SOIL BORING/MONITORING WELL OBSERVATION FOR4
CLIENT (5-C4/7c-,'1-z JOB
PROJECT / o' ) BORING #
BORING LOCATION SHEET �_ OF
DATE TIME DRILLER
START C2 Fr V 5 111-2010,3 AM PM OBSERVER Z—
AX PM REVIEWER
SURFACE ELEV. //5 REFUSAL DEPTH'l- 6 �( FT (ELEV. )
GROUNDWATER DEPTH FT. (ELEV. ) AFTER DAYS HRS.
FT. (ELEV. ) AFTER DAYS HRS.
TOP PVC/CASING ABOVE SURFACE FT. (ELEV. )
BOTTOM SCREEN MEASURED FROM TOP PVC/CASING FT. (ELEV. )
SCREEN SPEC. RISER FT.
DRILLING METHOD SCREEN FT.
SAMPLING METHOD TOTAL FT.
SAMPLE DEPTH DESCRIPTION
Z-0 5�
- FT
- -� FT QZ-1L)6 777L G2� l �5OJC�. o1S�
FT
FT
FT
FT
FT
FT
FT
FT
COMMENTS:
a4-I2 ALNIER HLNtTLEY, JR., & ASSOCIATES, INC.
SL'RVEyORS - ENGINEERS - LANDSCAPE ARCHITECTS
to ! _� Md�
HUNTLE
9920�
HUNTLEY ASSOCIATES, P.C.
SURVEYORS.ENGINEERS.LANDSCAPE ARCHITECTS
November 20,2003
City of Northampton
Office of Planning&Development
210 Main Street
Northampton,MA 01060
Attn: Ms. Carolyn Misch, Senior Planner r
RE. Hockanum Road Townhouse Project,Addendum
Huntley Project No.03-006
Dear Ms. Misch:
Huntley Associates, P.C. (HAPC) is pleased to submit the following additional information for the
proposed Hockanum Road Townhouse Project in Northampton. Please recall that our client, Mr.
William Gruber proposes to construct two townhouse buildings with a total of 14 units on Hockanum
Road.
In response to a request from the Department of Public Work (DPW), a test pit was excavated in the
area of the proposed stormwater detention.pond. On November 20. 2003, JC Construction excavated
the test pit to a depth of approximately 80-inches. HAPC observed the excavation and visually
inspected the soil for evidence of soil mottling (an indicator of high or perched ground water), see
attached test pit log.
Based on our visual inspection of the test pit soil cross-section, no soil mottling, seepage, or standing
water was observed. Soil stratigraphy consists of 3 to 4 feet of fill, and the remaining soil appeared to
consist of silt and silt-sized material. I ,ddition, during excavation a vitrified clay nine LVCP) was
encountered and damaged. The 8-inch diameter drainage pipe (as determined from fluid and lack of
offensive odor) was immediately repaired utilizing rubber couplings, stainless steel screw-tight
fasteners, and a section of 8-inch diameter PVC pipe. The VCP was located approximately 70-inches
below ground level(see attached sheet).
If the Board has any questions or comments regarding this matter,please contact me at our office.
Sincerely,
HUNTLEY ASSOCIATES,P.C.
Mark McClusky,P.
Engineering Project Director
cc. William Gruber
W•\03 006\CORESPOND\SPL eR3 DOC --
30 INDUSTRIAL DRIVE EAST.NORTHAMPTON, MASSACHUSETTS 01060.(413) 584-7444 .FAX(413) 586-9159
1885 STATE STREET•SCHENECTADY, NEW YORK 12304 .(518) 393-4767 .FAx(518) 393-3510
16-18 REYNOLDS AVENUE.ONEONTA, NEW YORK 13820 .(607) 432-3300.FAx(607) 432-8313