24. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition
requires a 16 GA 1 1/2" strap across the area and 6" beyond each side with 8- 10nd nails.780 CMR
R602.6.1
25. Dryer duct transition is limited to 8' of aluminum flex and must be exposed. 780 CMR M1502.4.3
26. Dryer duct maximum equivalent length is 25' or per manufacturer's specs.780 CMR M1502.4.4.1, no
screwed connections.
27. Markup air is required for any exhaust hood of 400 CFM or more. 780 CMR M1503.4
28. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work
maintaining 1" clearance for 5' from the duct outlet for all fireplaces
29. Fire and draft stopping shall be completed before rough inspection. 780 CMR R302.
30. Ignition barriers in place before final.780 CMR R316.
31. Dwelling/Garage fire separation.An attached garage (within 3' of main structure) is required to have W'
drywall on the garage side of the separation wall and if there is a finished space above the garage all
walls must have 1/2" drywall and the ceiling 5/8" drywall.780 CMR R302.6
32. Energy aspects shall comply with the stretch energy code.780 CMR Appendix 115AA or 2009 IECC.
a. An initial HERS evaluation is required including insulation levels anticipated.
b. A final HERS evaluation confirming code requirements have been met including duct testing.
c. A signed copy of the Thermal Bypass Checklist.
d. Energy information including mechanical equipment posted on the electric panel.
e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star
Windows and the Thermal Bypass Checklist. Duct blast testing when practicable.
f. All band joist insulation must be enclosed within an air tight cavity, which you must create.
33. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is
a difference between a vapor retarder or barrier and an air barrier. An air barrier is intended to stop air
flow(convection) a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion).
A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has
to be absolute and complete. If air can leak through an electrical device or through a crack it follows the
path of least resistance and carries 99%of the moisture in a structure.This is evident every time one
exposes fiberglass insulation and finds black insulation, which is dirt filter out of the air moving through
the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements.
34. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4.
35. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:ThruLoks
are engineered for post attachment supporting a railing.
36. Smoke and CO detectors as required. 780 CMR R314 and R315.
a. Smokes in each bedroom,within 10' of a bedroom door.
b. CO within 10' of bedroom doors, at each level,at the bottom of a stair leading to a finished floor
above,for every 1500 sqft, (plumbing code in the mechanical room) Except if there are no fossil
burning fuels.
c. Heat detector in attached garage, and other large unfinished unconditioned spaces.
37. Closets beneath stair which have doors must be drywalled with'A".780 CMR R302.7
38. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of
ceiling joist to bottom of rafters an attic access of minimum RO of 22" x 30" is required to be located in
an accessible place. It must be insulated,gasketed, and secured in place.
Relevant items must be submitted to the building department for approvals before inspections and or
Certificates of Occupancy can be issued.
are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is
required with a load path to the foundation.
11. Steel straps over the ridge or 1x4 minimum collar ties are required 4'OC in the upper 1 131d 780 CMR
R802.3.1
12. Ridge boards must be the full depth of the cut. 780 CMR R802.3.
13. A complete window and header schedule is required. 780 CMR Table R502.5 for header sizing and
number of jack studs required.
14. All framing materials which are not code prescriptive must have stamped engineering.
a. LVLs
b. I-joist and or Floor Truss
c. Roof truss
15. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall
method being used. 780 CMR 602.10.
a. Garage corners and large corner window/door layout may require special solutions.
b. All corners must be appropriately attached to the foundation.
c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3"
respectively using 8d common nails or galvanized box nails.
16. When nailing sheathing make sure your pneumatic nailer's pressure is properly set. Nails set too deep,
essentially perforate the sheathing weakening it and contribute to building damage in high wind events.
17. Ceiling heights minimum 7'for habitable spaces, 6'8" for bathrooms includes tub/shower area if a
shower head is used, 6'8" for basements, 6'4" at beams/ducts.780 CMR R305.1. MA amended
18. Hazardous glazing locations,within 24" of a door, or within 60" of a stair,or across from hot tubs,spas,
bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4
19. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4"
sphere rule.Order restrictors. 780 CMR R612.2
20. Egress and emergency escape requirements shall be strictly met.
a. Basements, habitable attics, and all sleeping rooms require emergency escape.780 CMR R310
b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft
at 15t floor. Minimum clear opening 20"x24" or 24"x20". 780 CMR R310.1.1
c. Two doors remote as possible at the normal level of travel, opening measured from the face of
the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high. 780 CMR
R311.2
d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7%"from
the top of the threshold and only in-swinging doors. 780 CMR R311.3
21. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9",
maximum riser 8%", maximum overall variance for the run is 3/8",4" sphere rule on risers except where
the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade,6" in the triangle.
