23B-046 (202) THOMPSON CONSULTANTS , INC. Cooley Dickinson Hospital
Obstetrics Addition
Page two Job Number 32-275-C
January 25 , 1991
AM-618
3. Fire alarm system will be connected to the City via leased
telephone line , not by Gamewell master box.
FIRE PROTECTION
1. Free standing Siamese fire department connection shall be
required by the Fire Department, by the canopy circle drive .
2 . The Building Inspector will review the plans and comment
including if it is to be considered a high rise.
3 . Ground Floor FDC to be moved to corridor location.
4. TCI to check number of hydrants located around new building
addition.
GENERAL
1 . Minutes of meeting shall be forwarded to Building
Department.
2 . TCI original drawings to be submitted to RRH for bid on
February 15 , 1991 .
3 . TCI to meet with plumbing and electrical inspectors as soon
as possible.
Ronald C. Furbish
/lac
cc : All Present
RT Battles
WD Johnston
Hospital
obstetrics ley Dickinson Addition
32_275-C
CONSULTANTS , JAN 2 81991 Job Number 2 � 1991
THCMV cON January Alrt_618
14ar ion DEPT Of 8UILOING INSPECTIONS
Massachusetts ORTHAMPTON MAO1060
at CDH on January 24 , 1991
Building
Inspector
Bu
Meeting Department
Northampton Fire I ospital
F . Sienkiewicz Dickinson Hospital
present: Cooley
M. Driscoll Cooley Dickinson Hospital
I,• Weissbach Cooley Dickinson eman
Margeson Rothman & Hein
E. Rothman Inc .
F . Furman Thompson Consultants , Inc
.
T . Kenyon Thompson Consultants ► Inc .
RE LeBlanc Thompson Consultants , __"
RC Furbish ________________
EF Gunschel
fire damper in
x.V.Z�.C-r corridor
requires
2 hour egress
1. Basement rise. Building
ductwork. high e his mind.
not considereaiew and Chang
building is the right to re
2 . The reserves used.
Inspector 87 BOCA would be
Code and the HVAC system
3 . New Massachusetts as to using negative no
discussed, Incident create Flow
control system floor of no exhaust.
4 . Smoke Exhaust above and below
for control• floors
supply. Supply. smoke dampers •
fire
controlled by West Building penetrations.
5 _
pick up F .D. s at
6 . No ATC panel required at building entrance•
drawings• to be
� . ??ev iewed
mechanical pneumatic controls
and Honevwell
Andover DDC Frank Furman• an
8 . Aldo ec , per to
RR
proprietary sp to be delivered
specificGtions
9 .
Originals andQ91 .
February 15 ,
t room is required even though
T'LECTRICAL atien
detectors in each F
1 . Smoke s rinklered. building
will be connected to
room is P rooms station.
in patient the nurse
2 ,
Each ll be annunciated at
sys