Loading...
23A-039 (4) Here's the information on the windows: 1.2 WINDOW PERFORMANCE REQUIREMENTS A. Product Standard: Comply with AAMA/WDMA/CSA 101/I.S.2/A440 for definitions and minimum standards of performance, materials, components, accessories, and fabrication unless more stringent requirements are indicated. 1. Window Certification: WDMA certified with label attached to each window. B. Performance Class and Grade: AAMA/WDMA/CSA 101/I.S.2/A440 as follows: 1. Minimum Performance Class: R. 2. Minimum Performance Grade: 40. C. Thermal Transmittance: NFRC 100 maximum whole-window U-factor of 0.27 Btu/sq. ft. x h x deg F for double hung windows and .22 Btu/sq. ft. x h x deg F for projected windows. D. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window SHGC of 0.28 for double hung windows and 0.31 for projected windows. Windows to be provided are National Vinyl LLC, Northwind III. From: Kerry Dietz <kerryd @dietzarch.com> Date: Fri, 1 Nov 2013 18:39:39 +0000 To: Northampton Housing <jhite @hamphousing.orq> Conversation: window and door projects Subject: RE: window and door projects Here's the spec information on the doors proposed: A. Insulated Heavy-Duty Doors and Frames: SDI A250.8, Level 2. At locations indicated in the Door and Frame Schedule. 1. Basis of Design: Imperial (IU) Urethane Core Door with Series SQT/SRT Thermal Break Frames, Ceco Door Products. 2. Physical Performance: Level B according to SDI A250.4. 3. Doors: a. Type: As indicated in the Door and Frame Schedule. b. Thickness: 1-3/4 inches c. Face: Metallic-coated steel sheet, minimum thickness of 0.042 inch, with minimum A40 coating. d. Edge Construction: Model 2, Seamless. e. Core: Manufacturer's standard polyurethane core. f. Thermal performance: R-11. 4. Frames: a. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch, with minimum A40 coating. b. Construction: Knocked down. c. Thermal performance: Thermally broken frame. 5. Exposed Finish: Prime. City of Northampton •'' Massachusetts s . . r, t DEPARTMENT OF BUILDING INSPECTIONS '' l 212 Main Street • Municipal Building d ,b'' Northampton, MA 01060 1sNyp a•v: 3 h. INSPECTOR Louis Hasbrouck Fax: 413-587-1272 Chuck Miller Building Commissioner Phone:413-587-1240 Assistant Commissioner CONSTRUCTION CONTROL DOCUMENT (For professional Engineers/Architects responsible for Entire Project) Renovations to Tobin Manor October 16, 2013 Project Title: Date: 56 Maple Street 23A 039 GB Project Location: Map: Parcel:__ _Zone:_ __ Replacement of front door and vestibule door, interior finishes Scope of Project:------------- -------------------------- In accordance with the Eighth edition Massachusetts State Building Code, 780 CMR Section 107.6: Kerry L. Dietz 5264 I,__— _—____ Mass. Registration#___ _ —__, Being a registered professional Engineer/Architect hereby CERTIFIES that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [Xj ENTIRE PROJECT For the above named project and that to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and all applicable Laws for the proposed project. Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approved for the building permit and shall be responsible for the following as specified in Section 10.7.6.2.2: 1. Review of shop drawings, samples and other submittals of the contractor as required by the construction documents as submitted for the building permit, and approval for the conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed In a matter consistent with the construction documents. I shall submit periodically, in a form acceptable to the building official, a progress report together with pertinent comments. Upon completion of the work, I shall submit to the building official a final report as to the satisfactory completion and readiness of the project for occupancy. ���i D Mc .( L yfT Z H ' Signature and Seal of Registered Professional c-) No. 5264 Springfield, Z ----- ' MASS. �JV' 16 October 13 40/1 of M?�- Day of__--_— 20____ (seal) Versionl.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes 0 No 0 SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Jon Hite, Executive Director of the Northampton Housing Authority as Owner of the subject property Brian Henry of Henry General Contractors, Inc. hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner ate Brian Henry , as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury, Print Name Signature of Owner/Agent Date SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Brian Henry CS-084258 License Number 1464 State Street, Springfield,MA 01109 03/03/2015 Address Expiration Date (413) 301-5655 Sre � Telephone SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes 0 No Q Version1.