Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
23B-046 (85)
TRO w-Limm No. 102 Ia4 Project: COOLEY DICIgN90N HOSPnX Re: FIRST FLOOR LABORATORY RENOVATION REFLIErED CE]IJNG PLAN eYrA`..iri9`_T" Comm No. 2327 W.O. No. 77102 Doc. Ref. A301 Date 7/20/04 PLOUDA EX COL TO REMAIN • 2 HR RATED HORIZ. SHAFfWALL ASSEMBLY Y, ❑ GWB CEILING TEST NO.: WHI-495 PSH 0154/0167 PM EX CEIL ® ❑ NEW GWB SOFFIT (PTD) ❑ =s PM EXIST SOFFIT NEW SOFFITWB ❑ ® ❑ B 1� r � L L J A RCHITECTURE DRAWN BY' wd PLANNING S EWED BY- ENGINEERING IN -1'-0 I NTSRIoiL DESIGN SHEET NUMBER. BLUM-03 TRO aINJ.ETIN Na COQ &0n ' - �pak" Project: COOLEY D ON HOSPITAL Re: FIRST FLAOR PLAN 0174094M LABORA70RY FBWA71ON Au:u"'�" Comm No. 2327 W.O. No. 77102 Doc. Ref. A201 Date 7/2%4 ftO=DA F SWBD CORR 1021—LA OF (GA" 1022—LA P �� M EXIST N� CLR (DON SHRDNIE) CHAIR RAIL ui G 1020—LA PROVIDE NEW STL LINTEL FOR ————NEW OPENIN S FILL EXIST OPNG. 2 NR MATCH EXIST CONST. co EMERG WW Xa G I ELEC B2 WALLS OF EXIST I SPRINKLER ROOM WOMEN J.C. MEN w0- OFF BELOW. VERIFY LOCATION 11 CD 10 — IN FIELD e G I B2 0 4 — — ---- FIRST FLR G EQUIP. EL+238'-6 1/2" 4 1 OFF A STOR• I E I PM EXIST 1026—LA CHAIR RAIL PM EXIST PNT BO WALL H _. OFF ) SIDES . (MARM 1019- 8 ON I 102 CORR 1024_LA r ' ABOTH SIDES) pN EX FIRST FLR I - i Q EL+238'-6 112n L L AICHITICTUIS DRAWN BY. K1 PLANNING REVIEWED BY: 1� -11-r BNGIN88IINd INT8IIOI DSiIGN SHEET NUMBER: X102-02 l THO BULIM N No. In N Ndp8bW �u Project: COOLEY DICK6r90N H06P E& Re: FlFW FLOOR MOLRION PLAN 617-004M LABORGOW RMA71ON A s mu"�' Comm No. 2327 W.O. No. 77102 Doc. Ref. A101 Date 72%4 FLORIDA F SECURITY OFFICE NU OUTPATIENT W NUTRITION 3 4 Li W -J:z WW W¢ J.C. MEN WOMEN EMOVE ENTIRE M EXIST GLAZING AND STORAGE FRAMES � Z ) FIRST FLR EQUIP. EL+238'-6 1/2" 1 I STOR. IF i I CHAPLIN OFFICE CORR. I DN DN OIL EX FIRST FLR I 0 EL+238'-6 1/2 EX. ELEC �r PANEL MULTI-PU L L A ICHITSCTUILB DRAWN BY: PLANNING $�REVIEWED BY* 1/V -1'-v $NdIN881ING I NTllIol DESIGN SHEET NUMBER: BUIL102-01 R a � 44'-ii� r � � � Memorandum �_ , A �,, 2004 �tlG 2 - To: Anthony Patillo—Building Commissioner DEPT Of 8lllLDING 14SPEC110NS NC,PTE�AMViON,MA OIOSO CC: File/Project Team From: Juanita M.Forsythe—Cooley Dickinson Project Manager Date: 7/29/2004 Re: Laboratory Renovation Project—Electrical Room 15'Floor Tony, Attached is a set of drawings for the Laboratory Renovation project currently active that depicts revisions to the electrical room planned for the I"floor.The room is scheduled to be revised to accommodate the installation of an electrical closet as originally planned in the submitted and approved drawings.We are also looking to modify the rest of the room by creating two offices in the remaining space.Cooley Dickinson is requesting this additional scope of work to the base project. Please contact me at 413-586-7878 or Norm Welch at 413-582-2311 if you have any questions. The builder of this portion of work remains Barr&Barr—all subcontractors listed remain the same. Including Collins Electric as the electrical subcontractor The architect remains TRO Architects as originally listed. Thank you in advance for your time as I know you are busy. Juanita M.Forsythe 1 w Q#Ve � � �� Planning Board - Decision City of Northampton Hearing No.: PLN-2004-0094 Date: July 7, 2004 5. The requested use does not trigger compliance with special regulations set forth in the Zoning Ordinance. 