Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
06-051 548 haydenville rd. con com
Form 2 Commonwealth of Massachusetts OEGE Flee t'b. C (Ta be pmviEeO by pE0E1 gay' Taw. Northampton ApPl t Mass. Electric Determination of Applicability Massachusetts Wetlands Protection Act, G.L. c. 131, §40 Northampton Conservation Commission Issuing Authority To Mass. Electric Company Peter and Steonanre FlinKer lowners of abutting (Name of person making request) Name of property owner) Property) 548 Haydenville Rd. 502 Haydenville Rd., Northampton, MA 01060 Address Northampton MA 01060 Address This determination is issued and delivered as follows:. C by hand delivery to person making request on (date) 9X by Certified mail, return receipt requested on jo 28, 1980 (date) Pursuant to the authority of G.L c. 131, 540, the Northampton Conservation Commi has considered your request for a Cetermination of Applicability and its supporting documentation, and has made the following determination (check whichever is applicable): This Determination m positive: 1 . C The area described below, which includes all/par of the area described in your request, is an Area Subject to Protection Under the Act. Therefore, any removing, filling, dredging or altering of that area requires the filing of a Notice of Intent. 2. G The work described below, which includes allipar of the work described in your request, is within an Area Subject to Protection Under the Act and will remove, fill, dredge or alter that area. There- fore, said work requires the filing of a Notice of Intent. 21 Effective 11/1/87 3_ Q The work described below, which includes all/part of the work described in your request, is within the Suffer Zone as defined in the regulations. and wi0 after an Area Subject to Protection Under the Act: Therefore, said work requires the filing of a Notice of Intent. This Oeranninstign is negative: 1. Cl - The area described in your request is not an Area Subject to Protection Under me Act 2. C The work described in your request is within art Prey Subject to Protection Under the A= but will not remove, fill, dredge, or after that area Therefore, said wom does not require the filing at a Notice of Intent. ,T..ayp The work described in your request is within the Suffer Zone, as defined in the regulations. butwill not ater an Area Subject to Protection Under the Act.. Therefore.. said work does not require the filing of a Notice of Intent. 4. C The area descr ibed in your request is Subject to Protection Under the Act, but since the work described therein meets the requiremertts for the following exemption,as specifies in the Act and the regulations, no Notice of Intent is required: ' Issued by rvorthamoton Conservation Commission_ This Oetennination must be signed by a major re theCbnserva6on Commission. Off ttli —day of ^ i r a 19 .�L_. Kerwin to be the me personally appeared to me known on described in and who executed, the foregoing Mint ant, and acknowledged KA hts she executed the as his/her"ifeact ddeed. NOTARY PU'LIC ° m cowa15510N exrtxZ= Public My com meadifffl s 14,19M T}Ip celBmlla2pon M. 9'l not rell me amlY tf,,mf ,,Mo twin ae atn r,io llr lecenti. S Meor 1C `ioio1 Na60naee. by.{ewe Crrbaulaam�9. TNe Oelerm,reuon slut, beveYO farevee Yepefarm Ire Cate at issuance. The applicYh. me owner. airy aersM abgnave0 by eta Oetermmaecn. arty owneraf IenO abman9 ire IarM u[pn whidf meuaaosea. warku p bit [pre. or anY ten revaena of me aNar fawn in wrtcn swh IarM u lacatab, are Hereby rpbire0 of mern9nt p rebueet me OeCamnent o Fmrcan o dw to Emm�eenn9to .Mm aSuaene t, eMM, fo r u of d o fM%aN.bmw®pire MrOfM rtalbe by cerelieb mat, or nano aelrvery to the Oeoarenent warp Ian Days hop Ire CaR of iseiwpe of mu gefermina0an. A c ooyaf Ina reaueat Shay ar we same ems be senrbyc,r,fe, mitt or nano CeWerY pthe Consmvaeen Convnoj rtarm me eoolicenL 2'ZA 310CtAR: CEPART�,EENTOEENVIRONMENTALQUAL ,YENC:NEERLNG i 10.99: Edrms ,.tom [�17.� �1 I," {It`N9 /`SJS JUN 61988 )'tJ Forms (1`.. PLAN" DEGE FeNe.