Loading...
23B-046 (191) L�. ARCti1TECTS INC. February 2, 1993 Itu'�B[rncn,A.I.A. 1,,k,xd L.Irndn A.I.:A. PRiSCIiSll r.«I(,i 1 nuekrr.ALA City of Northampton �\111111,1n, 210 Main Street ,Icw Ilt Ati(X:L11, Northampton, Massachusetts 01060 yi•rc l�.,irikuirh.A.IA. �""'L' � t'°' °��"°"` ATTN: Mr. Frank Sienkiewicz, Building Inspector Re: Mobile M.R.I. Cooley Dickinson Hospital Dear Mr. Sienkiewicz: In regards to the new corridor construction for the mobile M.R.I. van at Cooley Dickinson Hospital, 30 Locust Street, Northampton, Massachusetts; Architects Inc. has supervised the construction process to provide a new corridor on the Ground Floor next to the Emergency Department and Radiology Department for the use of providing access to a mobile diagnostic van. In our opinion, all applicable building codes and procedures have been met and the Unit is suitable for occupancy. Sincerely, ARCHITECTS INC. rt t Eclward L. Jeid , A.I.Q. EL7/acp cc: Jebb Dennis ARC JEIVUy�F n No. M oS N 6. Q CONWAY j.. S MASSE W 78 MAIN STREET/NORTHAMPTON,MASSACHUSETTS 01060 (413)584-7224 A 109 CONCORD STREET/FRAMINGHAM,MASSACHUSETTS 01-01 (617)8-2.8373