6.Compliance with the following technical performance standards have been met: A.Curb cuts are not affected/changed. B.Pedestrian,bicycle and vehicular traffic movement on site have been separated, to the extent possible,and sidewalks within the site have been provided to the street. C. The applicant has shown that there is no increase in peak flows from the two(2)and ten(10)year Soil Conservation Service design storm from pre-development conditions(the condition at the time a site plan approval is requested)and the runoff from a 4110 inch rain storm(first flush)is detained on site for an average of six hours. Existing flows from the surface lot will be eliminated and all runoff from new surfaces will be directed into the sanitary sewer in accordance with the Massachusetts Plumbing Code. COULD NOT DEROGATE BECAUSE: FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE: 61312004 611712004 71812004 REFERRALS IN DATE: HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE: 611012004 81712004 612412004 71812004 712712004 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 611012004 612412004 612412004 71712004 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 611712004 8:55 PM 912212004 912212004 MEMBERS PRESENT: VOTE: William Letendre votes to Grant Francis Johnson votes to Grant George Kohout votes to Grant Keith Wilson votes to Grant Kenneth Jodrie votes to Grant David Wilensky votes to Grant MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION: William Letendre Francis Johnson 6 Approved with Conditions MINUTES OF MEETING: Available in the Office of Planning&Development. 1, Carolyn Misch,as agent to the Planning Board, certify that this is a true and accurate decision made by the Planning Board and certify that a copy of this and all plans have been filed with the Board and the City Clerk on July 7, 2004 1 certify that a copy of this decision has been mailed to the Owner and Applicant GeoTMS®2004 Des Lauriers Municipal Solutions,Inc. Planning Board - Decision City of Northampton Hearing No.: PLN-2004-0094 Date: July 7, 2004 utilities shall be addressed 10. Prior to issuance of certificate of occupancy,landscape planting plans for the evergreen screen along the south and east property boundary must be submitted to the Board for review and approval. 11. One year from issuance of a certificate of occupancy, the applicant must return for review of the garage lighting.If the Board determines that additional architectural screening along the east and south side of the garage is necessary,such screening shall be added to eliminate the impacts of the 2nd and 3rd floor lighting on the abutting residences. 12. This permit does not grant approval for any future development at the hospital nor imply completion of traffic analysis for future building scenarios. The following items should be evaluated further prior to submission of plans for the surgical wing: a. further traffic analysis and review must be completed and submitted including evaluation of the signalized intersection of the main hospital entrance at Locust Street with analysis of a pedestrian phase; b. further traffic evaluation of impacts at the Woodlawn/Jackson Street and Prospect Street intersection; c. evaluation of the existing pedestrian and bus shelter location across from the Easthampton Savings Bank; d. traffic calming options along N.Elm Street; e.petition for discontinuance of a portion of Hospital Road; f. evaluation and discussion of water and sewer fee structure with the City; g.stormwater management should be evaluated for the entire portion of the property that does not outlet into the detention pond. All water,sewer,and drain lines should be evaluated to determine which are utilized. Sheet flow across Hospital Road should be addressed. The Planning Board granted Site Plan Approval based on the following plans and information submitted on the plans,as amened by conditions herein: 1)."Site Plans Cooley Dickinson Hospital Parking Garage",prepared by Vanasse Hangen Brustlin,June 2, 2004.Plan sheets C1.1-05.3. 