Loading...
18C-045 (2) a M � f i ral 1 N ol'ti. j ; N � � I � s- � Ql� 4 4 14 vC y E 1 " a 9 1 `QV - V V �n Z `A1 = 1 �� t*+ i Vt �� � �u 3 �' $o � �.. � � �l � °� � �� o � o �. ���� ,� i �( � � �� i • �� `__ �_ � r'� ' � ,�' g � -�' 1 �� � � � �� � � � � � I ,� F � � r-- � ,� °-" I � � �� �-- i 1° .�- _ N'250'26'E 14 fir! f*i ?f cS s s r 50.75' Z- ,4 ---- ------- --- ------ VT O M- CS rn C3 7 Z.OLA C4.e - CP C, LM Lp ca fn• 00- Ln :AMC .VM ;0 �( � '���� 3 t � - --- 'F :; � ;' F ( `�E � i � r ,1� i ,� 1 __ � j r � � ��__ 1 � � 5 r.i� ' 'D! (� i 1 I � E � ,� r 1 � � � � �� �`� � ► f� � �,` ��Yw f 1 i i � ( --��,:- -� I 5 r .-, f � � � { f i _ �� _.�f�, � { .. r � f ' �... i ` �� ; T. j v r x Lh AV I "Ile 1 p s e J yl - City of Northampton r Massachusetts DEPARTIWNT OF BUILDING INSPECTIONS y 212 Main Street • Municipal Building Northampton, MA 01060 7+y� y71 INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour) a rough building inspection (before work is concealed) insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made 1, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location The Commonwealth of Massachusetts Department of Industrial Accidents lag Office of Investigations 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: City/State/Zip: Phone#: Are you an employer? Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. E]New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ]Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance.1 required.] 5. IR We are:a corporation and its 10.V] Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.® Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.[Z Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.El Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins. Lic. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties ofperjury that the information provided above is true and correct. Signature: %_.��' Date: 3 Phone#: Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable £ Name of License Holder License Number Gvv:s 7 .��, TGo�-��y C.5 0 3 Address Expiration Date Signature\; Telephone s 9` a ered Home Im' overrient Contactor _M _ , _ Not Applicable £ Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... £ No...... £ 11. Home Owner. Exemption; The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780 Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing Or Doors Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [J5 Siding[0] Other , /4/r Brief Description of Proposed lef OCOO-4H /— Tk t6M VC S. /4sT�.� Work:f�ti:4.¢�.c 5'i'v� pia//r. h/tT/'u ���� E'Y /I i �r �r e Alteration of existing bedroom Yes ' No Adding new bedroom Yes +/ No Attached Narrative Renovating unfinished basement Yes / No Plans Attached Roll -Sheet sa 1f New house and°°or-addition•to'ezistina,h"ouslng; cornp�efe the 606io ilii a. Use of building:One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIE�FOR.BUILDING PERMIT .L as Owner of the subject property V hereby authorize to act on lny.behplf, 'n al att rs relative to work author ed by this building permit application. Signature of Ow Ur Date I, Gvrs c�,rT6c«. as Owner/Authorized Agent hereby declare that the statem nts and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name Signature of er/Agent Date . . Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning 71iis column to be filled in by Building Department Lot Size Frontage Setbacks Front Rear Building Height Bldg.Square Footage 01/0 Open Space Footage 0?/0 ' (Lot area minus bldg&paved #of Parking Spaces (volume&Location) A. Has a Special Permit/Va ria nce/Finding ever been issued for/on the site? � �~� NO «�x~~�� DONTKNOW « ~�_� YES �� IF YES, dateissuedf IF YES: Was the permit recorded at the Registry of Deeds? NO K � D NT YY YES � � IF YES: enter Book Page and/or Document# �� �� �� B. Does the site contain a brook' body of water orwedands7 NO �_� DONT KNOW �~� YES �_� IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained �-� Dbtained x~�` Date |ssued. ' �^� �~� ' C. Do any signs exist on the pnoperty �� ��� YES ��. NO �^� )F YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO 0 IF YES, describe size, type and location: } � E. Will the construction activity disturb(clearing, grading,excavation,or filling)over 1 acre orioit part ofa common plan ' that will disturb over 1 acre? YES 0 NO 0 IF YES,then a Northampton Storm Water Management Permit from the DPW in required. ^ '' IA(,Sije bJt.'/'-k dN City of Northampton � J•"x"tr�� fatus,oPerrrid '` � �Y -,pt v�a,l"���11" ryZJ2��j''�s 111.I! Building Department Gtr-tCuvotlye�nraPearrtltu t+� st AF YF k S b..... I ! 212 Main Street SevrerlS,gpttc Avalt"a' (Ity` } ` ✓ Room 100 A1Nater elrmkai. a�llt --� orthampton, MA 01060 Tv�4 s�s4df strctrir1 Maps Ie'c: 'Ctiorl 'S a �' IK '.;#,iv one 3-587-1240 Fax 413-587-1272 P�o�7Slte,Plans Ih � M Ot�ier SpeCIf� F v.. d S�PJ Ph SV M1r k�'1 P ill i h APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office E i ..� 4 t 4 F _. Urilt v ✓ TC? `Zone?I Overlay District t ` ! = Elm F.St District CB Dtstnct k. SECTION 2. PROPERTY OWNERSHIPIAUTHORIZED AGENT: 2.1 Owner of Record:�/ d l✓gc/lr� O`� G ��/���lei'� ��� �j/ice%_.S/rc �� /�,% �`cr j+'' Name(Print) 'I / Current Mailing Address: .- Telephone Signature 2.2 Authorized Agent: Name(Print Current Mailing Address: Signa a Telephone SECTION 3 ESTIMATED CONSTRUCTION COSTS. . Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building ! a -.,o (a)Building Permit Fee 2. Electrical .75�,�� �, (b)Estimated Total Cost of Construction from 6 3. Plumbing �� Building Permit Fee 79 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) v Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioher/lnspector'of Buildings Date File#BP-2014-0950 01C APPLICANT/CONTACT PERSON LOUIS MONTGOMERY Q ADDRESS/PHONE PO BOX 951 WILLIAMSBURG (413)268-2028 PROPERTY LOCATION 68 HATFIELD ST MAP 18C PARCEL 045 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out cin Fee Paid Typeof Construction: CONTSTRUCT 12 X 14 DECK RELOCATE 1 ST&2ND FLR BATHS RELOCATE WALLS REBUILD LOWER FRONT PORCH New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building,Plans Included• Owner/Statement or License 013471 3 sets of Plans/Plot Plan THE F LLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON IVORMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management e o " n Signature of Building ici Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 68 HATFIELD ST BP-2014-0950 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 18C-045 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:renovation BUILDING PERMIT Permit# BP-2014-0950 Project# JS-2014-001648 Est. Cost: $96500.00 Fee: $579.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: LOUIS MONTGOMERY 013471 Lot Size(sq. ft.): 45738.00 Owner: MCCUTCHEON DAVID J Zoning URB(100)// Applicant: LOUIS MONTGOMERY AT. 68 HATFIELD ST Applicant Address: Phone: Insurance: PO BOX 951 (413) 268-2028 0 WILLIAMSBURGMA01096 ISSUED ON:312412014 0:00:00 TO PERFORM THE FOLLOWING WORK:CONTSTRUCT 12 X 14 DECK,RELOCATE 1 ST & 2ND FLR BATHS,RELOCATE WALLS,REBUILD LOWER FRONT PORCH POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 3/24/2014 0:00:00 $579.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner