Loading...
31D-166 (8) ,31 TJ -1 Co OCT 3 1 2013 IRV /11111111111M101.71 Electr,,. 1 cctwns _ 0 October 24. 2013 JACOB SMITH ENGINEERING & DESIGN To: Louis Hasbrouck Building Commissioner Town of Northampton 210 Main Street Northampton, MA 01060 Re: The Academy of Music Fire Escapes 274 Main Street Northampton MA 01060 Mr. Hasbrouck: Due to the time required for all pertinent parties to review the proposed new fire escape design that I have previously produced for the address specified above. It seems likely that after the bidding process, shop drawings, fabrication and galvanization the new fire escapes would be ready to be installed around January 2014. Installing the new fire escapes in cold weather can adversely affect the quality of the concrete and the bond strength of the typical all-thread rod epoxy adhesive that is specified on the structural contract documents. It is my recommendation that the bidding process, shop drawings, and fabrication commence over the colder months and the instillation of the ready-to-install new fire escapes could be performed in the spring when the average temperature is well above 40 degrees Fahrenheit. It is my determination that the temporary repairs performed last February on the remaining three fire escapes will be sufficient to provide safe emergency egress until they can be replaced in the spring of 2014. Please do not hesitate to contact me with any questions. Sincerely, Jacob �it Epgineering and Design By , l�c,,�.,��QQ / Jacob F. Smith, P.E. 8 COATES AVENUE; SOUTH DEERFIELD, MA 01373 jacob@jacobsmithengineering.com VoicE 413-397-3441 FAX 413-665-1142