2)"Site Plans Cooley Dickinson Hospital Parking Garage",gound floor plans and elevations prepared by Vanasse Hangen Brustlin,Barr &Barr Builders,Inc.and Walker Parking Constultants,June 2,2004.Plan sheets A1.1-A2.1. 3). "Site Plans Cooley Dickinson Hospital Parking Garage", Topographic Surveys prepared by Huntley Associates,PC,May 21,2004.Plan sheets 1-5. 4). "Light Spill Study"June 24, 2004. 5). "Parking Study:Cooley Dickinson Hospital Surgery Expansion and Medical Office Building",Prepared by Vanasse Hangen Brustlin, Inc., dated March 23,2004. 6). "Traffic Impact Study:Cooley Dickinson Hospital Expansion",Prepared by Vanasse Hangen Brustlin,Inc.,dated March 23,2004, 7). "Stormwater Management Report.Cooley Dickinson Hospital Expansion",Prepared by Vanasse Hangen Brustlin,Inc.,dated June, 2004. 8). "Technical Appendix:Cooley Dickinson Hospital Expansion",Prepared by Vanasse Hangen Brustlin,Inc.,dated April, 2004. In granting approval of the Site Plan the Planning Board found: 1.The requested use protects adjoining premises against seriously detrimental uses,including mitigating stormwater runoff,sound and sight buffers and preservation of views,light,and air. The new garage will be located in the corner of the property behind a grove of deciduous trees and will be screened by evergreens from the abutting properties. Stormwater will be treated through the sanitary system;and 2. The requested use will promote the convenience and safety of vehicular and pedestrian movement within the site and on adjacent streets,minimize traffic impacts on the streets and roads in the area including the arrangement of parking and loading spaces,and provisions for persons with disabilities. The applicant will be improving the parking deficit and sidewalk connections from North Elm Street to the main entrance will be created. The exit on Denniston Place will be restricted to right turn only. The project,including any concurrent road improvements,will not decrease the level of service(LOS)of all area roads or intersections effected by the project below the existing conditions because no additional employees are planned as a result of garage construction. 3.The requested use will promote a harmonious relationship of structures and open spaces to the natural landscape,existing buildings and other community assets in the area. The public fagades will be brick block to match the hospital fagade and the structure will be built into the hill so that one of the four levels will be partially obscured. 4.The requested use will not overload,and will mitigate adverse impacts on,the City's resources including the effect on the City's water supply and distribution system,sanitary and storm sewage collection and treatment systems,fire protection,streets and schools. The applicant will connect to the sanitary sewer line in North Elm, which has capacity. GeoTMS®2004 Des Lauriers Municipal Solutions,Inc. r Planning Board - Decision City of Northampton Hearing No.: PLN-2004-0094 Date: July 7, 2004 APPLICATION TYPE: SUBMISSION DATE: PB Major Site Plan 6/3/2004 Applicant's Name: Owner's Name: Surveyor's Name: NAME: NAME: COMPANY NAME: VANASSE HANGEN BRUSTLIN INC COOLEY DICKINSON HOSPITAL INC ADDRESS: ADDRESS: ADDRESS: c%John Furman c/o Richard Corder 505 East Columbus Avenue 30 LOCUST ST TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: SPRINGFIELD MA 01105 NORTHAMPTON MA 01060 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: (413) 747-7113 0 (413)582-2000 0 (413)585-8664 EMAIL ADDRESS: EMAIL ADDRESS: EMAIL ADDRESS: Site Information: STREET NO.: SITE ZONING: 30 LOCUST ST M r m� �' l C' Jj I °- TOWN: SECTION OF BYLAW: NORTHAMPTON MA 01060 Section 11:Site Plan Approval MAP: BLOCK: LOT: MAP DATE: ACTION TAKEN: �r) 1 i 23B 046 001 Approved With Conditions J J UI L — L.,04 Book: Page: i I 2485 335 ---.