� 0; ;�_, PniU Fcv 1 Q _ Rs mvra.aee ev pECEI . Northampton OWT .n Commonwealth of Mamacowett3 eooYrnr Massachusetts Ele ctric Company ", Request for a Determination of Applicability Massachusetts Wetlands Protection Aet G.L. e. 131, §40 Northampton 1. 4 the undenignadsereby request Nat Ne Conservation Commission make a detemninadon as to whemr rife area described below, or work to be performed an said area also described below, is subject to rife jurisdiction of rife Wetlands Frotecdon Ac: tiL a. 151, 140. 2 The area is described as follows. (Use maps or plans, it necessary, to provide a descdptian and Ne location of rife area subject to Nis request) See attached sheet and maps. 3. The work in said area isde3cdbed below (Use additional pacer, if necessary. to describe the proposed work.) See attached sheet and maps. L1 10 /16 /87 (Ettecte 1111/87) 310 CMR - "DA 10.99: continued 4. The ownens) of the area, it not me person making "re tallest, has been given written notification at mis I rawest on June 6. 1988 (date) The nominal and addreas(es) of the cwnegs): Peter A. and Siephanie J.K. Flinker 502 Haydenville Road Northampton, mA 01060 5. [have fled a complete Illy at mist reluest with the ao5ondrate regional office of the Massachusetts Department of Environmental Quality Engineering an J u n e 6 , 1988 (dale) Metric Baston /Northeast Southeast 38 Commerce Way Lakeville Hospital WIOUM. MA 01801 Lakeville, MA 02366 Central Western 158 Grave Street State Hcuse West 4th Floor Worcester, MA 01605 436 Dwight Street Springfield. MA 03103 G. I understand that ncti0catlan of this reque rtwill be placed in a lacaf newspaper at my expense in accor- dance with Sedan 10.05(3) (b) 1 of the reguladcna by the Conservation Commission and that I will be billed accordingly. Signature �' Name John F. McNiff III Address 548 Hayaenville Road 413 -584 -8700 Northampton, MA 01060 Tel 1.2 10/Sfi/87 (Effective 11/1/87) 3 10 CMR - '180.30 SUPPLEMENT TO A "REQUEST FOR A DETERMINATION OF APPLICABILITY" FILED IN BEHALF OF MASSACHUSETTS ELECTRIC COMPANY Question U2. The area for which this determination is requested is located partially on Massachusetts Electric Company property on Haydenville Road in Leeds, (Assessors Parcel No. 6 -51 and a portion of 6 -6) and is shown on the attached locus map. The area in question is a small wet depression on the portion of Parcel No. 6 -6. This area receives the stormwater runoff from a parking lot constructed several years ago. The area is isolated from a larger apparently isolated wetland on the abutting property and is shown on the attached topographic worksheet. No work is proposed within 100 feet of the larger wetland, nor is there any intention to alter its watershed. At a recent site visit by the City's Planning and Conservation officers, it was observed that the area is not large enough to be considered isolated land sub- ject to flooding. It does function as a stormwater retention basin for the parking lot's drainage, and any change in the drainage characteristics of the site should be accomplished through an acceptable drainage design prepared by the applicant's engineer. The area is not a certified vernal pool, nor does it appear to possess a favorable habitat to be one due to the quality of runoff from it's principal watershed, (the parking lot), and it's small size (1200 S.F. + ). The water level in the depression may represent the regional groundwater level, and the area may be a wetland, but it does not border on an applicable resource area and therefore would not be subject to the Wetlands Protection Act. The site does not appear in the 1988 edition of the "Atlas of Estimated Habitat of State - Listed Rare Wetlands Wildlife" issued by the National Heritage and Endangered Species Program. Question U3 The applicant is beginning preliminary planning for an addition to the existing building, a new storage area to be located westerly of present facility, and an access road to reach the proposed storage area. These projects are in various design stages and will take place well outside