs indicating trail access. 46. If open space is private, prior to issuance of a building permit for lots 8, 12 and 13 and 20 and 21, 29, signs must be posted by the developer indicating open space access points. If the open space is public, the applicant shall notify the City of Northampton Office of Planning and Development so that the City may place a permanent sign at Cardinal Way indicating public access to the open space. 47. Signs shall also be placed by the City or the developer (depending on ownership status of open space) at the rear of lots 12, 13, and 14 indicating the boundary of the public trail. 6 r 7i 28. All catch basins shall have 4' sumps. 29. Vehicle access points to detention areas must have a driveway and be paved to the edge of the street line. Applicant must install bollards with a chain gate, as authorized by DPW to prevent unauthorized access to the areas. 30. Drain lines located from STA 16+65 to 19+30, 31+42 to 34+20 and 38+05 to 37+38, are shown less than 3' in depth. Applicant shall increase the depth of the drain lines to maintain a minimum of 3 feet of cover over the pipe at all times. 31. Catch basins 23 and 24 cannot be tied into each other. They must flow into a drain manhole, which then discharges into the detention area. Maintenance: 32. A bank account to be jointly held by the City and the Homeowner's Association, capitalized with $8,000 to cover emergency expenses related to stormwater infrastructure (not for maintenance) shall be created by the HOA. The account must be established in a way that requires signatures from both the HOA and the City before the HOA may withdraw for capital expenses. If the City is required to withdraw funds for maintenance of the system, only a City signature is required. If funds are withdrawn for capital expenses related to the stormwater infrastructure, the account must be replenished within 3 months by assessing the HOA members appropriate fees to replace the amount withdrawn. Interest from the account, in excess of the $8,000 principal plus inflation, may be withdrawn by the HOA periodically. 33. The City will have a right to place a lien on any or all properties within the subdivision in order to recover the cost of maintenance for stormwater facilities, snow removal on sidewalks throughout the subdivision and any part of the street network that is not public. 34. The above provisions shall be documented in restrictive covenants for the subdivision prior to the final endorsement of these plans. 35. Covenants shall include provision for all maintenance requirements as identified in this conditional approval. Sewer: 36. Prior to hooking up to the City's sanitary sewer, the applicant must submit an operations and maintenance plan for the low-pressure sanitary sewer system that meets the DPW standards for accepting a connection. 37. The forced main must be designed in accordance with the state plumbing code. 5 r Y Stormwater Management Facilities: 21. Maintenance of stormwater facilities, except for the public street and associated catch basins in the street right-of-way, shall be the responsibility of the Homeowner's Association (HOA) and shall be in accordance with the stormwater management plan. This plan shall be recorded in the covenants submitted prior final endorsement. Inspections shall be by a qualified professional. 22. The only systems outside of the purview of the HOA for maintenance is the public street (if offered and accepted by the City) and its associated catch basins. 23. If Cardinal Way is not accepted as a city street, the Homeowner's Association will be responsible for street sweeping in accordance with the Maintenance Plan and Order of Conditions issued by the Conservation Commission. Receipts for street sweeping shall be submitted with the semi-annual reports required in condition#25. 24. All drainage swales, check dams, and rip rap basins shall be kept clear of sediments and inspected semi-annually concurrently with maintenance schedule of the stormceptors and basins as directed in the maintenance plan. 25. Maintenance reports shall be submitted to the Office of Planning &Development after each recommended inspection indicating status of each element of the entire system under the HOA's maintenance purview. Inspections shall be conducted in April and October with reports submitted to the Office of Planning & Development no later than May 15 and November 15 each year. If reports are not submitted within a month of these dates, the City shall have the right to utilize funds from the HOA's stormwater account(described in#32) to perform inspections and contract appropriate maintenance in accordance with design and function of stormwater systems. 26. Location of the stormceptors are approved as shown in the right-of-way, however maintenance must be performed by the homeowner's association. The stormceptors may be relocated outside of the right-of-way as recommended by DPW. To the extent possible, all recommendations with respect to street design and layout from DPW should be met to increase the City's ability to accept Cardinal Way as a public street. 