—.-__,_. NATURE OF PROPOSED WORK: Proposed 660 space parking garage.Project includes work on Map ID 24C-41. HARDSHIP: CONDITION OF APPROVAL: 1. Prior to issuance of a building permit the applicant must obtain sign-off from Office of Planning& Development(OPD): a. submission of a schedule showing the times at which the lights on the top of the garage will be turned off at night, throughout the year. Timing may vary according to the season; b. indicating that final arrangements have been made between the Hospital and a third party to accommodate temporary parking for all parking spaces that will displaced for this construction. Plans must show that temporary parking commences no later than the date construction is to begin; c. indicating that all of Denniston Place has been formally discontinued(necessary prior to work within the public right-of-way. Other work may begin outside of the right-of-way). 2. A 5'wide concrete sidewalk shall be constructed along Denniston Place from the intersection of North Elm Street to connect to the parking lot end-islands. Crosswalks shall be striped and maintained to create a continuous pedestrian path from Elm Street to the main entrance of the hospital. 3. The sidewalk across Denniston Place at North Elm Street shall be striped as a pedestrian crossing. 4. The two existing crosswalks across Locust Street must be repainted and adequate signage must be posted in conformance with the Manual on Uniform Traffic Control Devices for midblock crossings. This shall include painting of yield lines(triangles)in advance of the crosswalk. 5. Left turns(westbound)from Denniston Place shall be restricted through hardscaping/island. 6. The "Do Not Enter"sign at the west end of Denniston Place shall be removed. 7. Due to capacity issues of the sanitary line on Hospital Road, the applicant shall direct sanitary flows from the garage to the North Elm Street line. Sewer rates and coordination with DPW for pretreatment of this new discharge will apply. 8. Construction vehicles may not utilize Hospital Road for access to the site. 9. The Department of Public Works water issues relating to backflow prevention and the relocation of GeoTMS®2004 Des Lauriers Municipal Solutions,Inc. RAYMOND R. HOULE JOB BUDGET CONSTRUCTION INC. PHONE: 582-2314 DATE: 05/03/04 187 EAST STREET JOB NAME/LOCATION: SOUTH HADLEY, MA 01075 McCallum 2"d Flr Office Rm 222a Phone: 413-532-9243 Fax: 413-532-0413 Members of A.S.H.E.(American Society for Healthcare Engineering) Healthcare Contractor Certified Licensed Firestopping Contractors TO: Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01061 ATT: Scott Johnson JOB DESCRIPTION: We propose to furnish all necessary labor and material to complete the work described below. 1) Provide a temporary wall for infectious control purposes. 2) Provide negative air and floor matting to prohibit the spread of debris and control air borne contaminants. 3) Remove the existing walls, and flooring as shown on the attached sketch. 4) Close and seal off 2 existing doorways. 5) Cut a new door opening into the existing Corridor wall. The new door will match the existing doors as closely as is possible. 6) Patch the areas disturbed by demolition. 7) Firestop as required. 8) Install a new door, frame and hardware into the new opening in the existing corridor wall. 9) Install a new acoustical ceiling in the new office area. 10)Install new flooring in the new office area. 11)Paint the new office area and touch up any areas disturbed by the new construction. 12)HVAC Allowance $ 1,000.00 13)Plumbing Allowance $ 1,620.00 14)Sprinkler Allowance $ 1,620.00 15)Electrical Allowance $ 2,025.00 16)Provide a final cleaning of the area upon completion. 