35-269 (15) *PLEASE READ CAREFULLY*
A STEP-BY-STEP CHECKLIST OF YOUR NEW POOL INSTALLATION
CUSTOMER RESPONSIBILITIES
THREE WEEKS FROM CONSTRUCTION•
APPLICA'T'ION FOR FINANCING-Please make all final arrangements with your bank 3 weeks prior to Teddy Bear's arrival for excavation of your pool.This
will assure no delay,and provide for completion on time.
TREE REMOVAL-Make arrangements with a tree specialist in the event trees must be eliminated to make room for your pool.At your request,we will be glad to
refer you to local companies.
REGARDING STUMPS:Any stump that is approximately 3"to 4"in diameter within a pool area will be gladly removed by Teddy Bear Pools.In the event a
stump must be excavated,a nominal fee will be assessed,i.e.machine time and/or extra materials needed.We do not remove stumps from the job site.If you can,have the
stumps ground F below ground level.
SEPTIC SYSTEMS/LEACH FIELDS&DRYWELL-In the event your present septic system or arterial leach field lines are going to interfere with pool
construction,arrangements should be made now,through a septic contractor,to address this concern.Teddy Bear Pools is not equipped to remove such systems,be we are
available to assist you in the handling of this matter.If your tank is nonfunctional,please make sure it is pumped I week in advance.
ACCESS-The first step,of course,is excavation.Please make sure that entry to the yard is clear from fences,wood piles,swingsets,bushes,etc.This will be
greatly appreciated.Teddy Bear Pools cannot be responsible for the removal for any of the above.Delays could occur if this has not been taken care of in advance. If access is
across a neighbor's property it will be your responsibility to obtain their permission and it will be understood that you,not Teddy Bear Pools,will assume the responsibility for
the finished grade of your neighbor's yard.
TWO WEEKS FROM CONSTRUCTION:
BUILDING PERMITS-Please obtain your building permit two weeks in advance of excavation-where local codes apply.Usually these forms will be mailed by
your town to you upon request.Our Home Improvement Contractor License#'s are:MA#11189 and CT#520951.
ELECTRICITY-"AVOID DELAY-HAVE POWER SUPPLY READY."Power must be supplied to the excavation area.A 20 amp outlet will suffice in most cases.
WATER-Please make sure that your installation crew has availability to water and hose.For insurance purposes,we are unable to allow any of our employees to
enter your home.
AT TIME OF CONSTRUCTION:
DRIVEWAY/SIDEWALKS-If the point of entry for trucks or equipment is over your concrete or blacktop driveway,we regret to say,it is at the owner's risk
since we have no way of knowing how firm each individual driveway will be.We will take every precaution,or listen to any suggestion you might have,to minimize any
problem that may arise.Once again,we cannot accept any liability for damages of any kind.
SITE WORK-"THINGS YOU SHOULD KNOW"
SHALE/ROCK-Expense could vary significantly depending on the circumstances:therefore,this cost will be discussed on an individual basis.
WATER TABLES/GROUND WATER/CLAY/REDPAN-Teddy Bear Pool charges the customer for direct costs only.Usually one or two loads of crushed
stone will suffice for an average water problem.The cost per load is$200.00-$300.00 delivered.(Extra excavation for this work and stone will be billed with labor.)
NON-APPARENT UNDERGROUND OBSTACLES-If underground debris(i.e.stumps,large rocks,etc.)are encountered,it may be necessary to use material
such as gravel,concrete and/or Sono tubes to rectify any voids created by the removal of such obstacles.Any charges for this type of extra material will be collected with your
excavation payment.
EXTRA FILL-It may be necessary for us to haul dirt away from your yard to create enough work space.If this is the case,it will be your responsibility to have
additional fill brought in for grading,if necessary.If you have clay soil,it will be necessary for you to have the rough grade top dressed,as clay cannot be spread as effectively
as other types of ground material.Teddy Bear Pools will leave you with a rough machine grade around the pool area.Fine grading will be your responsibility.
DRAINAGE-Occasionally a site may require a drainage system due to irregular landscape and soil conditions.Drainage is used to prevent surface run off and
upper seepage toward the pool.Water is directed away from the pool to a lower point on the site.Gutter downspout should also be directed away from the pool.