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE) 9.1 Registered Architect: Dietz& Co. Architects, 17 Hampden St, Springfield, MA Not Applicable ❑ Name(Registrant): 5264 Dietz & Co. Architects, 17 Hampden St, Springfield, MA Registration Number Addr 08/31/2014 1"1`x'1 L; p1 ("1i (413) 733-6798 Expiration Date atur- Telephone 9.2 R-• ered Pro essional Engineer(s): Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature • Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor Henry General Contractors, Inca Not Applicable ❑ Company Name: Brian Henry Responsible In Charge of Construction 1464 State Street, Springfield,MA 01109 Address b- (413) 301-5655 Signature Telephone Versionl.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Existing Frontage Existing Setbacks Front Ex. Side L: R: L:Ex. R:Ex. Rear Ex. Building Height Ex. Bldg. Square Footage % Ex. Ex. Open Space Footage (Lot area minus bldg&paved Ex. Ex. parking) #of Parking Spaces Ex. (volume&Location) Existing A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DON'T KNOW 0 YES Q IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW 0 YES Q IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES Q IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained IQ Obtained Q , Date Issued: C. Do any signs exist on the property? YES 0 NO Q IF YES, describe size, type and location: Existing D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO 0 IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading, excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO 0 IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Version1.7 Commercial Building Permit May 15,2000 SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations MI Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑ Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other❑ Brief Description Replacement of front door and vestibule door. Replacement of finishes in vestibule. Of Proposed Work: SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A I 1:1 A-4 ❑ A-5 ❑ 1B ❑ B Business ❑ 2A ❑ E Educational ❑ 2B I ❑ F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑ H High Hazard ❑ 3A ❑ I Institutional ❑ I-1 ❑ 1-2 ❑ 1-3 ❑ 3B ❑ M Mercantile ❑ 4 ❑ R Residential p R-1 ❑ R-2 MI R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B [ 0 U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group: R-2 Proposed Use Group: R-2 Existing Hazard Index 780 CMR 34): 2 Proposed Hazard Index 780 CMR 34): 2 SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) 1St 1St 2nd 2nd 3rd 3rd 4th 4th Total Area(sf) Total Proposed New Construction(sf) Total Height(ft) Total Height ft 7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public p Private ❑ Zone Outside Flood Zone p Municipal p On site disposal system❑ Versionl.7 Commercial Building Permit May 15,2000 Department use only City of Northampt• �, _ n Status of Permit: Building Departm= -'■I� !'1 Orr u. -7' eway Permit 212 Main Stree r'i � - tai Availability Room 100 tt/ OCT 2 3 201 ater r 1 Availability Northampton, MA 410610______ wo p? ;: File#BP-2014-0529 APPLICANT/CONTACT PERSON HENRY GENERAL CONTRACTORS INC ADDRESS/PHONE 1464 STATE ST SPRINGFIELD (413)301-5655 PROPERTY LOCATION 56 MAPLE ST-TOBIN MANOR MAP 23A PARCEL 039 001 ZONE GB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Q'' do /�g Fee Paid j SF/ Typeof Construction: INSTALL REPLACEMENT FRONT&VESTIBULE DOOR&FINISHES New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 084258 _iQ/ 3 sets of Plans/Plot Plan .//�1�4_ THE FOLL G ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO TION PRESENTED: pproved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Pennrit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management A, '%on Delay /A2 /$ Signa re of Building •f icial Date Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 56 MAPLE ST-TOBIN MANOR BP-2014-0529 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 23A-039 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit# BP-2014-0529 Project# JS-2014-000908 Est. Cost: $16220.00 Fee: $97.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: HENRY GENERAL CONTRACTORS INC 084258 Lot Size(sq. ft.): 64904.40 Owner: NORTHAMPTON HOUSING AUTHORITY TOBIN MANOR Zoning: GB(100)/ Applicant: HENRY GENERAL CONTRACTORS INC AT: 56 MAPLE ST - TOBIN MANOR Applicant Address: Phone: Insurance: 1464 STATE ST (413) 301-5655 SPRINGFIELDMA01109 ISSUED ON:11/4/2013 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL REPLACEMENT FRONT & VESTIBULE DOOR & FINISHES POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 11/4/2013 0:00:00 $97.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner