Loading...
12C-094 septic plan- 2013a �rE Silt fen ,-O^ straw bale deto'll (nts) Proposed silt fence -i postS food or meia x. d Mth Straw bales to be stak I spacin A I& A a A J& @ 8ft. apart ma. e s . ft. min. len st ,. Mr A %A R .36 3:2 0 Totial, area F . 0 20 Scale. 0 C 0 n.. A &t%j [TIFT UL11 I Puf ova 1F I- N. -D- E, 2;.s G 0A 1% xist n > I-xist g . 0 �z NC E 4) 0 • .%SA n g e pipe MASSACHU SETTS 01" U) FLORD 12' concrete droino Existin P I F. LEGEND GENERAL SEQUENCE OF WORK: 1. Stakeout and review of sediment barrier location and work limit. � _L�_.._L�.._.__I _ __I�._. I - 2. Clearin of work area,. no g rubbin g or g radin g . Prop� draina swale W 3. Sediment barrier installation /T for s rface water runoff 4. Execution and completion of site work. oroun proposed SAS 5. Stabilization of site and removal of erosion controls. /T W PROCEDURES SPECIFICATIONS--. .• J Under util'ities (ref. onl ons and meetin No work shall be performed within 100 feet of an j urilsdictiorvol. /T Pre construction notificati wetland area until oil notification and meetin re of the Order of Conditions have been completed. E T Work 'Limit and Cle-ari' n Before cuttin of ve (other than for surve and la the Work Limit and S Iment 000000 g: 4. Barrier location shall be flo or staked in the field for review and approval b the site en or their re cleared., with- care taken to fell trees awa from wetland areas. There shall no y After approval, work area ma be cle F1 g rubbin g or g radin g until re sediment barriers are installed. 0 e ence t b machine, provided all other gr ound cover is Sedi E T ment Barr 'iers: To facilitate silt fence 'Installation, the trench ma be cu U ch use left intact until after installation. No excavation, g radina, fillin or removal of ve g round cover shalt b'-1-- p erformed ­j �L7,7% w nth in 1'00 feet of an wetland area until' sediment barriers down slope of the proposed work have been. iinstall& as per the e drawin and have been inspected if re in the Order of Conditions. "OTES No construction,, e traffic, stockpiles.. removal of ve or other alteration shall be permitted on tl wetland side of the sediment barrier or marked work limit without the approval of the en or their representative and the ft on s ervat ----- - - - - - - - - C — - t Stockr>il-es: There shall be • a sediment • barrier between an soil • stock pile and the we ed The base of the.:: stockpile . - 1. Th is P -1 6� hzr,. • • for RDA purposes onl The subsurface sewa ds i posal s -shall be kept at least 20 feet from the barrier. Temporar piles of trench spoil ma be closer to the silt fen but shall Ps opes and not rest a the silt fence. Soil expected to remain stockpiled for over 30 da shall be shaped to stoble"I :5 for reference onl A complete s in full compliance w the State sh own within a swale, droina or other p, h of seeded or mulched for temporar cover. No stockpile shall be placed concentrated surface runoff. nirin� ental Code Title-5 will be 'installed at a later date-. in Tpm.nnrnry rtinnff r!nntrn1q-- As site nrad*tna oroaresses. temoor-ory erosion control measures shall be installed, M`6" tained, and TIMOTHY E. MAGIN 4 October 10, 2013 0— -a -w le,.R-K---�- 0-- . +': �.... w+, - ' - siii'n' i�+• ': fi ..i aw:.at,° .lvW.1: .. 5:', gg 0 S E D IS APPROVED BY TIH E R R OF WORK I Y N0FR'T'HAMR-T0N CONSERVATION COMMISSION- rF EDGE OF BVW 75' BUFFER ZONE 100' BUFFER ZONE ,EXISTING SAS .06 .......... EXISTING LEACHING PIT 901, EXISTING SEPTIC TANK 7.4 PROPOSED CONTOURS AL AU EXISTING B JJL 4v, 4F-� TREE LINE TEST PIT PERC TEST STRAW. BALES SILT FENC GENERAL SEQUENCE OF WORK: 1. Stakeout and review of sediment barrier location and work limit. � _L�_.._L�.._.__I _ __I�._. I - 2. Clearin of work area,. no g rubbin g or g radin g . Prop� draina swale W 3. Sediment barrier installation /T for s rface water runoff 4. Execution and completion of site work. oroun proposed SAS 5. Stabilization of site and removal of erosion controls. /T W PROCEDURES SPECIFICATIONS--. .• J Under util'ities (ref. onl ons and meetin No work shall be performed within 100 feet of an j urilsdictiorvol. /T Pre construction notificati wetland area until oil notification and meetin re of the Order of Conditions have been completed. E T Work 'Limit and Cle-ari' n Before cuttin of ve (other than for surve and la the Work Limit and S Iment 000000 g: 4. Barrier location shall be flo or staked in the field for review and approval b the site en or their re cleared., with- care taken to fell trees awa from wetland areas. There shall no y After approval, work area ma be cle F1 g rubbin g or g radin g until re sediment barriers are installed. 0 e ence t b machine, provided all other gr ound cover is Sedi E T ment Barr 'iers: To facilitate silt fence 'Installation, the trench ma be cu U ch use left intact until after installation. No excavation, g radina, fillin or removal of ve g round cover shalt b'-1-- p erformed ­j �L7,7% w nth in 1'00 feet of an wetland area until' sediment barriers down slope of the proposed work have been. iinstall& as per the e drawin and have been inspected if re in the Order of Conditions. "OTES No construction,, e traffic, stockpiles.. removal of ve or other alteration shall be permitted on tl wetland side of the sediment barrier or marked work limit without the approval of the en or their representative and the ft on s ervat ----- - - - - - - - - C — - t Stockr>il-es: There shall be • a sediment • barrier between an soil • stock pile and the we ed The base of the.:: stockpile . - 1. Th is P -1 6� hzr,. • • for RDA purposes onl The subsurface sewa ds i posal s -shall be kept at least 20 feet from the barrier. Temporar piles of trench spoil ma be closer to the silt fen but shall Ps opes and not rest a the silt fence. Soil expected to remain stockpiled for over 30 da shall be shaped to stoble"I :5 for reference onl A complete s in full compliance w the State sh own within a swale, droina or other p, h of seeded or mulched for temporar cover. No stockpile shall be placed concentrated surface runoff. nirin� ental Code Title-5 will be 'installed at a later date-. in Tpm.nnrnry rtinnff r!nntrn1q-- As site nrad*tna oroaresses. temoor-ory erosion control measures shall be installed, M`6" tained, and TIMOTHY E. MAGIN 4 October 10, 2013 0— -a -w le,.R-K---�- 0-- . +': �.... w+, - ' - siii'n' i�+• ': fi ..i aw:.at,° .lvW.1: .. 5:', gg 0 S E D IS APPROVED BY TIH E R R OF WORK I Y N0FR'T'HAMR-T0N CONSERVATION COMMISSION- rF