Graspable rail 1%" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or
more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. 780
CMR R311.7.
22. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than
30" above floor or grade within 36",4" sphere rule.780 CMR R312.1.
23. Educate the plumber and electrician about maximum notch and hole sizes, and placement.780 CMR
R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge,
In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes
in joist are a maximum 1/3 the depth not closer than 2" from the top or bottom or to any other hole.
Notches are different.
City of Northampton
10 H M,�.4 �� S,f
'P '''''' Massachusetts w ;
' DEPARTMENT OF BUILDING INSPECTIONS 4�.
4 �"' 1., t
212 Main Street • Municipal Building k ,,,
Northampton, MA 01060 ,f`11 .71\'1,
INSPECTOR
Robert Walker April 19, 2013
36 Center Street
Northampton, MA 01060
Subject Location: 25 Hampden Street
Map Block: 38D-018
Mr. Walker,
Your building permit application and plans for mudroom, kitchen, and master bedroom dated 4-15-13 have
been approved as drawn and per this memo.All work must meet all applicable codes whether noted or not
included within this memo.
Please follow up on the following items:
These items will need to be accomplished as the project moves forward and before rough inspections;
1. Stamped engineering for all non prescriptive materials and or systems.
2. Smoke and CO detectors must be upgraded throughout the home to current standards as required
per code.
3. One master bedroom window must meet the requirements for an emergency escape.
4. A fire stop will be required midway across the furred floor system to break the floor system into
section not more than 10'.
5. The crawl vapor barrier must be sealed to the perimeter walls and sealed.
As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments.
In the following are some generic requirements which seem to be problematic.
This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes.
Read only international codes are available on line at http://publicecodes.cyberregs.com/icod/one
must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs .
The current relevant building codes are:
2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 IECC,AA115, MA amendments.
1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments.
2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements.
3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I
soils (table R405.1)
4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.
5. Through wall form ties must be removed from both faces and patched with hydraulic cement. 780 CMR
R406.2 of amendments.
6. Foundation anchor bolts must be%2" and be embedded a minimum of 7" into the concrete. 10" bolts!
780 CMR R403.1.6
7. Foundation walls require horizontal reinforcement 2#4 bars one within 12"of the top and one in the
middle if 8'or less and 3#4 bars at top and 3rds if over 8'.780 CMR R404.1.2(1).Also see vertical
reinforcements requirements.
8. CMU foundations require 3/8" parging before damp proofing. 780 CMR R406.1 see exceptions.
9. Emergency escape is required out of every basement whether habitable or not.780 CMR R310.1
10. Ceiling joist are intended to prevent spread,once raised above the wall plate they become rafters ties
and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common
NOTE:
PROPERTY LINES SHOWN ARE APPROXIMATE,
A FULL FIELD SURVEY IS REQUIRED TO
ACCURATELY DETERMINE THEIR LOCATION.
110'±
BOOK 8384, PAGE 116 GAR. NOTE:
W BOOK 526, PAGE 50 SUBJECT TO EASEMENTS AND
LOTS #20-21 & PORTION . RIGHTS OF WAYS OF RECORD.
OF LOT #22
o ui
(/) w Q
or-
#25 141
CL •
✓� L_ - J # I
k
11
H AM PDEN STREET
TO: FLORENCE SAVINGS BANK &
LAWYERS TITLE INSURANCE CORPORATION
TO THE BEST OF MY INFORMATION, KNOWLEDGE AND BELIEF
I HEREBY REPORT THAT I HAVE EXAMINED THE PREMISES AND BASED ON EXISTING
MONUMENTATION ALL VISIBLE EASEMENTS, ENCROACHMENTS AND BUILDINGS ARE LOCATED ON
THE GROUND AS SHOWN AND THAT THE BUILDINGS ARE ENTIRELY WITHIN THE LOT LINES,
EXCEPT AS NOTED. I FURTHER REPORT THAT THE PROPERTY IS NOT LOCATED WITHIN
A FLOOD PRONE AREA AS SHOWN ON FEDERAL FLOOD INSURANCE MAPS FOR
COMMUNITY #250167
—NOTE—
SURVEYOR: Q�r-B- 41./ THIS PLAT FOR MORTGAGE LOAN PURPOSES ONLY
AND DOES NOT CONSTITUTE A PROPERTY SURVEY
P��N °F Mgss�y —MORTGAGE LOAN INSPECTION PLAT—
NORTHAMPTON, MASSACHUSETTS
6 RANDALL G,,
g E. PREPARED FOR
IZER N CALEB M. & MARGARET B. ROUNDS
#35032 SCALE: 1"=30' JULY 16, 2008
RvO° HAROLD L. EATON AND ASSOCIATES, INC.