27. All culvert inlets and outlets (ends) not discharging into a detention basin lot must be located within the road right-of-way or easements must be granted to DPW for maintenance purposes. Effected culverts include: 1)the 36"RCP at @ Sta 5+75; 2)the 12" RCP at @ Sta 8+48; 3)the 36"RCP at @ Sta 35+40; All culverts should have headwalls at the inlet and flared end at the outlet. All easements must be approved by Office of Planning &Development and recorded prior to street acceptance. 4 '1 elements may be put in place prior to this. These ponds must be inspected monthly and after each rainstorm. Sediments must be removed as necessary. Infrastructure: 10. The section of Cardinal Way connecting to Route 66 shall be completed prior to Mass Highway's reconstruction of Route 66. 11. The treebelt may be eliminated from Lot 2, south to Route 66 on the west side of the road subject to review in accordance with condition#19 herein to ensure conformance with tree planting within the subdivision rules. The sidewalk in this portion of the subdivision maybe located at the back of the curb adjacent to wetland section only. The sidewalk must be constructed in accordance with the subdivision rules. 12. If a conflict exists at STA: 5+75 with the proposed catch basin, the line must be relocated to maintain a 10' separation, subject to DPW approval. 13. If hydrant at Sta 5+80 is moved back, the existing branch should be replaced using restrained joints an 8' opening should be left in the guardrail for access. 14. The gate located at STA 11+51 should be relocated to STA 10+22. 15. The 12"pipe should be connected with the 8" diameter pipe from Sovereign Way right-of-way(at @ Sta 11+58) with a hydrant and an 8" gate installed on the 8" pipe and a 12" gate on the north side of the tee. DPW will make the connection. However, the applicant must notify the DPW at the time when such connection is ready to be made. 16. A minimum of 1' clearance between the water main and culvert must be maintained (sta 19+90). 17. A 10-foot lateral separation is required between water and drain lines. 18. A sediment trap consisting of 30' length of 3" trap rock must be placed at the edge of the bituminous apron on parcel AA to prevent sand/silt from being deposited on the roadway and into the drainage system. 19. On the section of roadway from Lot 2 south to Route 66, the street tree standard may be met by using existing tree cover if applicant satisfies requirements within subdivision rules and provides sufficient data regarding existing tree canopy for the Planning Board to ensure that the standard will be met. Final plans must show compliance with the subdivision rules. 20. The right-of-way for the entire street network must be no more or less than 60' wide. 3 MMOMMOMMMW s li 2. All improvements to streets within the street network shown must be made in accordance with Rules and Regulations Governing Subdivisions in Northampton, including the 55 Acre right-of-way. This network may remain private or may be offered to the City. However, no covenant may restrict the future use of parcel AA as part of the integrated, improved street system connected to adjoining properties and any transfer or offer of the street network must include the entire network, including parcel AA. Covenants: 3. Prior to the start of construction of the roadway, an irrevocable Letter of Credit for $65,000 must be submitted to the Office of Planning &Development for the wetland replication work. This may be consolidated with a Letter required for the Planning Board permit so long as there is at least $65,000 for wetland replication work. The Letter must be for 5 years. If the Letter is for 1 year, it must renew automatically or have a provision which states that the City may call the Letter if it is not renewed within 60 days prior to expiration. Language must also set forth standard criteria for default as outlined in the City of Northampton Subdivision Rules and Regulations. The Letter may be renewed/extended beyond 5 years by approval of the Conservation Commission only if such a request is made three months prior to the expiration of the Letter. 4. Covenants must state that snow removal on sidewalks within the subdivision that abut open space will be the responsibility of the Homeowners' Association. Snow removal on all sidewalks abutting individual building lots will be the responsibility of individual owners or the Association, whichever is determined by the applicant. 5. Covenants must include statement that at no time in the future may the residents petition the city to add street lights to the right-of-way. 6. A performance guarantee that conforms to Northampton Subdivision Rules and Regulations §6:06 (4) must be posted prior to endorsement of this plan. 7. Building permits may not be pulled until final plans and covenants reflecting all conditions herein have been submitted and endorsed and plans and covenants recorded. Active construction: 8. The compensatory storage area shall be created and inspected prior to construction of bridge crossing of Parsons Brook. 