of the 100' buffer zone which may exist around the area in question. Any changes to the hydrology of the site will be addressed by an overall drainage study done in conjunction with the access road design. At this time, the applicant wishes to spread fill and grade the area near this retention basin to enable him to temporarily relocate his utility pole storage area and to gain access for soil tests which are required for the access road design. The applicant, therefore, is respectfully requesting this determination to confirm his engineer's opinion that this area is not within the Conservation Commission's jurisdiction under the Wetlands Protection Act. EM7 -21 ALMER HUNTLEY, JR., & ASSOCIATES, INC. SURVEYORS- ENGINEERS - LANDSCAPE .ARCHITECTS Bj r 6 -61 6 -6 ry 6 -I SI A2.Fa !u QuE�T�OM � 6 s 3 ti 32 6 — Ctry o /oa_rNF�rPTo�� Tsuc MpP- �ED.JGE APReox SrAc E l =310 Po2TloN ,FF IAc --EL 4 f�Pl'i�U c .SCALE I-= 9o' *' NORTHAMPTON ANNING BOARD PLR APPROVAL /NO a BOIV /S/ON �� p$ 4z - 0 0'P' Nr ' CON TROL NOTREOU/REO IOB Y Dale• Norm r i lic / , 'M ' m w AREA " ELECTR IC L ' COL ORES Y . .' :, For Regis /ry Use COMRANY... C /FA BELL/ .. /. / CERTIFY THAT THIS PLAN HAS ET AL/ �. ��. { -BEEN PREPARED IN CONFORMITY WITH THE RULES AND REGULATIONS - _ Z, OF THE REGISTERS OF DEEDS SNED - OF. THE COMMONWEALTH OF BARN MASSACHUSETTS r Y , NAME• J �+ OATEL irP I HOUSE b a ���iii MNB /0398' /40.00' ' B SI /'S /D "u� SB(FND.) - NEW ENGLAND POWER SERVICE COMPANY - ROUTE 9 /s/o/s Hia�•oT/ __ PLAN SHOW /N6 • LANO c /N MH8 NORT/JdMPTON MASSACRUSETTS TO BE CONE Y TO A7d,$SACNUSE7TS ELE0R /CCOM ➢ANY NORTyAMPTON, MASSACHUSETTS DO(,(JR�S C/FgREGL/ ET AL/ NAMPSN /flE E OUNTr urrf na >A ,9A> I n n a n Po2TloN ,FF IAc --EL 4 f�Pl'i�U c .SCALE I-= 9o' *' ALMER HUNTLEY, JR. & ASSOCIATES, INC. SURVEYORS- ENGINEP.RS- LANDSCAPRARCHITECTS P.O. B- 568 / 30 IN Ul S'I'R V,L URII I I ASC / NORTHAMPTON, MASS. 01661 4[315S4 7446 City of Northampton Conservation Commission City Hall Northampton, MA 01060 June 27, 1988 ALMER HUNTLRY 1R.. PE., RLS DOUGLAS W. THO,MPSON, RLS WILLIAM R. CARRI'I'A, LA JOHN G. RAYMOND, PE 11250- 074 -30 RE: Determination of Applicability for Massachusetts Electric Co. Dear Members of the Board: As discussed at our June 13 public hearing, we are enclosing the information you requested. The following items are attached or shown on the enclosed plans: 1. The water surface area of the pond on the abutting Flinker property is 5,800 s,f. 2. Approximate location of the temporary pole storage area. 3. Approximate location of test pits. 4. The preliminary alignment, grading and drainage of the access road. 5. The location and grading of the proposed retention basin. 6. Location of proposed siltation barrier. 7. The location of a proposed storage shed. 8. Soil information and Pere test results. 9• Flood map — F.I.R.M. Section 10.04 of the Wetlands Protection Act Regulations contains the following definition of a pond: Pond (inland) means any open body of fresh water, either naturally occurring or man —made by impoundment, with a surface area observed or recorded within the last ten (10) years of at least 10,000 square feet, and which is never without standing water due to natural causes, except during periods of extended drought. For purposes of this definition, extended drought shall mean any period of four (4) or more months during which the average rainfall for each month is 50 percent or less of the ten (10) year average for that same month. G RE: Determination of Applicability for Massachusetts Electric Co. Dear Members of the Board: As discussed at our June 13 public hearing, we are enclosing the information you requested. The following items are attached or shown on the enclosed plans: 1. The water surface area of the pond on the abutting Flinker property is 5,800 s,f. 2. Approximate location of the temporary pole storage area. 3. Approximate location of test pits. 4. The preliminary alignment, grading and drainage of the access road. 5. The location and grading of the proposed retention basin. 