RETAINING WALL-If a retaining wall is necessary,please arrange for construction and back fill if the wall is to be constructed after the pool installation.Please
see that it is constructed promptly to avoid soil erosion.
LANDSCAPING-Teddy Bear Pools does not provide this service.When landscaping,be sure to maintain a pitch away from the pool and concrete.Crushed stone
is an aesthetically effective way to provide proper drainage.
WATER TO FILL POOL-Normally your pool is filled through your garden hose.If water needs to be trucked in,please inform us and we can make the necessary
arrangements.
REFUSE-Debris,mainly from the packaging of equipment,will be packed up neatly and left for your curbside trash collection.
AFTER INSTALLATION OF POOL STRUCTURE;
CONCRETE DECKING-Teddy Bear Pools utilizes the highest quality materials along with the most qualified craftsmen to ensure that cracking of concrete is
kept to a minimum.Unfortunately,given the Northeast climate,cracking of concrete is a fact which cannot be avoided.Your concrete deck WILL crack.In some instances,acid
rain,leaves,dirt and other debris that may come in contact with your deck could discolor concrete decking.Please keep your deck as clean as possible from foreign debris.
Within the first month of deck completion the ground will settle around it. It will be your responsibility to regrade to mid-deck height.
FLOATING LINERS-Excessive rainfall may cause flooding around your pool much like it does to a basement.The result of this may be a floating liner,which at
times may leave wrinkles in the liner.We can attempt to remove these wrinkles by resetting it.The cost of this service will be covered by most homeowner's insurance policies.
SEASONAL SERVICE-Pool opening and closing services are provided through our Service Department.We provide several services to cater to each customer's
individual needs.Please do not endanger your warranty by not having your pool properly opened and closed.Our Service Department is staffed by professional Service
Technicians who are equipped with factory authorized parts and training.The Teddy Bear Pool Service Team will open and close your pool professionally.
CHEMICAL TREATMENT-Teddy Bear Pools urges our customers to use only the Teddv Bear Pools recommended chemicals in you swimming pool.These
chemicals have been specially formulated to ensure the life long quality of our products without the risk of fading or wrinkling caused by inferior grade chemicals or chemical
imbalance.Such disorders are not covered under your warranty.A detailed outline and booklet on water chemistry will be provided to you upon completion of your new
swimming pool.Please read this booklet carefully.Do not endanger your warranty by using inferior chemicals.
IN CLOSING.......
Teddy Bear Pools is honored by your confidence,and will do everything within our power to keep that trust.A swimming pool is a long term investment.
Finally,you will be given complete instructions as to the operation of your new Teddy Bear Pool when your pool has been inspected and passed your electrical
requirements.This must be done by a licensed electrician
Thank you once again from all of us at Teddy Bear Pools& Spas
THIS MUST BE SIGNED AND RETURNED BEFORE EXCAVATION CAN BEGIN ON YOUR POOL
DUE TO INSURANCE REGULATIONS.
THANK YOU.
Owner Date
Please sign one copy of this page for Teddy Bear Pools and keep the other for your records.