9. All detention basins shall be created prior to the construction of the road crossing Parson's Brook and all other road work. Rough grading and erosion control 2 7, ATTACHMENT A The Plantation at West Farms,Definitive Subdivision, Northampton As Approved by the Northampton Planning Board April 4, 2002 Approved waivers: A. Waiver of street width reduction from 24' to 22' throughout the subdivision B. Reduction of road radii to 150'. C. Delay in submittal of survey of plans on 3 1/2" disc, easement documents, and covenant documents. These will be required prior to endorsement of revised definitive subdivision plans. D. Use of HydroCad to determine culvert sizes for stormwater system. E. Reduction in number of street lights for the subdivision, if no additional street lights are requested by homeowners at any time in the future. Applicant will provide street lights at entrances to the subdivision, at Parsons Brook Crossing, and at curves for a total of 5 lights internally plus one at each entrance. F. Waiver from requirement that the centerline of the roadway coincide with the centerline of the right-of-way. Denied waivers: Final plans must show compliance with the subdivision rules and regulations with respect to these items. G. Request for street right-of-way to exceed 60' and the request to be less than 60'. H. Request to end sidewalk south of lot 2. The sidewalk must extend to Route 66, but the treebelt may be eliminated from Lot 2, south to Route 66 on the west side of the road. The sidewalk may be located at the back of the curb in the area adjacent to the wetlands only. I. Request for reduction of minimum cover of utility lines, unless otherwise clarified by applicant to DPW's satisfaction. J. Request for maximum slope for utility lines unless otherwise clarified by applicant to DPW's satisfaction. K. Request for waiver from providing granite curbing. L. All other requests related to location of utilities design. New design negates the request for these waivers. Requested waivers A-F above are approved with the following conditions: 1. Final plans must be submitted that show compliance with these conditions prior to final endorsement. 1 Planning Board - Decision City of Northampton File No.: PL- Date: April 17, 2002 Pursuant to Massachusetts General Laws(MGL),Chapter 40A,Section 11,no Special Permit,or any extension,modification or renewal thereof,shall take effect until a copy of the decision bearing the certification of the City Clerk that twenty days have elapsed after the decision has been filed,or if such an appeal has been filed that it has been dismissed or denied,is recorded in the Hampshire County registry of Deeds or Land Court,as applicable and indexed under the name of the owner of record or is recorded and noted on the owner's certificate of title.The fee for such recording or registering shall be paid by the owner or applicant.It is the owner or applicant's responsibility to pick up the certified decision from the City Clerk and record it at the Registry of Deeds.(Please call the City Clerk prior to picking up the decision.) The Northampton Planning Board hereby certifies that a Special Permit has been GRANTED and that copies of this decision and all plans referred to in it have been filed with the Planning Board and the City Clerk. Pursuant to Massachusetts General Laws,Chapter 40A,Section 15,notice is hereby given that this decision is filed with the Northampton City Clerk on the date below. If anyone wishes to appeal this action, an appeal must be filed pursuant to MGL Chapter 40A,Section 17,with the Hampshire County Superior Court or the Northampton District Court and notice of said appeal filed with the City Clerk within twenty days(20) of the date of that this decision was filed with the City Clerk. Applicant: Lepine-Wzorek Associates—Burts Pit Road&Westhampton Road DECISION DATE: April 4,2002 DECISION FILED WITH THE CITY CLERK: April 17, 2002 Ai ,4 i, G. The requested use will promote City planning objectives to the extent possible and will not adversely affect those objectives, as defined in City master or study plans adopted under M.G.L. Chapter 41, Section 81-C and D. In addition, in reviewing the Site Plan submitted, the Planning Board found that the application complied with the following technical standards: 1. The new through road connecting Westhampton Road and Burts Pit Road will improve emergency vehicle access to the site. 2. Pedestrian, bicycle and vehicular traffic are separated on site through designation of an off-road pedestrian trail system and construction of a sidewalk along Cardinal Way. Conditions imposed upon the project (see Attachment A). CERTIFICATE OF SERVICE Pursuant to M.G.L. Chapter 40A, Section 11, I, Angela Dion, Board Secretary, hereby certify that I caused copies of this Decision to be mailed, postage-prepaid, to the Applicant and Owner on April 17, 2002. 