6. Location of proposed siltation barrier. 7. The location of a proposed storage shed. 8. Soil information and Pere test results. 9• Flood map — F.I.R.M. Section 10.04 of the Wetlands Protection Act Regulations contains the following definition of a pond: Pond (inland) means any open body of fresh water, either naturally occurring or man —made by impoundment, with a surface area observed or recorded within the last ten (10) years of at least 10,000 square feet, and which is never without standing water due to natural causes, except during periods of extended drought. For purposes of this definition, extended drought shall mean any period of four (4) or more months during which the average rainfall for each month is 50 percent or less of the ten (10) year average for that same month. Basins or lagoons which are part of wastewater treatment plants shall not be considered ponds, nor shall swimming pools or other impervious man -made retention basins. The water level of the pond on the abutter's property (379.9 feet) is low due to the time of year. Our estimate of its maximum lateral extent in the last ten years is based on Mr. McNiff's recollections, together with the field evidence of the higher water level. As far as we can determine, there is no historical data of this pond's water elevation. This area could also be isolated land subject to flooding, but in any case we do not propose to increase the flood level. We estimate that during times of high groundwater this pond will be raised about two feet in height to an elevation of 382 feet. This will increase the lateral extent of the pond's edge by as much as 25 feet, but the resulting area is only 9,500 s.f. Therefore we are asking the Commission to confirm our belief that this area is not a pond as defined by the Act. If the Commission determines that this pond is a resource area and that a buffer zone does exist, we have shown all the proposed work in that zone. Although this work may be in the buffer zone, the design and construction methods used will ensure that there is no adverse effect to this wetland. If this area is determined to be a buffer zone, the Commission can still grant a negative determination for this work in accordance with Section 10.00, V. A. of 310 CMR, which states: "Of course, anyone contemplating a project within 100 feet of a bor- dering vegetated wetland can forego this preliminary determination by simply filing a Notice of Intent, an option that may be appropri- ate in those cases where it is obvious that the proposed work will indeed have an impact on the wetland. Equally, where the applicant proposes to take appropriate engineering measures to prevent impact on a neighboring wetland (and fully documents such measures in the Request for Determination of Applicability), there is no legitimate basis for requiring a Notice of Intent." The original small retention basin will remain as an outlet for the existing parking lot drain. The applicant proposes to install a siltation barrier along the work limits. All grading and slopes are proposed to be revegetated and stabilized before the siltation barrier can be removed. Without management, the runoff from the hill which presently empties into this pond could be increased by the construction of the access road. For this reason, the applicant proposes to construct a new retention basin as shown. This basin will handle all of the additional runoff generated by the new road- way. Overland flow to the pond would also be reduced, but groundwater levels would be unchanged. We hope this additional information will be helpful to the Commission when making your determination. If there are any questions that Massachusetts Electric or I can answer, please contact us at any time. Very truly yours, /AL�MMEEERRHUNTLEY, SR. 6 ASSOCIATES, INC. S teven G. Mason Project Engineer SGM: kmc Enclosures Oat. for MASSACHUSETTS ELECTRIC CO. Page 1 Preo.red by ALMER HUNTLEY Sr & ASSOCIATES INC.: ENGINEERING 06 -27 -BB H d,rAD rev 3/IS/R7 �-) 19PG Bo.liad Microcongu +a^ Svstens SUBCRTCHMENT I HILLSIDE AND EXISTING STORAGE YARD PERCENT PERCENT ON � RRER= '3. N1_ o � 92 60 AREA= 6.60 ACRES SCS TR -20 METHOD 6 98 LENGTH= 1000 FEET TYPE III 24 -HOUR STORM 0 0 SLOPE= 13.0 % RAINFALL= 4.5 INCHES 0 0 Tc= 14 MINUTES PEAK= 7.6 CPS a 12.19 HRS 100 E3 VOLUME= VOLUME= .68 AF Su9CRTCWTENT i PUNCEE Ll r1 Ln r _ m m to r` m nI nI TIME (hQUr_) r: 1u SUBCRTCHMENT HILLSIDE PND EXLSTDIC STOPRCE YRPD WITH PROPOSED ACCESS ROAD PERCENT ON =0 � RRER= '3. N1_ o � 60 AREA= 6.60 5.17 BOB TR -20 METHOD 12 5.5 L 1 Tr.