Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
23B-046 (183)
PERMIT APPLICATION CHECK LIST PAGE PLOT ZONE ?�� �� �` YES NO DATE 1 . ZONING FORM APPLICATION 2 , PERMIT APPLICATIO 3 . OWNER OCCUPANT STATEMENT LIC J IF NOT 4 . 3 SETS OF PLAN 5 . NEW CONSTRUCTION 6 . CURB CU 7 . WATER AVAILABILITY FORMS 8 . REMODELING INTERIOR 9 . ADDITION 10 . ACCESSORY STRUCTURE 11 . SIG AWNING 1 2 . PERMIT FE — CHECK ONLY — MONEY ORDER 13 . SPECIAL PERMIT REQUIRED WITH DEED IF APPLICABLE 14 . UNDER SECTION 127 - CMR 780 15 . FORM A rr// 1 6 . F I L L 7u.Q�0 6J �-t v►u v�Lyc y�n�t,ru� } t w- � COMMENTS : i Mr. Frank Sienkiewicz May 28, 1993: Page 2 -- - -- I would be pleased to discuss this further. In the meantime, thank you for the prior discussion confirmed by this letter. Very truly yours, B jami A. Barnes BAB/and cc: Kathleen Fallon i i i 6 I i { r t 18 F i f E { F 4 i j r Barnes 6L Etheredge --- LAW OFFICES,INC. 64 Gothic Street ?I i'' ""t1 Northampton, Massachusetts 01060 BENJAMIN A.BARN ES P (413)584-0368 EDWARD D.ETHEREDGE FAX 1413!585-5125 MYRAG.ORLEN• nTl��'4$ SHELLEY STEUER Also Admitted in Maine •Also Admitted in New York do California May 28, 1993 Mr. Frank Sienkiewicz Building Inspector City of Northampton 212 Main Street Northampton, MA 01060 Re: Cooley Dickinson Hospital Finding Map 23B, Parcel #46 Dear Frank: Following our discussion of yesterday concerning whether the Hospital requires a finding for the mechanical penthouse addition and the new ashpit addition as described, I reviewed Article IX, Section 9 . 2 of the Northampton Zoning Ordinance, "Extension and Alteration", M.G.L. c. 40A, Section 6, and the case of Nichols v. the Board of Zoning Appeals of Cambridge, 26 Mass. App. Ct. , 631 (1988 ) . Under our Zoning Ordinance, Article IX does not apply to structures or uses lawfully in existence before the first publication of notice of the public hearing on the original Zoning Ordinance. This is the case for Cooley Dickinson Hospital. However, a Finding is required even if the use remains the same if there is going to be. any reconstruction, extension or structural change of such structure. The proposed activity at the Hospital with respect to the mechanical penthouse addition involves no change in the footprint of the building, and, with respect to the ashpit addition, it requires the addition of a pit 101 by 14 ' at the rear of the building. Such an addition to the footprint for the purposes of the treatment of ash in compliance with law creates no violations of our current Zoning By-Law. Accordingly, consistent with the Nichols case above, and the fact that the activity proposed does not constitute a reconstruction, extension or structural change of the Hospital structure, I believe that the Zoning Permit for the activity requested may be approved without the requirement of a Finding. 1. Mechanical Penthouse Addition Anew Mechanical Penthouse would be constructed on top of the existing Radiology Department, ground floor, adjacent to the south end of the West Wing. Also, as part of this addition, a new vertical shaftway would be constructed up the face of the southerly end of the West Wing. The new Mechanical Penthouse and vertical shaftway is being proposed to house new heating, ventilating and air conditioning equipment and related items that would upgrade the mechanical systems in the West Wing. The new Penthouse Addition is approximately 36 feet by 52 feet in area, for a total area of 1, 872 square feet. 2 . Ash Pit Addition A new ash pit addition would be constructed on the south side of the existing wood burning boiler plant. The new addition would temporarily contain ash residue from the plant until it was hauled away to a disposal site. The size of the new ash pit would be approximately 10 feet x 14 feet for a total area of 140 square feet. i { i i f 000952 Date Filed File No. ZONING PERMIT APPLICATION (510 . 