TEDDY BEAR P SPAS
OMEN■■■■mom■■■■■■■■■UTA■EM■■�rinMMM■■■■■■■■■■■■■■■■M■■
■■■■■■■■■■■■■■■■■■■■■PROM■■UMEM■■■■■■■■■■■■■■■■■ONE
■■■■■■■■■■■■■■■■■■■■■■''rlEMR7RE MEN■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■N I'�r��i�'li'�ii �■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■MEl4' Iill■■■■■■■■■■■■■■■■■■■■MESON
■■■■■■■■■■■■■■■■■ ■■li•MwAv M■■■■■■■■■■■■■■■■■■■■■■■■■
■■■OMENS■M■■■■■■■�i01'�;. Gi �i[ENE■■■■ES■■■■■■■■■■■■■■■■■
■
mom 111SEMMEMNAMMMERN 02 no■■�'NMM■■0 EC7r mE■1#■OSr SIDE 1■E■■E■■S■■■■MEMO■■■■■■S■
■E■■■■■■M■■N■■E■MUMINM■ ■2119 EM■■N■■M■■■■M■■■■EM■EE■■
ONE■■■M■■■■■■■■■MORM M ■■■■■■
■■ ■■■■■■■■■■■■■E■■■
■■■ONE■■■■■■■■■■UMEN r Q'U110 EMMEM■■E ■■■■■■■■M■■■■
■■■■■■■■■E■■■■■■ NE■MM SMT90 EMORNMEM■E■■■■■■■■■■■■■■
i■Ei■■i0■■i■■■■ _ ■ ■ _. '�■■■M� M■ �■■■■■■■■■■
■MM■ME■■■ME■N■■'■NONE■O■■■MEMNON ■■01: ■■■■■■■■■MM■
EONS■M■■■M■■■M■RNMEMl:0 S J■■S■■■ !■■E■MEIII i! r1N■■■■■■■
■■■■■■■■■■■■■■■NS■MG�i�GiMfiii■EN■■■O11■■■■Niiiill�'�iYii:�E■■■■■■
MEMO■ENE■■SM■■EN■■NEE■MSNMN—MA■■■E1N■S■■■■i��rr►�:�c 1■EriOl�'::!1■■
■■■■■■M■■■■■■■■■■■■■AMf■RNUENGN■UM■■■■■■■M■■■■■RUIR■N
■■■■■■■■■■M■M■■■■■■MEM FaMOMM■■1!■■M■■■■■■■■■■■■ENNE
■■■■■■■■■NE■E■SMM■■MIME ' �t ►M■NNN �A■■N■N■ME■E■■■■E!■N
M■■E■■■■■■■■■■SE mom Mid■■NEE■■OMEM■1■■MMN■■■■■■■■■E►�■
■M■■N■M■■SON SS■b/E■M■!!N■E■■N■N■■Emom ■■■■"N"
■■■■■■■■■■■■■°■�i■■■Eii ■■iii■■■■Ei■■■■■■■■■■■■■
Not Included: Dry: M/Yes 0 No
17r Fencing •
Water Tanker: WYes ■ No
R Chemicals
Bld. Permit • 1 No
k
r Water Stumps: ■ • , ••
• • Description
•
tTi(a, GO
O,x Llcen11"9nstruction Su erylsora Not Applicable O
►3e^'eot-tremat-+ta±ik,'_.. ---
License Num er
Add,4ss Expiration Pe
Signature Telephone
Not Applicable 17
1 I 1W
QwAk Name Registration Number
Address Expiration to
i rwtF} V•v Telephone
Sg,�T(ON 10 Y OAKERSr r,9MPENSA L-M lN�,YRANO AFFIDAVIT(M.G.L,c. 152,§25C(6))
Workers Campensetiott rnsuramce amdlavit must-be cornpreted and subir-fterlwlth this application. F`oirura�to provide th-s afhdav,t
will result in the denial of the issuance of the building permit
Signed AtfiCavit Attache4 Yes.. . No. D
The current exemption for"homeownem"was extended to include Own er-occuni&Dwcl(IAEs of cqc(I) or two(2)fhmtbcs
and to allow such homeowner to engage an individual for hire who does not possess a license,proyldtA that the owner acts
assuriervisor.CMR780, Sithftlit" ec i n I OA.3. .t.
]DOW ion of Homeowner;Person a who own a parcel of land on which he/she resides or intends to reside,on which there
is,of is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who_cpmtruets more thAn one home in a two-year period sh ll not t;Considered a hgmco%yncr_
Such-homeowner-shall Submit to the 6uifding Qtficiat,on a form acceptable to the Building Olfr isl.t�h i he/she shall be
responsible for alt such%Yptk performed under the building Dorton.
As acting Construction SJU11trylsor your presence on the job site will be required from timgto time,during and upon
completion of the work fcr which this pemut is issued.
Aimbnc-advftedtharwith referancetoeheprar unuChaptel-t53-(Liability ofEtnploycn to
Employees for injuries not resulting in peach)of the Massachusetts General Laws Annotated,you msy be liable for yerson(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
ITonliampton Ordinenees.gate and Loeal toning Laws and S-tatc ofmmsachusetts General Laws Annotated.
Homeowner Signature..