1/ l T stormwater management regulations and has addressed other detrimental uses as depicted on plans and information submitted with the application B. The requested use will promote the convenience and safety of vehicular and pedestrian movement within the site and on adjacent streets, minimize traffic impacts on the streets and roads in the area with the addition of a new through-road (Cardinal Way) that will connect Burts Pit Road and Westhampton Road. Sidewalks shall be constructed along the length of Cardinal Way and maximum design speeds within the subdivision shall be set at 25 miles per hour. According to the information submitted with the application, traffic generated by the proposed development will have no negative impacts on traffic flows on Burts Pit Road and Westhampton Road. A striped pedestrian crosswalk shall be painted across Burts Pit Road at the intersection of Cardinal Way and Redford Drive. In addition, a landing pad shall be constructed at Redford Drive thereby ensuring a safe waiting place for pedestrians crossing Burts Pit Road. C. The requested use will promote a harmonious relationship of structures and open spaces to the natural landscape, existing buildings and other community assets in the area through the design and location of the subdivision. The project will blend with existing residential uses and the location of the proposed development is concentrated within the center of the parcel thus allowing the natural open space buffers to remain undisturbed. The remaining land on the parcel will continue as open space and approximately 28 acres will be conveyed to the City of Northampton. D. The requested use will not overload, and will mitigate adverse impacts on, the City's resources including the effect on the City's water supply and distribution system, sanitary and storm sewage collection and treatment systems, fire protection, streets and schools because the project has been designed in conformance to the Northampton Subdivision regulations. E. The requested use meets any special regulations set forth in Sections 5, 10 & 14. The applicant has shown improvements to the two crossings and utilities within these areas with the construction of a through-road (Cardinal Way) from Burts Pit Road to Westhampton Road (Rte. 66). Flood storage will be created to compensate for the capacity lost due to construction of the new crossing of Parson's Brook. F. The requested use bears a positive relationship to the public convenience or welfare because the proposed development is a positive environmental improvement to the area by cleaning up the site of old debris remnants from the decades of use as a sand and gravel operation. The use will not unduly impair the integrity or character of the district or adjoining zones, nor be detrimental to the health, morals, or general welfare. The use shall be in harmony with the general purpose and intent of the Ordinance because the Open Space Residential Development use is compatible with surrounding uses. r, Northampton, MA." Sheet No. 32 of 43, prepared for Lepine-Wzorek Associates, prepared by Alec Macleod, dated December 20, 2001 and revised on March 7, 2002. (,} 33. "Sewer Details, Definitive Subdivision, Plantation at West Farms,Northampton, MA.' �// Sheet No. 33 of 43; 34. "Water Main & Erosion Control Details, Definitive Subdivision, Plantation at West Farms,Northampton, MA. "Sheet No. 34 of 43; 35. "Drainage Details, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 35 of 43; 36. "Road and Drainage Details, Definitive Subdivision, Plantation at West Fanns, Northampton, MA." Sheet No. 36 of 43; 37. "Road Details, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 37 of 43; 38. "Construction Details, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 38 of 43; 39. "Proposed Stream Crossing, Culvert Details, at STA. 35 + 90, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 39 of 43; 40. "Cross-Sections,Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 40 of 43; 41. "Cross-Sections, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 41 of 43; 42. "Cross-Sections, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 42 of 43; 43. "Cross-Sections, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 43 of 43; Planning Board Members present and voting were: Chairman Daniel Yacuzzo, George Kohout, Keith Wilson, Paul Diemand and Ken Jodrie. In Granting the Special Permit with Site Plan, the Planning Board found: A. The requested use for the construction of a single-family open space residential development protects adjoining premises against seriously detrimental uses because the use is permitted within Suburban Residential zone and all zoning requirements have been met. The applicant has made provisions for surface water drainage according to DEP 7, Plantation at West Farms,Northampton, MA." Sheet No. 18 of 43; 19. "Cardinal Way Plan &Profile, STA. 36+00-STA. 38+31.06, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 19 of 43; 20. "Grading, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 20 of 43; 21. "Grading, Definitive Subdivision, Plantation at West Fanns, Northampton, MA." Sheet No. 21 of 43; 22. "Grading, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 22 of 43; 