120503 Pre-Construction Meeting Minutes-7-o Balancing: by College
7.2 GMP Options:
• yes on full basement insulation
• no, on insulation between floors
• Wall paper: CC ask Lorin
• Brick floor removal and new slab : will get price
Meetings going forward:
• LF: What is agenda for Pre Const. Mtg.?
• Roger: Next two mtgs. important for coordination and subcontracts.
• Ryan at meetings only as requested (probably once demo starts)
• Dino at all meetings.
• Walk site before mtgs. once construction starts (at 9:00). Then meet at facilities at 10:00.
• Roger– Passing baton
• Mark Ledwell will be at some meetings and at site often.
Sketches and Re-issues
• Laura will re-issue door schedule, changed by Addendum 1
• Access for LVLs @ truss bottoms, front and back wings discussed. LF will issue sketches
• Ship ladder/stair demo: LF will include in attic demo sketch.
Shop drawings submittals
• Ann reviewed flow chart, Charlie requested to be copied at same time as architect.
• Will be primarily electronic
Next Meeting: Thursday April 26th, 10:00 am.
The meeting was adjourned. The above is the understanding of Laura Fitch. Please submit any
corrections to these minutes in writing to the architects.
Respectfully Submitted:
Laura E. Fitch, Project Architect
Kraus-Fitch Architects
Cc (PDF by email):
Charlie Conant (Smith Facilities), Roger Cooney, Ann Ledwell, Jim Small, Tom Lucia, Mark Ledwell
(Wright Builders), Dino D’Angelo and team (Lindgren & Sharples), Laura Fitch and Ian Gasco-Wiggin
(Kraus-Fitch Architects), Ryan Hellwig (structural), Lorin Starr (interiors), Louis Hasbrouck
(Northampton Building Commissioner)