Dewey RSHPE Site Report 2012-06-07! RYAN S. HELLWIG, PE ! STRUCTURAL ENGINEER ! June 7, 2012 Laura Fitch, AIA, LEED AP Kraus-Fitch Architects, Inc. 110 Pulpit Hill Rd. Amherst, MA 01002 lfitch@krausfitch.com Re:Renovations and Repairs Dewey House Smith College The following is a summary report of my site visit and coordination meeting this morning. Demo in the older attic was nearly complete, and reinforcement of the older roof was starting: 1. LVL’s under existing purlins will be dropped down to sit on top of the truss bottom chord. A cripple wall will be built from the LVL up to the purlin. The existing timber beam and cripple studs in the northern bay will be removed, and hangers added onto those existing rafters; 2. Existing brick nogging will have to be removed in the gable end wall of line 3 so that the LVL can bear on the existing timber. The existing studs under the new LVL must be checked for bearing tightness under the timber. 3. Short pieces of dimension lumber will be placed under the ridge board, attached to the rafters, and bearing on the new LVL; 4. The gable end window in line 3 in the attic is partly under the ridge, not to the side as shown in the Elevation 1/A2.1. A new header will be required. New jack studs could be placed in the sash weight pockets. Header size is pending. Is design coordination required for placement of the new louver? 5. A new post will be required at the end of the new ridge LVL on line 6. Post size is pending. 6. There are no existing posts under the existing roof trusses. The 6x4xd steel angles cannot be installed as shown on 1/S5. A custom top-mount saddle hanger will be required. Hanger design is pending. Field measuring by the steel fabricator will be required. Respectfully, Ryan S. Hellwig, PE Massachusetts Professional Engineer #37300 - STRUCTURAL ! 28 ALDRICH STREET ! NORTHAMPTON, MA 01060 ! ! VOICE 413-584-HLWG (4594) ! FAX 413-584-HLWFax (4593) !