REGISTERED PROFESSIONAL LAND SURVEYORS
235 RUSSELL STREET — HADLEY — MASSACHUSETTS
0 2009 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
Wall 28.00
Floor 14.00
Ceiling/Roof 60.00
Ductwork(unconditioned spaces):
Glass& Door Rating U-Factor SHGC
Window 0.30
Door
Heating& Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments:
.r
I I
2009 IECC Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions
Value Value
401.3 Compliance certificate posted. ❑Complies Requirement will be met.
[FI7]2 ❑Does Not Comply
U1 ❑Not Observable
['Not Applicable
303.3 Manufacturer manuals for mechanical ❑Complies
[FI18]3 and water heating equipment have ❑Does Not Comply
been provided. ONot Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 1 2 Medium Impact(Tier 2) 13 I Low Impact(Tier 3)
Project Title: Rounds Report date: 04/17/13
Data filename: \\sbs2011\user data\bwalker\My Documents\REScheck\Rounds.rck Page 7 of 7
. 1
2009 IECC Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions
Value Value
402.1.1, Ceiling insulation R-value.Where>R- R- R- DComplies See the Envelope Assemblies table for
values.
402.2.1, 30 is required,R-30 can be used if 0 Wood 0 Wood ElDoes Not Comply
402.2.2 insulation is not compressed at eaves. 0 Steel 0 Steel IDINot Observable
[FI111 R-30 may be used for 500 ft2 or 20% ['Not Applicable
V.,' (whichever is less)where sufficient
space is not available.
303.1.1.1, Ceiling insulation installed per DComplies Requirement will be met.
303.2 manufacturers instructions.Blown ODoes Not Comply
[FI211 insulation marked every 300 ft2. D Not Observable
-U1 ONot Applicable
402.2.3 Attic access hatch and door insulation R- R- DComplies Requirement will be met. 1
[FI311 R-value of the adjacent assembly. —
1:1Does Not Comply
Al..1 ['Not Observable
IDNot Applicable
402.4.2, Building envelope tightness verified ACH 50= ACH 50= DComplies
402.4.2.1 by blower door test result of<7 ACH ODoes Not Comply
[FI1711 at 50 Pa.This requirement may IDINot Observable
Ai instead be met via visual inspection, IDNot Applicable
in which case verification may need to
occur during Insulation Inspection.
402.4.3 Wood-burning fireplaces have DComplies
[FI812 gasketed doors and outdoor ODoes Not Comply
t4, combustion air. ONot Observable
IDNot Applicable
403.2.2 Post construction duct tightness test cfm cfm DComplies
[FI411 result of 8 cfm to outdoors,or 12 cfm ElDoes Not Comply
across systems.Or,rough-in test
MI IDNot Observable
result of 6 cfm across systems or 4 [Not Applicable
cfm without air handler.Rough-in test
verification may need to occur during
Framing Inspection.
403.11 Programmable thermostats installed DComplies
[FI912 on forced air furnaces. ElDoes Not Comply
IDINot Applicable
403.1.2 Heat pump thermostat installed on DComplies
[F11012 heat pumps. DDoes Not Comply
403.4 Circulating service hot water systems DComplies
[FI1112 have automatic or accessible manual ODoes Not Comply
tt, controls. IDNot Observable
IDNot Applicable
403.9.1 Readily accessible switch on heaters I:Complies
[FI1213 for swimming pools. ODoes Not Comply
4' IDNot Observable
IDNot Applicable
403.9.2 Timer switches on pool heaters and DComplies
[FI1913 pumps are present. EIDoes Not Comply 1
.V.,, [Not Observable
ONot Applicable
403.9.3 Heated swimming pools have a cover. DComplies
[FI2013 Covers on pools heated over 90°F ODoes Not Comply
are insulated to R-12. ONot Observable
IDNot Applicable
404.1 50%of lamps in permanent fixtures DComplies
[FI611 are high efficacy lamps. ODoes Not Comply
IDINot Applicable
Fi[�i � ----��---�l
/ . /..=.—~._`._ / _ /--__----` _ . ��===-�— — __�3)
Project Title: Rounds Report date: 04/ 7n3
Data filename: 0abo2O11\uoer .mk Page 6 of 7
t
i
2009 IECC Insulation Inspection Plans Ver fied Field Verified Complies? Comments/Assumptions
Value 303.1 All installed insulation is labeled or the ❑Complies Requirement will be met.
