120503 Pre-Construction Meeting Minutes-7 110 Pulpit Hill Road, Amherst MA 01002 413-549-5799 Fax: 413-549-7918 www.krausfitch.com KRAUS-FITCH ARCHITECTS, INC. Home – Community – Planet May 03, 2012 Dewey House - Smith College Minutes of Meeting # 7 – May 03, 2012 Present: Charlie Conant (Smith Facilities), Roger Cooney, Mar Ledwell, Ann Ledwell, Jim Small, Tom Lucia (Wright Builders), Laura Fitch and Ian Gasco-Wiggin (Kraus-Fitch Architects), Dino D’Angelo, (L&S), Ryan Hellwig (Structural)-later New Business: Item Description / Discussion 1.4a Schedule: • Tom pointed out that this is a weather sensitive project – trick is when to pull trigger on roof. • CC: some room to breathe on exterior painting (not residential dorm) • Building empty on Wed 23, starting demo • Exterior mobilization on 29th 1.4 Permitting: • Requirements for permit: o Drawings – TEAM IN PROGRESS Permit set: 24x36 stamped and scanned. Tom requested that these be done ASAP. (Later: in progress) Electronic for Blg. Inspector (wet stamped scans) 11x17 set for Fire Department, Specs too. Half size set for Ryan requested. o Fire protection narrative- Dino, done and provided to KFA o Code summary and chapter 13 energy – KFA to complete by Tuesday (more extensive version). o Ch. 17 structural tests & inspections- Ryan o AAB report including waivers- KFA (June 18th hearing) o Affidavits – from arch and various disciplines – TEAM • Building Inspector Items o Later: Laura to review possible changes in toilet room layouts with Lou. o Water fountain at third floor: not response by Lou, presumed okay 1.5 Lift • nothing new 1.6 Windows • Measuring Friday 1.7 MEP items • Quick turnaround of submittals will be required. 1.7a Slate • Samples delivered. Charlie to take to his roofers for review. • Temporary protection of Roofing: roofer owns – (Roger clarified). • Jim: “Who protects porch copper roof?” Tom: Depends who goes first.” 1.7b Long lead items - Early Bids – Next round of buy outs • Hardware 1.8 What is needed from design team? • Site drawings: Tom creating “do not disturb” signs for site. Tom will get sketch to LF for revising the site plan. • Structural : Drawings reissued. 1.9 Specification clarifications • Signage: Charlie to provide info when required. 1.11 Early Work: • First subcontractor mtg. scheduled, w/ each providing schedules. • IT data to Clark to be flagged. Dino to confirm. (LF not sure if this was done). • Can steam be shut off early? Dino says Dewey can be isolated if valve holds. 3.2 Structural: • Stair ceiling: by Allowance 4.1 Interiors / Colors /Decorative Light Fixtures: • Lorin, Charlie, Laura and Ian met with Jeff and Vicky: • Furnishings: Okay to remove couches from conference room and tables from Study. New chairs for conference room (faculty mtg. space (another building) has very comfortable chairs) • Decorative lights-Approved. • Shelving in Study: Lorin will provide DWG to price • Colors and Finishes discussed and approved/modified. Lorin will follow-up • Office 215 shelving: LF to issue new sketch (done). • Consider adding light tube into hall? • Bulletin Board locations need more review. Remove from front hall, add to right of secretary. 6.1 As-builts: Tom requested AutoCAD files for as-builts. NEW BUSINESS: 7.1 GMP Pricing • Bottom line ($2.3 million) is in line! • $100K contingency • Some allowances (listed at top), including plaster above and beyond what is spelled out in drawings • Includes lift, windows, and roof (already ordered) • Roger will conduct one more round with low bidders to review scope and make sure nothing is missing. • Some subcontractors were too busy, vetted for schedule and manpower, early bird items, etc. • Hardware: building specialties as they had most complete, single package • MEP o Dino: good MEP contractors and pricing. o Fire Alarm: need to clarify selection of system o Moran: who did they carry for controls? o IT: nor head end equipment, nor final connection o Balancing: by College 7.2 GMP Options: • yes on full basement insulation • no, on insulation between floors • Wall paper: CC ask Lorin • Brick floor removal and new slab : will get price Meetings going forward: • LF: What is agenda for Pre Const. Mtg.? • Roger: Next two mtgs. important for coordination and subcontracts. • Ryan at meetings only as requested (probably once demo starts) • Dino at all meetings. • Walk site before mtgs. once construction starts (at 9:00). Then meet at facilities at 10:00. • Roger– Passing baton • Mark Ledwell will be at some meetings and at site often. Sketches and Re-issues • Laura will re-issue door schedule, changed by Addendum 1 • Access for LVLs @ truss bottoms, front and back wings discussed. LF will issue sketches • Ship ladder/stair demo: LF will include in attic demo sketch. Shop drawings submittals • Ann reviewed flow chart, Charlie requested to be copied at same time as architect. • Will be primarily electronic Next Meeting: Thursday May 10, 10:00 am. The meeting was adjourned. The above is the understanding of Laura Fitch. Please submit any corrections to these minutes in writing to the architects. Respectfully Submitted: Laura E. Fitch, Project Architect Kraus-Fitch Architects Cc (PDF by email): Charlie Conant (Smith Facilities), Roger Cooney, Ann Ledwell, Jim Small, Tom Lucia, Mark Ledwell (Wright Builders), Dino D’Angelo and team (Lindgren & Sharples), Laura Fitch and Ian Gasco-Wiggin (Kraus-Fitch Architects), Ryan Hellwig (structural), Lorin Starr (interiors), Louis Hasbrouck (Northampton Building Commissioner)