17)Remove all temporary installations and infectious control equipment upon completion. We are pleased to quote you our price of$ 26,520.00 for the work outlined above. EXCLUSIONS: No work, other than that which is described above is included in our quote. m x 5 co Cl) 5' X CD -, 0 0 cn s' 0 rn _ x N• � =3 m co � CL - v0 - - - - - - - - - - - - - - - - - - - - — 0 - - - - - - - - - r 0 CD -0 ;Q0 0 � o w0 N v vo0 ~,< O NO x O CD CD � _ � (D :3 0 CL W X. o co � 0. � Ln� CD � � o on E-- 0 0 ry C7 0 Po o C/) 3 -n rt O J 3 x � _ N y -V 0co < r– '0Cnfn (,� CN =3 0T. NC2ca' E6-0 fD W Q C N fD N 3 E- - - cn s 3 R N N O o �cocc0ccnn (n v 0 0 0 � ° o rn cm CD W n CD co 0 0 RAYMOND R. HOULE JOB BUDGET CONSTRUCTION INC. PHONE: 582-2314 DATE: 05/03/04 187 EAST STREET JOB NAME/LOCATION: SOUTH HADLEY, MA 01075 McCallum 2nd Flr Office Rm 222a Phone: 413-532-9243 Fax: 413-532-0413 Members of A.S.H.E.(American Society for Healthcare Engineering) Healthcare Contractor Certified Licensed Firestopping Contractors TO: Cooley Dickinson Hospital 30 Locust Street Northampton, MA 01061 ATT: Scott Johnson JOB DESCRIPTION: We propose to furnish all necessary labor and material to complete the work described below. 1) Provide a temporary wall for infectious control purposes. 2) Provide negative air and floor matting to prohibit the spread of debris and control air borne contaminants. 3) Remove the existing walls, and flooring as shown on the attached sketch. 4) Close and seal off 2 existing doorways. 5) Cut a new door opening into the existing Corridor wall. The new door will match the existing doors as closely as is possible. 6) Patch the areas disturbed by demolition. 7) Firestop as required. 8) Install a new door, frame and hardware into the new opening in the existing corridor wall. 9) Install a new acoustical ceiling in the new office area. 10)Install new flooring in the new office area. 11)Paint the new office area and touch up any areas disturbed by the new construction. 12)HVAC Allowance $ 1,000.00 13)Plumbing Allowance $ 1,620.00 14)Sprinkler Allowance $ 1,620.00 15)Electrical Allowance $ 2,025.00 16)Provide a final cleaning of the area upon completion. 17)Remove all temporary installations and infectious control equipment upon completion. We are pleased to quote you our price of$ 26,520.00 for the work outlined above. EXCLUSIONS: No work, other than that which is described above is included in our quote. GThi cf 'Ncrt(}ullip oll _ .a = f r?a S a RC�rt c c I tf• _ � ,p.a Dc?/5i^,',1c1fT GP DUi(A!?�G (NSP°CTIOt1S --�g .Fg 212 Alain Strcct ' Nfun•iclpal DoildIng Northampton, Mass. 01000 L, — Ra mond R._Houle Construction Inc. pi~incipa-I place of businesslresid°ace at: 187 East St. South Hadely, MA 01075 phone::) 413-532-9243 (suc- ci cy/suir-/27 P) do hereby certify, under tflc pzirs -,ad pen2?ties of perjury, hz: k)� an crnp!oyer providLin- dl c cocnocnsz:iOn For Ins' Clnp!o ccs wor,ing on't<iiS job. Arch Insurance Company IRWC100737 12/31/04 t7—) I.= a sole propriCior, Sect,-21 CAIIu actor Or homeovmer (CL"C.:Z o^t) 2J0 hc%'e !MCC Uhc coca-aci,jr-, li5Fd be!ov-i ;quo h?ve tht fok v' 2 wor 1:er'S cooDtn.-non pokieS: 0 C0CL'dC,0 . .. .-._ . � � ..� Datc) (7.Namc of coca-anor) (_csuraaw Co�czn-f(i'olicy I� h ) tc��i.^loo Dz r). (s =Zx_1 ctc itoccc y c0 cc'vc ( ) l z so!c props e,or 2--ad t2ve no Oct wor'ring for me, O ! am a how e ovroer D--r"O=i g z! the work toys°`. NG`:Pl=s be rtC is bcocwx +A c p1Orf ca t - - -�^c x c w o k r_.d.• :•:or cc 1---d c c.�lo=-;uG=Sc�'�i:,_-':�—�.�- �m 1=.(G�l S'_�^_I(S);,_,'7i:�.JC;'�•; a hc^�ax;c:1+�.a;,�-..i:r, :.�Cocc:`� f�.c-.-�G."�...e a m7Y oC�S.i,� c..y`x(o.-rv.^d....