[IN13]2 installed R-values provided. ❑Does Not Comply
' ' ❑Not Observable
❑Not Applicable
402.1.1, Wall insulation R-value.If this is a R- R- ❑Complies See the Envelooe Assemblies table for
402.2.4, mass wall with at least'A of the wall 111 Wood ❑ Wood ❑Does Not Comply values.
402.2.5 insulation on the wall exterior,the ❑ Mass ❑ Mass ❑Not Observable
[IN3]V exterior insulation requirement I
applies. ❑ Steel ❑ Steel :Not Applicable
303.2 Wall insulation is installed per ❑Complies Requirement will be met.
[IN4]' manufacturer's instructions. ❑Does Not Comply
['Not Observable
I ❑Not Applicable
402.2.11 Sunroom wall insulation has a R- R- ❑Complies
[IN8]' minimum R-value of R-13.New walls ❑Does Not Comply
separating the sunroom from ❑Not Observable
44* conditioned space must meet code
❑Not Applicable
requirements.
303.2 Sunroom wall insulation installed per ❑Complies
[IN9]' manufacturer's Instructions. ❑Does Not Comply
, , ❑Not Observable
❑Not Applicable
402.2.11 Sunroom ceiling minimum insulation R- R- ❑Complies
[IN10]' R-value of R-19 in Climate Zones 1-4, ❑Does Not Comply
and R-24 in Climate Zones 5-8. ❑Not Observable
❑Not Applicable _I
303.2 Sunroom ceiling insulation is installed ❑Complies
[IN11]1 per manufacturer's instructions. ElDoes Not Comply
❑Not Observable
❑Not Applicable _I
Additional Comments/Assumptions:
LI_ i High Impact(Tier 1) 12 I Medium Impact(Tier 2) 13"Low Impact(Tier 3)
Project Title: Rounds Report date: 04/17/13
Data filename: \\sbs2011\user data\bwalker\My Documents\REScheck\Rounds.rck Page 5 of 7
2009 IECC ! Framing/Rough-In Inspection ( Plans Verified fled Field Verified Complies? Comments/Assumptions
402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies table for
402.3.1, average). ❑Does Not Comply values.
402.3.3, ❑Not Observable
402.5
❑
[FR2]1 Not Applicable
— ------------- - - --- -- ----------- ----- ---------------------
303.1.3 U-factors of fenestration products are ❑Complies Requirement will be met.
[FR4]1 determined in accordance with the ❑Does Not Comply
\ NFRC test procedure or taken from ['Not Observable
the default table. ❑Not Applicable _-- — —1
402.3.5 Sunrooms enclosing conditioned U- U- ❑Complies
[FR8]1 space have a maximum fenestration ❑Does Not Comply
U-factor of 0.50 in Climate Zones 4-8. ❑Not Observable
New glazing separating the sunroom
from conditioned space must meet ❑Not Applicable
code requirements.
402.3.5 Sunrooms enclosing conditioned U- U- ❑Complies
[FR9]1 space have a maximum skylight U- ❑Does Not Comply
factor of 0.75 in Climate Zones 4-8. ❑Not Observable
❑Not Applicable
402.4.4 Fenestration that is not site built is ❑Complies Requirement will be met.
[FR20]1 listed and labeled as meeting ❑Does Not Comply
AAMANVDMA/CSA 101/I.S.2/A440 or ❑Not Observable
has infiltration rates per NFRC 400
:Not Applicable
that do not exceed code limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies Requirement will be met.
