Loading...
31B-230 (3) CARLSON&SCHMITT ARCHITECTS INC (5 çh % SOUTH END BRIDGE CIRCLE AGAWAM,MASS.01001 (413)73351.06 786-5556 MICHAEL' S HOUSE Northampton, MA February 24, 1981 ADDENDUM #1 • 1. Drawing L-1. Omit fence and gate at east end of property between convent and St. Michael's property. Detail of fence on Drawing L-4 will apply to transformer enclosure only. 2. Drawings L-1, L-2, L-3, L-4. Omit references to garden area and detail for garden timber edging on Drawing L-4. 3. Drawings L-1, L-2, L-3, L-4. Omit benches and bench detail on Drawing L-4, and references to benches in Section 2H of specifications. 4. Specifications, Section B Plumbing, Page 15B-:13: Hot Water Heater, add at end of first paragraph: " . . . , or equal by Burkay" . 5. Sprinkler Drawings: Add on the first, second and fourth floors, one additional sprinkler head in the entry area of each living unit. ft (Page 1 of 1) CARLSON&SCHMITT ARCHITECTS INC. SOUTH END BRIDGE CIRCLE AGAWAM,MASS.01001 (413).F39.s16t- 786-5556 MICHAEL'S HOUSE April 28, 1981 Northampton, MA ADDENDUM #2 Item 1. Add power wiring to .cabinet heaters and unit ventilator shown on drawings H-i thru H-6 as described below. From panel OP1 connect circuit #29 to: 1) First floor unit ventilator in community room 108. 2) Cabinet heater in first floor west vestibule between rooms 105 and 108. 3) Cabinet heater in second floor stair well on NW corner. From panel OP1 connect circuit #31 to: 1) Cabinet heater in first floor elevator lobby. 2) Cabinet heater in first floor main entrance vestibule. 3) Cabinet heater in second floor elevator lobby. 4) Cabinet heater in second floor stair well SW corner. 5) Cabinet heater in third floor elevator lobby. 6) Cabinet heater in fourth floor elevator lobby. NOTE - relocate receptacles shown in elevator lobbies to avoid conflict with cabinet heaters. From panel OP1 connect circuit #33 to: 1) Cabinet heater in first floor stairwell SE corner. 2) Cabinet heater in first floor vestibule SE corner. 3) Cabinet heater in first floor stairwell NE corner. 4) Cabinet heater in first floor vestibule NE corner. Thermostat wirina will be by temperature control contractor under Section 15B of the specifications. (Page 1 of 1) Michael' s House 3 Addendum #3 August B, 1981 wt. k • \ \‘`\`� \\\\ , \\\s,\\\:\. \ \\\\' , \ ‘‘ \\\ ' \ \.\ \ \`, \ \ \ \ \ \ \ \ VI 1 Sik NA A. :11-- !AVM PrAk 11 Ns 5 .,„ i o U 3 N N CO N (Page 2 of 2) CARLSON&SCHMITT ARCHITECTS INC. SOUTH END BRIDGE CIRCLE AGAWAM,MASS.01001 (413). 33.5106 786-5556 MICHAEL'S HOUSE August 8, 1981 Northampton, MA ADDENDUM #3 Purpose of this addendum is to explain the change in manner of insulating inside face of all existing walls. Generally, the change involves omitting the R-13 batt insulation and metal studs as detailed and substituting 2 x 3" wood studs spaced 24" o.c. over the existing wall with R-19 or better high R type rigid insulating sheathing between the studs. Item 1. Section 7D - Thermal Insulation. Page 7D-2, MATERIALS. Add the following: Insulation at Exterior Walls (Inside face of Existing Building) : Foil faced high R value glass fiber reinforced polyisocyanurate foam plastic core. R value: 19 or better. Products: Thermax by Celotex or equal by Owens Corning. Item 2. Section 9A - Gypsum Drywall Page 9A-4. Omit reference to Z-furring members. Page, 9A-9. Omit reference to Z-furring members. Item 3. Exterior walls of existing building to be insulated in accordance with the attached detail. (Page 1 of 2) CARLSON&SCHMITT , (1.5;"‘ ARCHITECTS INC. SOUTH END BRIDGE CIRCLE AGAWAM,MASS.01001 (413)�33-598e- 786-5556 MICHAEL' S HOUSE August 17, 1981 Northampton, MA ADDENDUM #4 Ratings of Partitions All party walls between living units and between units and public spaces or corridors are to be carried to the underside of deck above, with 5/8" fire rated drywall on both sides of partitions. All stud bearing walls are also to be covered with 5/8" fire rated drywall both sides above ceilings. d i S� ` ,t y - 4k/ "-- .,i) .4? it 7 N N tl.