23A-039 (4) Here's the information on the windows:
1.2 WINDOW PERFORMANCE REQUIREMENTS
A. Product Standard: Comply with AAMA/WDMA/CSA 101/I.S.2/A440 for
definitions and minimum standards of performance, materials, components,
accessories, and fabrication unless more stringent requirements are indicated.
1. Window Certification: WDMA certified with label attached to each window.
B. Performance Class and Grade: AAMA/WDMA/CSA 101/I.S.2/A440 as
follows:
1. Minimum Performance Class: R.
2. Minimum Performance Grade: 40.
C. Thermal Transmittance: NFRC 100 maximum whole-window U-factor of
0.27 Btu/sq. ft. x h x deg F for double hung windows and .22 Btu/sq. ft. x h x deg F
for projected windows.
D. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window
SHGC of 0.28 for double hung windows and 0.31 for projected windows.
Windows to be provided are National Vinyl LLC, Northwind III.
From: Kerry Dietz <kerryd @dietzarch.com>
Date: Fri, 1 Nov 2013 18:39:39 +0000
To: Northampton Housing <jhite @hamphousing.orq>
Conversation: window and door projects
Subject: RE: window and door projects
Here's the spec information on the doors proposed:
A. Insulated Heavy-Duty Doors and Frames: SDI A250.8, Level 2. At
locations indicated in the Door and Frame Schedule.
1. Basis of Design: Imperial (IU) Urethane Core Door with Series SQT/SRT
Thermal Break Frames, Ceco Door Products.
2. Physical Performance: Level B according to SDI A250.4.
3. Doors:
a. Type: As indicated in the Door and Frame Schedule.
b. Thickness: 1-3/4 inches
c. Face: Metallic-coated steel sheet, minimum thickness of 0.042 inch, with
minimum A40 coating.
d. Edge Construction: Model 2, Seamless.
e. Core: Manufacturer's standard polyurethane core.
f. Thermal performance: R-11.
4. Frames:
a. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch,
with minimum A40 coating.
b. Construction: Knocked down.
c. Thermal performance: Thermally broken frame.
5. Exposed Finish: Prime.
City of Northampton
•'' Massachusetts s . . r,
t
DEPARTMENT OF BUILDING INSPECTIONS
'' l 212 Main Street • Municipal Building d ,b''
Northampton, MA 01060 1sNyp a•v:
3 h.
INSPECTOR
Louis Hasbrouck Fax: 413-587-1272 Chuck Miller
Building Commissioner Phone:413-587-1240 Assistant Commissioner
CONSTRUCTION CONTROL DOCUMENT
(For professional Engineers/Architects responsible for Entire Project)
Renovations to Tobin Manor October 16, 2013
Project Title: Date:
56 Maple Street 23A 039 GB
Project Location: Map: Parcel:__ _Zone:_ __
Replacement of front door and vestibule door, interior finishes
Scope of Project:------------- --------------------------
In accordance with the Eighth edition Massachusetts State Building Code, 780 CMR Section 107.6:
Kerry L. Dietz 5264
I,__— _—____ Mass. Registration#___ _ —__,
Being a registered professional Engineer/Architect hereby CERTIFIES that I have prepared or directly supervised
the preparation of all design plans, computations and specifications concerning:
[Xj ENTIRE PROJECT
For the above named project and that to the best of my knowledge, such plans, computations and specifications
meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices
and all applicable Laws for the proposed project.
Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that
the above mentioned portions of the work proceed in accordance with the documents approved for the building
permit and shall be responsible for the following as specified in Section 10.7.6.2.2:
1. Review of shop drawings, samples and other submittals of the contractor as required by the
construction documents as submitted for the building permit, and approval for the conformance
to the design concept.
2. Review and approval of the quality control procedures for all code-required controlled materials.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine, in general, if the work is being performed
In a matter consistent with the construction documents.
I shall submit periodically, in a form acceptable to the building official, a progress report together with pertinent
comments. Upon completion of the work, I shall submit to the building official a final report as to the satisfactory
completion and readiness of the project for occupancy. ���i D Mc
.( L yfT
Z H '
Signature and Seal of Registered Professional c-)
No. 5264
Springfield, Z
----- ' MASS. �JV'
16 October 13 40/1 of M?�-
Day of__--_— 20____
(seal)
Versionl.7 Commercial Building Permit May 15,2000
SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11)
Independent Structural Engineering Structural Peer Review Required Yes 0 No 0
SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
Jon Hite, Executive Director of the Northampton Housing Authority
as Owner of the subject property
Brian Henry of Henry General Contractors, Inc.
hereby authorize to
act on my behalf, in all matters relative to work authorized by this building permit application.