2 ) 1. Name of Applicant: Cooley Dickinson Hospital Address: 30 Locust Street, Northampton, MA -Telephone: 584-4090 2 . Owner of Property: Cooley Dickinson Hospital Address : 30 Locust Street, Northampton, MA Telephone: 584-4090 3 . Status of Applicant: X Owner Contract Purchaser Lessee Other (explain: ) 4 . Parcel Identification: Zoning Map Sheet# a_j Parcel# 04 , Zoning District(s) (include overlays) U R Q Street Address Required 5 . Existing Proposed by Zoning Use of Structure/Property Hospital (if project is only interior work, skip to #6) Building height 64.5 Feet 64.5 Feet %Bldg. Coverage (Footprint) 10.9% 10.9 % Setbacks - front 102 Feet 102 - side L: 400' R: 42 1 L: 400, R: 42' - rear 18 Feet 18 Feet Lot size 969,427.8 9691,427-8 Frontage 2,658 2,658 Floor Area Ratio .339 .339 %Open Space (Lot area minus building and parking) 60.7% 60.7% Parking Spaces 630 630 Loading Signs N/A N Fill (volume & location) N/A N 6 . Narrative Description of Proposed Work/Project: (Use additional sheets if necessary) See Attachment 7 . Attached Plans : X Sketch Plan X Site Plan 8 . Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowlegrEthe Date: Applicant' s Signature: _ _ _ _a_d re dge _ tto for Owner THIS SECTION FOR OFFICIAL E ONLY: t%Approved as presented/based on information presented , Denied as presented--Reason: Special Permit and/or Site Plan Required: Fi ding quired: Variance Required: gnatitr-d of Build -nspector `l'�P D to NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health, Conservation Commission, Department of Public Works and other applicable permit granting authorities. Barnes & Etheredge LAW OFFICES,INC. 64 Gothic Street Northampton, Massachusetts 01060 BENJAMIN A.BARNES (413)584-0368 EDWARD D.ETHEREDGE FAX 14131585-5125 MYRA G.ORLEN SHELLfiY STEUER •Also Admitted in Maine Also Admitted in New York&Calltornia June 2, 1993 Liz Weissbach, Vice President Operations The Cooley Dickinson Hospital 30 Locust Street Northampton, Massachusetts 01060 Re: Mechanical Penthouse and Ash Pit f Dear Liz: i l Enclosed is the original Zoning Permit Application endorsed approved by Northampton's Building Inspector along with a copy of my letter to him of May 28 , 1993 indicating why no finding was necessary. You may now apply for a building permit and commence work. We have retained a copy for our files. Very truly yours, enjamin A. Barnes j: BAB/kh Enclosures { a 0 D b —• -v 7C 3 p Zm C% o �i Ri "t in Z Z 5• o 0 m Zoning 30,9 Miscellaneous Additions,Repairs,Alterations,etc. gTel.No._�a�� 5 � Alterations NORTHAMPTON, MASS. `L! �7�" ,/ 191Z Additions_X ' APPLICATION FOR PERMIT TO ALTER Repair Garage 1. Location c Lot No. 2. Owner's name Address_--3 4 3. Builder's name Address /lv Mass.Construction Supervisor's Licen No, ppC)a 1 q 2 p pExpiry A n Date 4. Addition,X f�,#' X /.-� 5. Alteration 6. New Porch 7. Is existing building to be demolished? 8. Repair after the fire 9. Garage No.of cars Size 10. Method of heating 11. Distance to lot lines 12. Type of roof 13. Siding house 14. Estimated cost:-#f ©�� • The undersigned certifies that the above statements are we to the best of his, her knowledge and belief. Signature of 06 onsible appicant Remarks ro �. ac � O �+a'•av, A f1Q �D OK 0"� O 'v 14 o R. sv A o rt y car � �b G z o 0 ` 1 d o A o C. o O y O 0 50 IQ N ., � Z f9 N ° rD o w b O N rt 1 � 6 ~ r� O 7d o c cn LO CD rd 5 0 F- y (JQ O O O O O N O y a W o. v; o tz cjn Cp CrQ CD y \ 1