Loading...
32C-331 (8) \ 4,,j COT) '11 cv co —' �cc) GO t c,_ I SOIL BORING/MONITORING WELL OBSERVATION FOR4 CLIENT (5-C4/7c-,'1-z JOB PROJECT / o' ) BORING # BORING LOCATION SHEET �_ OF DATE TIME DRILLER START C2 Fr V 5 111-2010,3 AM PM OBSERVER Z— AX PM REVIEWER SURFACE ELEV. //5 REFUSAL DEPTH'l- 6 �( FT (ELEV. ) GROUNDWATER DEPTH FT. (ELEV. ) AFTER DAYS HRS. FT. (ELEV. ) AFTER DAYS HRS. TOP PVC/CASING ABOVE SURFACE FT. (ELEV. ) BOTTOM SCREEN MEASURED FROM TOP PVC/CASING FT. (ELEV. ) SCREEN SPEC. RISER FT. DRILLING METHOD SCREEN FT. SAMPLING METHOD TOTAL FT. SAMPLE DEPTH DESCRIPTION Z-0 5� - FT - -� FT QZ-1L)6 777L G2� l �5OJC�. o1S� FT FT FT FT FT FT FT FT COMMENTS: a4-I2 ALNIER HLNtTLEY, JR., & ASSOCIATES, INC. SL'RVEyORS - ENGINEERS - LANDSCAPE ARCHITECTS to ! _� Md� HUNTLE 9920� HUNTLEY ASSOCIATES, P.C. SURVEYORS.ENGINEERS.LANDSCAPE ARCHITECTS November 20,2003 City of Northampton Office of Planning&Development 210 Main Street Northampton,MA 01060 Attn: Ms. Carolyn Misch, Senior Planner r RE. Hockanum Road Townhouse Project,Addendum Huntley Project No.03-006 Dear Ms. Misch: Huntley Associates, P.C. (HAPC) is pleased to submit the following additional information for the proposed Hockanum Road Townhouse Project in Northampton. Please recall that our client, Mr. William Gruber proposes to construct two townhouse buildings with a total of 14 units on Hockanum Road. In response to a request from the Department of Public Work (DPW), a test pit was excavated in the area of the proposed stormwater detention.pond. On November 20. 2003, JC Construction excavated the test pit to a depth of approximately 80-inches. HAPC observed the excavation and visually inspected the soil for evidence of soil mottling (an indicator of high or perched ground water), see attached test pit log. Based on our visual inspection of the test pit soil cross-section, no soil mottling, seepage, or standing water was observed. Soil stratigraphy consists of 3 to 4 feet of fill, and the remaining soil appeared to consist of silt and silt-sized material. I ,ddition, during excavation a vitrified clay nine LVCP) was encountered and damaged. The 8-inch diameter drainage pipe (as determined from fluid and lack of offensive odor) was immediately repaired utilizing rubber couplings, stainless steel screw-tight fasteners, and a section of 8-inch diameter PVC pipe. The VCP was located approximately 70-inches below ground level(see attached sheet). If the Board has any questions or comments regarding this matter,please contact me at our office. Sincerely, HUNTLEY ASSOCIATES,P.C. Mark McClusky,P. Engineering Project Director cc. William Gruber W•\03 006\CORESPOND\SPL eR3 DOC -- 30 INDUSTRIAL DRIVE EAST.NORTHAMPTON, MASSACHUSETTS 01060.(413) 584-7444 .FAX(413) 586-9159 1885 STATE STREET•SCHENECTADY, NEW YORK 12304 .(518) 393-4767 .FAx(518) 393-3510 16-18 REYNOLDS AVENUE.ONEONTA, NEW YORK 13820 .(607) 432-3300.FAx(607) 432-8313