05/21/2003 08:19 14135988823 TEDDY BEAR POOLS PAGE 04
. r�r,rnir rctaut�rctt� rdrX w t 3—tsts�-31 ttu My 21 200� 8:27 P.04
N*V.-Ko"W D- Addtitat f1 Raplacament timiaw. Altersliti 4t)- RoOhng 0
Or Doors t7
Accessary fdFdg Q 9emo►tNer New-Slgas E } Pecks-E } Siding t ) Other K,
I`
8ne r thscrtptTo►r ot-praposeehHVortr, _
Alteration of existing bedroom Yes No Adding new bedroom Yes No
Attached Narrative O Renovating unfinished basement- No
Plans Attached Roll 0 Sheet 0
�•L"UWlt�alirsttlf�if;�mra � �t� �r�r>a�rer. drPr�nrttrs�win .
a Use of building:One Family Two Femily Other
b tvurrigec cicoruas-In each(am4.unit= • _ Nwrber_a @athrooms
c. Is there a garage attached?
d Proposed Square footage of new construction._ Dimensions
e Number of stories?
t. Mainod-otheatinj? rreptecerorWoodsfoatt- Number of each
g. Energy Conservation Compliance, McSCheck Energy Compliance form attached?
h Type of construction�4- .'Imtrm lol Poo
is construction within 100 ft.of wetlands)—Yes No Is Construction within 100y, floodplain _ Yes__No
i Depth of basement or cellar floor below finished grade
lc tN;ll buitdMS-contor,n to-tha-liar itd;rg. Scegutat 1=s? .—,Yes _.. --No .
I Septic Tank City Sewer Private well City water Supply
•I w TDE., MI:ETEO WHEN S�CT�bNI `r y SAT!
40P
N
! iE'S FO I�311VG PERMIT
as Owner of I"3 o1w property
nerelby sumonze I Ar t`CC to acf on
my bell f, in all matters rolet to aulhoriiea by this •)uilding permit application
slaI
Signatu (owner Gate
I, >fe as Oyfier/Authorized Agent
hereby declare th t the statements and informatl on the foregoing application are true and accurate,to the best of my
knowledge and belief.
Signed under the.,pau+s_a� en I ifis of pirlury.
• r
5� of 7
05/21/2003 08:19 14135988823 TEDDY BEAR POOLS PAGE 03
. . .w. + ecJtJrlrtt eT ra7t-+rrrve7"Ttt7*t rtag er ztVt d:2e P.U.S
Section 4.
ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE
DENIED DUE TO LACK OFINFORMATION
Existing Proposed Required by Zoning
t Column b be Alled in by
ButN�e Npertment
Lot Size A
Fronts c (off
Setbwk> mgt
L -!QQ .R: JC t Afy
BS3t � `r Ali
t31Z>
Building Height ��
Bldg.Square Footage 1531. a % t Pap
� ag5a.-
Open Space Footage
a.a ua minus b14s&p.roe
ukln
IMF of I
Flll-
rolgms do t,OC�tttm
11
A Has a Special Permit/Variance/Finding ever been issued for/on the Site' eook%%p X�otct
NO OON'T KNOW YES '
IF YES, date issued: _
IF YES: Was the permit recorded at fps Registry of Deeds?
NO OON"T KNOW YES
IF YES, enter Book Page and/or Document s+
B. Does the site contain a brook, body of water or wetlands? NO � DON'T KNOW
YES
tF YES, has a permmit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained _ Date Issued:__
C Do any signs exist on the property? YES NO ✓
IF YES, describe size. type and location
U. Are trsers tiny proposed changes to or additions or a+gna inie.ide0 ►or tpe property°YES
No
IF YES, destr►be size, type and location _
05/21/2003 06:19 14135988623 TEDDY BEAR POOLS PAGE 02
r.�• r• rtv,M tctb)LKJI Lt, FdxNt13-WP-3184 Kay 71 200� 8'26 P.02
City of Northampton
Budding Department
212 Main Street
Room 100
C Northampton, MAO 1060
f phene 413 58i,7�12a0 Fax 413.587.1272
��PLtCA7IC t-T CONSTttli£F:AlTLP, REPAIR,RENO-VAT-E 011 DEMOuSd A ON1r 08-t o-FAMILY DWELLING ---
3 S�
&ECT to*4_1-si;
;,This; " G 'R,
Map�a`:` ,
on
r
} ��p�..`c . W11� �1�Ce el. a -• , 1a ,�r�;►� � r. '*,6,i^.�.