Signature of Owner
ate
Brian Henry
, as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury,
Print Name
Signature of Owner/Agent Date
SECTION 12-CONSTRUCTION SERVICES
10.1 Licensed Construction Supervisor: Not Applicable ❑
Name of License Holder: Brian Henry CS-084258
License Number
1464 State Street, Springfield,MA 01109 03/03/2015
Address Expiration Date
(413) 301-5655
Sre � Telephone
SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes 0 No Q
Version1.7 Commercial Building Permit May 15,2000
SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO
CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE)
9.1 Registered Architect:
Dietz& Co. Architects, 17 Hampden St, Springfield, MA Not Applicable ❑
Name(Registrant):
5264
Dietz & Co. Architects, 17 Hampden St, Springfield, MA Registration Number
Addr 08/31/2014
1"1`x'1 L; p1 ("1i (413) 733-6798 Expiration Date
atur- Telephone
9.2 R-• ered Pro essional Engineer(s):
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
Name Area of Responsibility
Address Registration Number
Signature
•
Telephone Expiration Date
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
9.3 General Contractor
Henry General Contractors, Inca Not Applicable ❑
Company Name:
Brian Henry
Responsible In Charge of Construction
1464 State Street, Springfield,MA 01109
Address
b- (413) 301-5655
Signature Telephone
Versionl.7 Commercial Building Permit May 15,2000
8. NORTHAMPTON ZONING
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size Existing
Frontage Existing
Setbacks Front Ex.
Side L: R: L:Ex. R:Ex.
Rear Ex.
Building Height Ex.
Bldg. Square Footage % Ex. Ex.
Open Space Footage
(Lot area minus bldg&paved Ex. Ex.
parking)
#of Parking Spaces Ex.
(volume&Location) Existing
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO Q DON'T KNOW 0 YES Q
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO Q DONT KNOW 0 YES Q
IF YES: enter Book Page and/or Document#
B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES Q
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained IQ Obtained Q , Date Issued:
C. Do any signs exist on the property? YES 0 NO Q
IF YES, describe size, type and location: Existing
D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO 0
IF YES, describe size, type and location:
E. Will the construction activity disturb(clearing,grading, excavation, or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES Q NO 0
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
Version1.7 Commercial Building Permit May 15,2000
SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000
CUBIC FEET OF ENCLOSED SPACE
Interior Alterations MI Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑
Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other❑
Brief Description Replacement of front door and vestibule door. Replacement of finishes in vestibule.
Of Proposed Work:
SECTION 5-USE GROUP AND CONSTRUCTION TYPE
USE GROUP(Check as applicable) CONSTRUCTION TYPE
A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A I 1:1
A-4 ❑ A-5 ❑ 1B ❑
B Business ❑ 2A ❑
E Educational ❑ 2B I ❑
F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑
H High Hazard ❑ 3A ❑
I Institutional ❑ I-1 ❑ 1-2 ❑ 1-3 ❑ 3B ❑
M Mercantile ❑ 4 ❑
R Residential p R-1 ❑ R-2 MI R-3 ❑ 5A ❑
S Storage ❑ S-1 ❑ S-2 ❑ 5B
[ 0
U Utility ❑ Specify:
M Mixed Use ❑ Specify:
S Special Use ❑ Specify:
COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE
Existing Use Group: R-2 Proposed Use Group: R-2
Existing Hazard Index 780 CMR 34): 2 Proposed Hazard Index 780 CMR 34): 2
SECTION 6 BUILDING HEIGHT AND AREA
BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY
Floor Area per Floor(sf)
1St 1St
2nd 2nd
3rd 3rd
4th 4th
Total Area(sf) Total Proposed New Construction(sf)
Total Height(ft)
Total Height ft
7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System:
Public p Private ❑ Zone Outside Flood Zone p Municipal p On site disposal system❑
Versionl.7 Commercial Building Permit May 15,2000
Department use only
City of Northampt• �, _ n Status of Permit:
Building Departm= -'■I� !'1 Orr u. -7' eway Permit
212 Main Stree r'i � - tai Availability
Room 100 tt/ OCT 2 3 201 ater r 1 Availability
Northampton, MA 410610______ wo p? ;:
File#BP-2014-0529
APPLICANT/CONTACT PERSON HENRY GENERAL CONTRACTORS INC
ADDRESS/PHONE 1464 STATE ST SPRINGFIELD (413)301-5655
PROPERTY LOCATION 56 MAPLE ST-TOBIN MANOR
MAP 23A PARCEL 039 001 ZONE GB(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out Q'' do /�g
Fee Paid j SF/
Typeof Construction: INSTALL REPLACEMENT FRONT&VESTIBULE DOOR&FINISHES
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License 084258 _iQ/
3 sets of Plans/Plot Plan .//�1�4_
THE FOLL G ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFO TION PRESENTED:
pproved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Pennrit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
A,
'%on Delay
/A2 /$
Signa re of Building •f icial Date
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning&Development for more information.
56 MAPLE ST-TOBIN MANOR BP-2014-0529
GIS#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 23A-039 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: renovation BUILDING PERMIT
Permit# BP-2014-0529
Project# JS-2014-000908
Est. Cost: $16220.00
Fee: $97.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: HENRY GENERAL CONTRACTORS INC 084258
Lot Size(sq. ft.): 64904.40 Owner: NORTHAMPTON HOUSING AUTHORITY TOBIN MANOR
Zoning: GB(100)/ Applicant: HENRY GENERAL CONTRACTORS INC
AT: 56 MAPLE ST - TOBIN MANOR
Applicant Address: Phone: Insurance:
1464 STATE ST (413) 301-5655
SPRINGFIELDMA01109 ISSUED ON:11/4/2013 0:00:00
TO PERFORM THE FOLLOWING WORK:INSTALL REPLACEMENT FRONT & VESTIBULE
DOOR & FINISHES
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 11/4/2013 0:00:00 $97.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner