23B-046 (191) L�.
ARCti1TECTS INC. February 2, 1993
Itu'�B[rncn,A.I.A.
1,,k,xd L.Irndn A.I.:A.
PRiSCIiSll
r.«I(,i 1 nuekrr.ALA City of Northampton
�\111111,1n, 210 Main Street
,Icw Ilt Ati(X:L11, Northampton, Massachusetts 01060
yi•rc l�.,irikuirh.A.IA. �""'L' �
t'°' °��"°"` ATTN: Mr. Frank Sienkiewicz, Building Inspector
Re: Mobile M.R.I.
Cooley Dickinson Hospital
Dear Mr. Sienkiewicz:
In regards to the new corridor construction for the mobile
M.R.I. van at Cooley Dickinson Hospital, 30 Locust Street,
Northampton, Massachusetts; Architects Inc. has supervised
the construction process to provide a new corridor on the
Ground Floor next to the Emergency Department and Radiology
Department for the use of providing access to a mobile
diagnostic van. In our opinion, all applicable building
codes and procedures have been met and the Unit is suitable
for occupancy.
Sincerely,
ARCHITECTS INC.
rt
t
Eclward L. Jeid , A.I.Q.
EL7/acp
cc: Jebb Dennis
ARC
JEIVUy�F
n
No. M oS N 6.
Q CONWAY j..
S MASSE W
78 MAIN STREET/NORTHAMPTON,MASSACHUSETTS 01060 (413)584-7224 A 109 CONCORD STREET/FRAMINGHAM,MASSACHUSETTS 01-01 (617)8-2.8373