EIa4St,tl►stcitl c r - �e'. iird�,
SECTION 2• PROPERYY OWN,EhSNIP%AUTHORIZED AGENT
F2_3 wn t R cor& �T �� `.•
C
_� ,. IMA. cso(oa
twr*=e4►'dn41 Ct:rrCn_ !M�n Ahdree��..i.1.3.�d�� •-
Telephone
S Qnat
2,2 r
I
I ��-ECar+ty � Cs�rr�nt Mri�in�Atldrr±;s:
47o,:77
V.>-&W CkT 15" Z
S�Bnat�rs T�� -
S%-ffQN3-ESTIMAT N 7 $
;term Estimated Cost(Dollars)to be official.VsOn y
completed rm t applicAnt _.
1 guilding (a)9ullding Permit Fee
[ E�er;iric2! (b) t st'imetrcl Totjwl Cost Of
Construction from, 6
1 3 Piur}bing Building Permit Fee
4 d Mechenicel(NVAC) I
5 Fire Protection _
6 Total=() + 2 + 3 + 4 • 5) Check Numt)er
T ' n For Qtficlal Use.Onl
Building Permit Number, "' Date issued_
Signature _-
tFwrding�om/++lslrloMr/rhsgecrorot.But _ Ord' .
File#BP-2003-1048
APPLICANT/CONTACT PERSON TEDDY BEAR POOLS&SPA
ADDRESS/PHONE 41 EAST ST (800)554-2327
PROPERTY LOCATION 78 TURKEY HILL RD
MAP 35 PARCEL 269 001 ZONE SR
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out
Fee Paid
Typeof Construction: CONSTRUCT GROUND POOL
New Construction
Non Structural interior renovations
Addition to Existine
Accessory Structure
Building Plans Included•
Owner/Statement or License 069222
3 sets of Plans/Plot Plan
THE FO OWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFO ATION PRESENTED:
Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commis ' n
z � /2-3 2
Signature of Building Official Date
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of
Planning&Development for more information.
.'' ti..
AA
,
BP-2003-1048
GIS#: COMMONWEALTH OF MASSACHUSETTS
CITY OF NORTHAMPTON
Lot: -001
Permit: Building
Category: BUILDING PERMIT
Permit# BP-2003-1048
Project# JS-2003-1671
Est.Cost: $24059.00
Fee: $50.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: TEDDY BEAR POOLS & SPA 069222
Lot Size(sa.ft.): 221720.40 Owner: PELLEGRINO JAMES R&CHARLENE
Zoning: SR Applicant: TEDDY BEAR POOLS & SPA
AT. 78 TURKEY HILL RD
Applicant Address: Phone: Insurance:
41 EAST ST (800) 554-2327 Workers
Compensation
CHICOPEEMA01020 ISSUED ON:5123103 0:00:00
TO PERFORM THE FOLLOWING WORK.-CONSTRUCT INGROUND POOL
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupangy si nature:
Feel e: Receipt No: Date Paid: Check No: Amount:
Building 5/23/03 0:00:00 2756 $50.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Building Commissioner-Anthony Patillo
7Z'
L�rV
y,�k
78 TURKEY HILL RD BP-2003-1048
GIs#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 35-269 CITY OF NORTHAMPTON
Lot: -001
Permit: Building
Category BUILDING PERMIT
Permit# BP-2003-1048
Project# ]S-2003-1671
Est. Cost: $24059.00
Fee: $50.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: TEDDY BEAR POOLS & SPA 069222
Lot Size(sq. ft.): 221720.40 Owner: PELLEGRINO JAMES R&CHARLENE
Zoning: SR Applicant: TEDDY BEAR POOLS &. SPA
AT: 78 TURKEY HILL. RD
Applicant Address: Phone: Insurance:
41 EAST ST (800) 554-2327 Workers
Compensation
CHICOPEEMA01020 ISSUED ON:5123103 0:00:00
TO PERFORM THE FOLLOWING WORK.-CONSTRUCT INGROUND POOL
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings: y _
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final: °I, z
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final: 6)1< /0-'po-0.3
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATI OF
ANY OF ITS RULES AND REGULATIONS. ✓
Certificate of Occupancy Si nature:
FeeType• Receipt No: Date Paid: Check No: Amount:
Building 5/23/03 0:00:00 2756 $50.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Building Commissioner-Anthony Patillo