Loading...
24D-131 (2) City of Northampton Massachusetts DEPARTMENT OF BUILDING INSPECTIONS 212 Main street • Municipal Building Northampton, MA 01060 Valley Building Company, Inc. P.O. Box 246 Hadley, MA 01035 January 23, 2014 re: 22 Hooker Avenue, Northampton Dear Mr. Gelinas, The property at 22 Hooker Avenue in Northampton could be divided into 2 lots. The eastern side would be a conforming lot and the existing dwelling on the eastern side could remain as a conforming structure under the provisions for zero lot line development. There is some question about the frontage for the western lot. The street layout for the southern end of Hooker Avenue is not clear. The city defines frontage as "The uninterrupted length of the front lot line, as defined herein, whether straight or not, which conforms to the minimum lot frontage requirement and is on: A. A public way or a way which the City Clerk certifies is maintained and used as a public way; or B. A way shown on a previously approved subdivision plan which has been constructed to the standards required when subdivision approval was granted; or C. A way that predates subdivision control that has, in the Planning Board's opinion, suitable width, grades, and construction adequate and reasonable for vehicular traffic, including emergency vehicles and snow removal vehicles, and the installation of utilities." We will need more information to determine whether the front lot line of the proposed western lot would qualify as frontage. If you have more questions, feel free to contact me at the building department or Carolyn Misch at the planning department. Thank you, Louis Hasbrouck Building Commissioner City of Northampton -NOTE- THIS PLAT IS COMPILED FROM DEEDS, PLANS AND OTHER SOURCES AND IS NOT TO BE CONSTRUED AS AN ACCURATE SURVEY AND IS NOT TO BE RECORDED. BUILDING LOCATION ACCURACY IS NOT GUARANTEED NOTE: SUBJECT TO EASEMENTS AND RIGHTS OF WAYS OF RECORD. 102'f `f fished REFERENCE: PLAN BK. 25, PG. 35 f BOOK 8216, PAGE 107 FF o � " #22 . --+ -�° '�� abutters j \ gravel drive r Sa r I05'f HOOKER AVENUE L#27 TO: EASTHAMPTON SAVINGS BANK & FIRST AMERICAN TITLE INSURANCE COMPANY TO THE BEST OF MY INFORMATION, KNOWLEDGE AND BELIEF I HEREBY REPORT THAT I HAVE EXAMINED THE PREMISES AND BASED ON EXISTING MONUMENTATION ALL VISIBLE EASEMENTS, ENCROACHMENTS AND BUILDINGS ARE LOCATED ON THE GROUND AS SHOWN AND THAT THE BUILDINGS ARE ENTIRELY WITHIN THE LOT LINES, EXCEPT AS NOTED. I FURTHER REPORT THAT THE PROPERTY IS NOT LOCATED WITHIN A FLOOD PRONE AREA AS SHOWN ON FEDERAL FLOOD INSURANCE MAPS FOR COMMUNITY #250167 —NOTE— THIS PLAT I\ �. THIS PLAT FOR MORTGAGE LOAN PURPOSES ONLY SURVEYOR: AND DOES NOT CONSTITUTE A PROPERTY SURVEY OF —MORTGAGE LOAN INSPECTION PLAT- �" Sq�y NORTHAMPTON, MASSACHUSETTS RAND ALL PREPARED FOR v IZ. VALLEY BUILDING COMPANY, INC. /35032 SCALE: 1"=30' NOVEMBER 14, 2013 R a °� HAROLD L. EATON AND ASSOCIATES, INC. REGISTERED PROFESSIONAL LAND SURVEYORS 235 RUSSELL STREET — HADLEY — MASSACHUSETTS 22 Hooker Ave,Northampton, MA 6. (Attachment) We are effectively looking for a zoning opinion or determination that our plan, in concept, is in accordance with the zoning by-laws and rules. We have a 10,500+square foot lot, with large parking area, located at the end of Hooker Ave in Northampton. Zoned URC,this district allows for the subdivision of land with 50+feet of frontage per lot, and 2,500 sq ft of area per unit. We are interested in exploring the subdivision of the land to allow for the creation of another 2-family unit in the current location of the existing parking lot(see sketch).Our goal would be to pick a design and style that is in line with the existing neighborhood, and parking would be located to the rear of the buildings (preferable with a shared driveway to the designated parking areas).We recognize that moving forward would require a formal survey, design plan (standards), etc.At this time,we are simply seeking to verify the potential plan as we understand it and would welcome any guidance, concerns, etc. 10. Do any signs exist on the property? YES NO JAN 1 72014 IF YES, describe size, type and location: Are there any proposed changes to or additions of signs intended for the property? YES NO ✓ IF YES, describe size, type and location: 11//14 11. Will the construction activity disturb (clearing, grading, excavation, or filling) over l acre or is it part of a common plan of development that will disturb over 1 acre? YES _ NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building De rtment EXISTING PROPOSED REQUIRED BY ZONING Lot Size Frontage fi Setbacks Front,+ Side L: �7r Vii- R: L: R: L: R: Rear Building Height Building Square Footage � 3iw %Open Space: (lot area minus building Et paved parking #of Parking Spaces fi IG #of Loading Docks Fill: volume Et location) 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. Date: /q Applicant's Signature NOTE:Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health,Conservation Commission, Historic and Architectural Boards,Department of Public Works and other applicable permit granting authorities. W:\Documents\FORMS\original\Building-Inspector\Zoning-Permit-Application-passive.doc 8/4/2004 A File No. .26NING PERMIT APPLICATION 01o.2) Please type or print all information and return this form to the Building Anspector's Office with the $15 filing fee (check or money order)payable to the .- City of Northampton 1. Name of Applicant: Va o c y T' l d�r,', Co� Address: RL Av a�1 , 1 f d Ic AA ujo 3 s Telephone: L/1 3 2. Owner of Property: .% Address: Telephone: 3. Status of Applicant: Owner Contract Purchaser_ Lessee Other (explain) 4. Job Location: 14be Kr r— Av'c, AJ or�i,ati (� �, A'A CG10,5 y Parcel Id: Zoning Map# Parcel# District(s): In Elm Street District In Central Business District TO BE FILLED IN BY THE BUILDING DEPARTMENT 5. Existing Use of Structure/Property: ') F"'J �cs.yrni- 6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary): See. ,A ff,,cW _JZ 7. Attached Plans: Sketch Plan Z Site Plan _ Engineered/Surveyed Plans 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW ✓ YES _ IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW t/ YES IF YES: enter Book Page_ and/or Document# 9.Does the site contain a brook, body of water or wetlands? NO DON'T KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained_ , date issued: (Form Continues On Other Side) W:\Documents\FORMS\original\Building-Inspector\Zoning-Permit-Application-passive.doc 8/4/2004 File#MP-2014-0059 ADLCJ ( PERSON VALLEY ADDRESS/PHONE P O BOX 246 (413)584-B DING COMPANY INC PROPERTY LOCATION 22 HOOKER AVE .5cT (,104T MAP 24D PARCEL 131 001 ZONE URC(100)/ THIS SECTION FOR OFFICIAL USE ONLY: �E� PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Ty_peof Construction: ZPA-SUBDIVIDE LOT FOR 2 FAMILY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved Additional permits required(see below) L PLANNING BOARD PERMIT REQUIRED UNDER: §_ Intermediate Project: Site Plan AND/OR Special Permit with Site Plan Major Project: Site Plan AND/OR Special Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of Planning&Development for more information.