23. "Grading, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 23 of 43; 24. "Detention Basin 1 and Stormwater Treatment Units, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 24 of 43; 25. "Detention Basin 2 and Detention Basin 3, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 25 of 43; 26. "Planting & Lighting, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 26 of 43; 27. "Planting & Lighting, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 27 of 43; 28. "Planting & Lighting, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 28 of 43; 29. "Wetland Mitigation Locus Plan, Definitive Subdivision,Plantation at West Farms, Northampton, MA." Sheet No. 29 of 43,prepared for Lepine-Wzorek Associates, prepared by Alec Macleod, dated December 20, 2001 and revised on March 7, 2002. 30. "Wetland Mitigation Plan A, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 30 of 43, prepared for Lepine-Wzorek Associates, prepared by Alec Macleod, dated December 20, 2001 and revised on March 7, 2002. 31. "Wetland Mitigation Plan B, Definitive Subdivision, Plantation at West Farms, Northampton, MA." Sheet No. 31 of 43, prepared for Lepine-Wzorek Associates, prepared by Alec Macleod, dated December 20, 2001 and revised on March 7, 2002. 32. "Wetland Mitigation Plan C, Definitive Subdivision, Plantation at West Farms, No. 4 of 43; 4. "Site Plan, Definitive Subdivision Plantation at West Farms,Northampton, MA" Sheet No. 5 of 43; 5. `Existing Conditions, Definitive Subdivision Plantation at West Fanns, Northampton, MA" Sheet No. 6 of 43; 6. "Lot Layout, Definitive Subdivision, Plantation at West Farms, Northampton, MA" Sheet No. 7 of 43; 7. "Lot Layout, Definitive Subdivision, Plantation at West Farms, Northampton, MA" Sheet No. 8 of 43; S. "Lot Layout, Definitive Subdivision, Plantation at West Farms, Northampton, MA" Sheet No. 9 of 43; 9. "Lot Layout, Definitive Subdivision, Plantation at West Farms,Northampton, MA" Sheet No. 10 of 43; 10. "Lot Layout, Definitive Subdivision, Plantation at West Farms, Northampton, MA" Sheet No. 11 of 43; 11. "Lot Layout, Definitive Subdivision,Plantation at West Farms, Northampton, MA." Sheet No. 12 of 43; 12. "Cardinal Way Plan &Profile STA. 0+00-STA. 6+00, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 13 of 43; 13. "Cardinal Way Plan &Profile STA. 6+00—STA. 12+00, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 14 of 43; 14. "Cardinal Way Plan &Profile STA. 12+00-STA. 18+00,Definitive Subdivision Plantation at West Farms,Northampton, MA" Sheet No. 15 of 43; 15. "Cardinal Way Plan &Profile STA. 18+00-STA. 24+00, Definitive Subdivision Plantation at West Farms, Northampton, MA" Sheet No. 16 of 43; 16. "Cardinal Way Plan &Profile, STA. 24+00-STA. 30+00, Definitive Subdivision, Plantation at West Farms,Northampton, MA" Sheet No. 17 of 43; 17. "Cardinal Way Plan &Profile, STA. 24+00- STA. 30+00, Definitive Subdivision, Plantation at West Farms,Northampton, MA." Sheet No. 17 of 43; 18. "Cardinal Way Plan &Profile, STA30+00-STA. 36+00, Definitive Subdivision, _ 9 IY4� )fjG� PLANNING AND DEVELOPMENT OIT�' OF NORTHAMPTON City Haft• ?i o Main Street,Room r r • Nortbamptoni MA of o60-3198 • (413)587-1266 • Fax:587-1264 r rpl Wa�3r1e Feiden Director )Manning @northamptonplanning.org nwrv.nort(�amptonp ailnint}.orb DECISION OF NORTHAMPTON PLANNING BOARD APPLICANT: Lepine-Wzorek Associates ADDRESS: 262 East Street Easthampton,MA 01027 OWNER: Wzorek Family Investment Trust ADDRESS: 383 Westhampton Road Northampton, MA 01060 Melanie Gulow 363 Westhampton Road Florence, MA 01062 RE LAND IN NORTHAMPTON AT: Burts Pit Road and Westhampton Road MAP AND PARCEL NUMBERS: MAP: 36 PARCEL: 71, 74 & 75. PROPERTY RECORDED IN THE HAMPSHIRE COUNTY REGISTRY OF DEEDS IN BOOK 5911 AND PAGE 308. At a meeting conducted on April 4, 2002, the Northampton Planning Board (unanimously) voted 5:0 to GRANT the request of Lepine-Wzorek Associates for a Special Permit with Site Plan (major project) under the provisions of Sections 6, 10 & 14 of the Northampton Zoning Ordinance to construct a single-family residential development with a total of 29 units, to be constructed and located as shown on the following plans and information submitted with the application and as amended by any conditions attached to this pennit. Unless otherwise noted, all plan sheets identified below are prepared for Lepine-Wzorek Associates, prepared by Almer Huntley Jr. &Associates, Inc., dated December 20, 2001 and revised on March 7, 2002. 1. "Construction Notes, Definitive Subdivision Plantation at West Farms, Northampton, MA" Sheet No. 2 of 43; 2. "Construction Notes, Definitive Subdivision Plantation at West Farms,Northampton, MA" Sheet No. 3 of 43; 3. "Key Sheet, Definitive Subdivision Plantation at West Farms,Northampton, MA" Sheet Planning board •conservation commission •zoning boardof appeals •housing partnership •redevelopmentauthorit,p •northampton GIS economicdevelopment •community development . Gistoricdistrictcommission •historicalcommission-central businessarebitecture original printLJ on regcIe.l paper