= 14 C1IP1 FEET 5 EI STORM 0 ' 4.5 SCS T P -23 ! Ti 4.C]r T`.r'PE TIT 24 -HFIUP STDFM Tc= 13 I PRINFHLL= 4.5 IN O J oIJ� GS VOLUME= .98 AF Cis 12. 1H HIRE 1.0L VOLUME= -8= PF Ll r1 Ln r _ m m to r` m nI nI TIME (hQUr_) r: 1u SUBCRTCHMENT 10 HILLSIDE WITH PROPOSED ACCESS ROAD PERCENT ON Be 60 AREA= 6.60 ACRES BOB TR -20 METHOD 12 99 LENGTH= 1000 FEET TYPE III 2 _4 —HOUR STORM 0 0 SLOPE= 13.0 % RAINFALL- 4.5 INCHES 0 0 Tc= 13 MINUTES PEAK 6.5 CPS 0 12.16 HRS 100 GS VOLUME= .98 AF Data far MASSACHUSETTS ELECTRIC CO. Paoe 2 Prepared by ALMER HUNTLEY dF S ASSOCIATES IN'. : EPIGIPIEERING 06 -27 -53 H C rev. 3/25/37 ( '.935 Aopliad nicra m- router S' =_te ^s above fi..d eievatlo, DETENTION POND 2 PROPOSED RETENTION BASIN STARTING ELEV= 384.0 FT FLOOO ELEV= 363.0 FT eLEVATIDPI STn99GE ELE�U /HERD DISCHARGE STOP -IND NETHCD (FT (PtF) (FT) (CFS) PEAK ELEV "c ATION= ._ FT 334.�a 0.00 0.0 0.0 PEEN. STORAGE _ 70 nF 335.0 .__ 0.0 0.0 pin = 9.5 TFS 0 12.16 HP5 0.0 0.00 0.0 0.0 pout= .- C _ Fs m 12.44 PPS 0.0 0.00 0.0 0.0 ATTEN= 2a % L9S = 999 SEC 0.0 0.00 0.0 0.0 IN /DUT= .S9 .,i BF INVERT (FT) OUTLET DEVT CES 38 1 .8 10' BROAD - CRESTEO UEIR 0 =C L H "1.5 C =2.64. 2.69. 2.54. 0, 0, 0. O. 0 TOTBL DIS._uARGE v=_ 2 RiATION FEET 0.0 4 S g Z 3 A p 334.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.a 1.0 335.0 I 0.0 0.0 0.1 0.0 1.0 0.0 0.0 0.0 0.0 0.0 366.0 : 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 327.0 I a.0 0.1 70 0.0 0.0 0.0 0.0 0.1 0.0 ._ 399.1 z4 CALCULATION W9RNiN6s SUBCATCHMENT 1 WARNING! Tc i 3 It may reduce deficit;., and peal, SUBCATCHMENT 10 WARNING: Tc 3 tit nay Faduce de P: ,;lion a,d peat DETENTION POND 2 WARNING: PaaSed app,. :,. 1.2 ft above fi..d eievatlo, - -- and eF calculations - -- Oat.=_ f -r MASSACHUSETTS ELECTRIC CO. SUBCATCHMENT I Prepared by ALMER HUNTLEY Jr & ASSOCIATES iNC.: ENG INEEERIN6 Pa 3 Ba HVdroDAD r� ' / ^E /87 ice? !936 Aoclied I9icracoroout el G =t, 06 - -7 -69 SUBCATCHMENT I tc 9999 60 AREA= 8.80 SUBCATCHMENT I HILLSIDE AND EXISTING STORAGE YARD PERCENT CN 9, 60 AREA= 8.80 ACRES SCB TR -20 METHOD B 98 LENGTH= 1000 FEET TYPE III C4 -HOUR STORM 0 0 SLOPE= 73.0 % RAINFALL= 6.6 INCHES 0 0 Tc= 14 MINUTES PEAK= 16.9 C c e : °_.16 N.RS 100 63 VOLUME= 2.00 AF VOLUME= 1.96 OF SUBCATCHMENT 10 HILLSIDE WITH PROPOSED ACCESS ROAD PERCENT CN BS 60 AREA= 8.80 ACRES SC5 TR -P0 METHOD 12 98 LENGTH= 1000 FEET TYPE IIi 24 -HOUR STORs`I 0 0 SLOPE= 13.0 Y RAINFALL= 6.S INCHES 0 0 Tc= 13 MINUTES PEAK= I2.1 CFS © 72.13 HRS 00 EE VOLUME= 2.00 AF Data for MASSACHUSETTS ELECTRIC CO. Pape S Preoared by ALMER HUNTLEV Jr & ASSOCIATES INC.: ENGINEERING 06 -27 -6B HYdroCAD rev. 3/7S/S7 (C) ISSE A + DETENTION POND I to 9999 DETENTION POND Z STARTING ELEV= 364.0 FT FLOOD ELEV- 366.0 FT ELEVATION STORAGE (FT) fAF� 324.0 0.00 .2 362.0 ZB 0.0 0.00 .7 0.0 0.00 384.0 0.0 0.00 0.0 PROPOSED RETENTION BASIN ELEV /HEAD DISCHARGE (FT) CF51 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 STOR -IND METHOD PEAK ELEVATION = 399.? FT PEAK STORAGE = .36 AF Gin = 1S.1 CPS @ 12.13 HRS Gout= 20.4 CA; @ 12.23 HRS ATTEN= 0 R LAG = 359 SEC IN /GUT = 2 _.00 ! 1.73 AF INVERT (FT) OUTLET DEVICES 367.6 10' BROAD- CRESTED WEIR Q =C L H "1.5 C =2.64, 2.66. 2.64, 0, 0, 0. 0. 0 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .I .2 .4 ,5 .G .7 .6 .9 384.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 365.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 366.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 367.0 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 .B 366.0 2.4