[o t..o ^v<�...r�n-c o(10-i:;ri���aCs.!C•T.00 o(;+-_�•+�Cx;S. x- cc25 Ac!.GL 151cz-- tx= -==CCCr �a o cc<-:=-:c o!a x or t--?W S 1-500.00 oCup W cx y_•- c�7 x^y�a 5c fc�or.S-cp W--,or--C-u + For -- O Lot S: u- o Li sr�lPcrrric:cc C ) . Version 1.7 Commercial Building Permit Nlay 15, 2000 SECTION 10. STRUCTURAL PEER REVIEW(78.0 CMR 110.1 Inceoendent Structural Engineering Structural Peer Review P,ecluired Yes......0 No......[A SECTION:11-='OWN,ER AUTHORIZATION-JO.BE COMPLETED WHEN OV,NERS'AGENT OR CONTRACTOR APPLIES FOR-BUILDING PERMIT . as Owner of the subject proper:f he—by authorize Raymond R. Houle Construction Inc. . c r7v behalf, in all matters rela`ive 'Lq work authorized by this building permit pplic ;ion. tc a_ SIZ. ature of Owner Date Timothy S. Pelletier as Owner/Authorized Agein, he-eby declare that the statements and information on the foregoing application are true and accurate, to the best of my kn_wledge and belief. Si:7',ed under the pains and penalties of perjury. Timothy S. elleti Prir.: Name Si,-.ature of Owner/Agent Date SECTION 12 - CONSTRUCTION.SERVICES 10.1 Licensed Construction Supervisor: Not Applicable 0 Na^e of License Holder : Timothy S. Pelletier 066227 License Number 187 East St.South dley, MA 01075 07-07-2005 A Expiration Date / 413-532-9243 Sig-=cure Telephone SECTION 13 -WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M G L.c`152,:§ 25C(6)) Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this -a-""c w' -cult in the deriia! of the issuance of the building permit. Affidavit A.ttachej Yes....... X No...... 0 -- Version 1.7 Commercial Building Permit Mzy 15,2000 SECTION 9.,PROFESS{ONAL DESIGN IAND CONSTRUCTION SERVICES - FOR.6U1_LDINGS AND STRUCTURES SUBJECT To CONSTRUCTION CONTROL P.11RSUANTTO780.CMR 136-(CONTAINING MORETHAN`35;000CE ?OF--ENCLOSEDSPACEj 9.1 Registered Architect: Not Applicable D N'zme(Registrant): , Registration Number Address Expiration Date Signature Telephone i 92 Registered Professional Engineer(s): Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date f Name Area of Responsibility V Address Registration Number Sig-,ztur Telephone Expiration Date 9.3 General Contractor i Raymond R. Houle Construction Inc, Not Applicable ❑ Cor--a-,v Name j Timothy S. Pelletier Res-:-s pie In Cha.,ge of Construction 187 East 010'r7 f 413-532-9243 Telephone Versionl.7 Commercial Building Permit May 15,2000 7.Water Supply(M.G.L.c.40,§ 54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public)M Private ❑ 1 Zone: Outside Flood Zone l< Municipal 12 On site disposal system ❑ 8. NORTHAMPTON ZON- NG Existing Proposed Required by Zoning 'This column to be filled in by Building Department Lot Size 969 427.8 969427.8 Frontage 2,658- 2,658- Setbacks Front 102 102' Side L:$g!_R: 42, L: gg I R: 42, Rear 18' 18' Building Height 64.5' 64.5' Bldg. Square Footage % 402,861 402,861 Open Space Footage % (Lot area minus bldg&paved 40.6 40.6 arlang) n of Parking Spaces 761 761 Fill: volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW YES XX IF YES, date issued: December 13,2001 IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW YES XX IF YES: enter Book 6504 Page 239 and/or Document rr B. Does the site contain a brook, body of water or wetlands? NO XX DONT KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained Date Issued: C. Do any signs exist on the property? YES XX NO IF YES, describe size, type and location: Various Locations on Site D. Are there any proposed changes to or additions of signs intended for the property ?YES No —XX IF YES, describe size, type and location: Version1.7 Commercial Building Permit May 15, 2000 SECTION 4 CONSTRUGTIONSERVICE FO.k FtOJECTS LESS THAN 35, 00 CUBIC FEET OF;ENCLOSED SPACIr `�` s, -� x _ E terior Alterations Y Existing Wall Signs Existing Ground Signs Additions ❑ I Roofing ❑ ❑ ❑ Exterior Alterations Demolition❑ New Signs [ ] Change of Use [ ) Other [ J ❑ Accessory Building [ Repairs [ ] BRIEF DESCRIPiIOt3:A 011111 ��j� �� 2,2279 ePC 7� tie).