- i b 7 o 2 ` :4/.9 4 z a ,3 Illaingin ts,1' 1:11111 4 . Nib! II 0 .0-,L .11.mArl . , , mil N 00-4,1„1„....1 ' i h , kz � )1 1 . , ,,, . . _ . ••AL 1 1 A 1,0, i, • iz - - *rd j D 0 1 I 11 -E c.._.9 1 J o ! 1 a fi '.' .ti IL )''< 4�7z „x,51 1 \--fr=t:-i?._ iiimilir.; • ... , ,tg, ! , I , ili L1H_f \\\ flj _ I yc_., 1 r 01 tf 5'r f b t v ; f t71.0-7 No CG1sIrc) �P 0 Iv • zit- IL I—T----- ai\l, ii,1 , _, _ 1' —— — - ''��` ..._�,.....__?, , .____ _ +.' lc, _ If Cr gs X. (________, IP 1 i 1 t (2 ag'2,a 1zh,2 OXI _. V 4 Z. 4 ■ - - . 4 • • r _4 r n . 3 VI st ^ 1 ° 1 r N a D, '1 .Z - , . N 'C . . . I / 1 (N1+ •ro<3 Ltri ) ..1E ri My/C 17 ` C/ -__,,i7-, Michael' s House Addendum #5 Item 5. Drawing A-19, Bathroom Plans, Elevations. On handicapped units, locate adjustable shower head and hose on center line of long side of tub (not in the end wall as shown) . Grab bars to be relocated l'-3" apart below shower slide bar. Item 6. Drawing L-3. 16 white pines shown at south side of property are to be located off of . the 10' right of way. Review with Landscape Architect in field. Item 7. Drawing A-21, Door Schedule. Change Doors 33, Community Vestibule to Exterior, to Pr. 6'-0" x 7 ' -0" x 1-3/4" . (Page 3 of 5) Michael 's House Addendum #5 3rd Floor, West Wing Corridor 2 Floors. Add note: Cut out and repair existing floor cracks. Maintenance, Storage and Electric Rooms: Change floor to concrete finish. 3rd Floor, East Wing Stairhalls 4 & 5. Add note: New vinyl treads over Umaco floor filler and primer on existing slate treads. 4th Floor, West Wing Maintenance Room: Change floor to concrete finish. Omit reference to Storage Room. Item 3. Drawing A-2. Laundry is being relocated from Floor 2 to Floor 3. Floor 2 space will become lounge. Floor to be carpet. Adjustments to associated plumbing, electrical, HVAC item related to this change will be made in the field. Item 4 . Specifications, Section 11A, Kitchen Cabinets.. Page 11A-3. Change manufacturers as follows: Longbell - Sungrain Oak. Tripac - Oakcrest. Omit reference to Excel. (Page 2 of 5) CARLSON&SCHMITT ARCHITECTS INC. SOUTH END BRIDGE CIRCLE AGAWAM,MASS.01001 C (413)7335-106- 786-5556 MICHAEL'S HOUSE September 24, 1981 Northampton, MA ADDENDUM #5 Item 1. See attached drawings dated 9/22/81, relative to office/mail area details and dimensions. Item 2 . Refer to Room Finish Schedule, Drawing A-11. Make following corrections: 1st Floor, West Wing Corridor Two: Change floor and base to carpet and vinyl base. Elevator Machine Room: Change floor to concrete finish. Electric Room: Change floor to concrete finish. Omit reference to service corridor. 1st Floor, East Wing Stairhalls 4 & 5. Add note: New vinyl treads over Umaco floor filler and primer on existing slate treads. 2nd Floor, West Wing Corridor 1. Walls: Omit reference to brick - cover all walls with drywall. Corridor 2. Floors. Add note: Cut out and repair existing floor cracks. Maintenance Room, Storage Room, Electric Room: Change floors to concrete finish. 2nd Floor, East Wing Stairhalls 4 & 5. Add note: New vinyl treads over Umaco floor filler and primer on existing slate treads. (Page 1 of 5 ) 1-- SEP 2 81981 , DEPT. CARLSON&SCHMITT "') A ARCHITECTS INC. (Cc% SOUTH END BRIDGE CIRCLE AGAWAM,MASS.01001 TRANSMITTAL To: Cecil Clark, Building Inspector Date: September 25, 1981 City Hall kroject: Michael ' s House Main Street Location: Northampton Northampton, MA Project No. 25-76 We are sending you the following material herewith , ,_under separate cover No. of Copies Description of Item Enclosed are copies of all addenda for above project. Construction start is scheduled for next week. • • • I Sent by: David Carlson Messenger: Our Other First Class Mail Other By: fLL) Miscellaneous