--fi'cfEW( SECTION 5 -USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly 1❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A NX tA-4 ❑ A-5 ❑ 1B ❑ B Business 10 2A ❑ E Educational ❑ 2B ❑ F Factory ❑ F-1 ❑ F-2 ❑ 2C I ❑ H Hiqh Hazard ❑ 3A ❑ I Insftwtional ❑ I-1 ❑ I-2 I-3 ❑ 33 ❑ N1 Mercantile I❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ S 1 ❑ 5-2 Cl 55 ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: ;COM aLETE TffISSECTION IFDQSTING BUILDING UNDERGOING ftcNOVATIONS,f�ODITIONS,�,INDjOR CHANGE IN USE Existing Use Group: 1-2 Proposed Use Group: 1-2 Existnc Hazard index 780 CM?,34): 4 Proposed Hazard Index 780 CMR 34): 4 SECTION 6 BUILDING EI .,HGH3 AN - � - '-OFRC�iJS&ONI� BUILDING AREA E)GS TING PP.OPOSED NEW CONSTRUC ION r"ioor A,-e2 per Focr (s'� 2rC C T L• ; •_ ;1���'� +�'.,�� ^..-� _.-1 f-�it � 2 3 `� ?^ j i Total Proposed Nev;Construcucr. (sr - - Total Heic:-t f Versionl.7 Co=ercial Building Permit May 15, 2000 City of Northampton ' ` Building Department 212 Main Street it Room 100 e Northampton, MA 01060 ,� a _ phone 413-587-1240 Fax 413-587-1272 _ s APPLICATION TO CONSTRUCT, REPAIR, RENOVATE,CHANGE THE USE OR Y BUILDING OTHER THAN A ONE OR TWO FAMILY G _ _ - _ JUL 2 9 2004 SECTIONI-SITE=INFORMATION 1.1 Property Address: 4"�"a�- . x Cooley Dickinson Hospital Map nrr _ ._.-�,17 yet ay D istrict~ 30 Locust St. �. ,t -tea-a,�. r° ?• J r�'� 7-W��^r �„'i... '��•-�-.s�_.rit-r•-�"�� �-`�: 'gf4gtSt`flistnCt- - SECTION 2-=PROPERTY-OWN ERS HIP JAUTHORIZED.AGENT - 2.1 Owner of Record: Cooley Dickinson Hospital, 30 Locust St. Name (Print) Curr,ent Mailing Address: 413-582-2313 Signature Telephone 2.2 Authorized Agent: Raymond R. Ho e Construction Inc. 187 East St. South Hadley, MA 01075 Name(Paint) Current Mailing Address: 413-532-9243 S;.gna' re Telephone SECTION 3-'ESTIMATED CONSTRUCTION COSTS Item Estimated Cos (Dolla,�) to be Official Use Only completed by permit a:)olicant 1. Building 2, (a)_Buiiding Permit Fee j 2. Electrical -� © Z s o u {b)Estimated:Total Cost of Construction from:"6} 3. Plumbing I 2p. e,;, ?6LCII it �ermitfee_ 4. Mechanical (HVAC) 5. Fire Protecton Zoo Total = (1 + 2 - 3 + 4 + 5) o Check Number _ Q _This Section For Official Use Only Euifding Permit Number: -D � " �Z Date Issued: Signature: Building Commissiori&/Insp-e--tor of Buildings Oat= 30 LOCUST ST BP-2005-0123 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block:23B-046 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Buildinq DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: BUILDING PERMIT Permit# BP-2005-0123 Project# 35-2005-0130 Est. Cost:$26520.00 Fee: $230.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: Raymond R. Houle Construction Inc 066227 Lot Size(sq.ft.): 667077.84 Owner: COOLEY DICKINSON HOSPITAL INC Applicant: Raymond R. Houle Construction Inc AT. 30 LOCUS T ST Applicant Address: Phone: Insurance: 187 East St (413) 532-9243 Workers Comnpensation SOUTH HADLEYMA01075 ISSUED ON.7130104 0:00:00 TO PERFORM THE FOLLOWING WORK:MC CALLUM 2ND FLOOR OFFICE 222A POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: fj� ,/�/tv House# Foundation: Driveway Final: Final: Final: Rough Frame:zr Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: F u;&i:o k $r •a 6- 4 q—&fw THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION-OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy sienatare• FeeType: Receipt No: Date Paid: Check No: Amount: Building 7/30/04 0:00:00 009401 $230.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Building Commissioner-Anthony Patillo