[FR16]2 sealed at housing/interior finish and ❑Does Not Comply
labeled to indicate 2.0 cfm leakage at ❑Not Observable
75 Pa.
❑Not Applicable
403.2.1 Supply ducts in attics are insulated to R- R- ❑Complies
[FR12]1 R-8.All other ducts in unconditioned R_ R- ❑Does Not Comply
spaces or outside the building ❑Not Observable
envelope are insulated to R-6. ❑Not Applicable
403.2.2 All joints and seams of air ducts,air ❑Complies
[FR13]1 handlers,filter boxes,and building ❑Does Not Comply
cavities used as retum ducts are ❑Not Observable
sealed. ❑Not Applicable I
403.2.3 Building cavities are not used for ❑Complies
[FR15]5 supply ducts. ❑Does Not Comply
❑Not Observable
❑Not Applicable
403.3 HVAC piping conveying fluids above R- R- ❑Complies
[FR17]2 105°F or chilled fluids below 55°F ❑Does Not Comply
u are insulated to R-3. ❑Not Observable
❑Not Applicable
403.4 Circulating service hot water pipes are R- R- ❑Complies
[FR1812 insulated to R-2. ❑Does Not Comply
❑Not Observable
❑Not Applicable
403.5 Automatic or gravity dampers are ❑Complies Requirement will be met.
[FR19]2 installed on all outdoor air intakes and ❑Does Not Comply
y exhausts. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
F 1 [High Impact(Tier 1) [ 2 I Medium Impact(Tier 2) 1 3 I Low Impact(Tier 3)
Project Title: Rounds Report date: 04/17/13
Data filename: \\sbs2011\user data\bwalker\My Documents\REScheck\Rounds.rck Page 4 of 7
,
..,
I
2009 IECC 1 Foundation Inspection Plans Verified Field Verified
Complies? Comments/Assumptions
Value Value
402.2.9 _ Unvented crawl space wall insulation R- R- DComplies See the Envelope Assemblies table for
[F07]1 R-value. R- R- ODoes Not Comply values.
4* ONot Observable
Ej Not Applicable
- ---- —
303.2 Unvented crawl space wall insulation DComplies
[F08]1 installed per manufacturer's 1=IDoes Not Comply
instructions. ENot Observable
EiNot Applicable
402.2.9 Unvented crawl space continuous DComplies Requirement will be met.
[F09]1 vapor retarder installed over exposed Li Does Not Comply
earth,joints overlapped by 6 in.and
Li Not Observable
sealed,extending at least 6 in.up and ONot Applicable
attached to the wall.
402.2.9 Unvented crawl space wall insulation in. in. DComplies See the Envelope Assemblies table for
[F01011 depth of burial or distance from top of D Does Not Comply values.
wall.
14' :Not Observable
['Not Applicable
303.2.1 A protective covering is installed to Li Complies
[F011]2 protect exposed exterior insulation Li Does Not Comply
and extends a minimum of 6 in.below
grade. ONot Observable
['Not Applicable
403.8 Snow-and ice-melting system DComplies
[F012? controls installed. ODoes Not Comply
‘,411 ONot Observable
IDNot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) I 2 Medium Impact(Tier 2) 1 3 1Low Impact(Tier 3)
■ _._
Project Title: Rounds Report date: 04/17/13
Data filename: 1\sbs2011\user data\bwalker\My Documents\REScheck\Rounds.rck Page 3 of 7
1
ciREScheck Software Version 4.4.4
Inspection Checklist
Requirements: 28.0% were addressed directly in the REScheck software
Text in the"Comments/Assumptions"column is provided by the user in the REScheck Requirements screen. For each requirement,the
user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance
is itemized in a separate table,a reference to that table is provided.
1 i
2009 IECC Pre-Inspection/Plan Review Plans Verified Field Verified Complies? Comments/Assumptions
Value Value
103.2 Construction drawings and ❑Complies Requirement will be met.
[PR1]1 documentation demonstrate energy ❑Does Not Comply
code compliance for the building ❑Not Observable
envelope.
['Not Applicable
103.2, Construction drawings and ❑Complies
403.7 documentation demonstrate energy ❑Does Not Comply
[PR3]1 code compliance for lighting and I
❑Not Observable
mechanical systems.Systems serving
❑Not Applicable
multiple dwelling units must
demonstrate compliance with the
commercial code.
403.6 Heating and cooling equipment is Heating: Heating: ❑Complies
[PR2]2 sized per ACCA Manual S based on Btu/hr Btu/hr DDoes Not Comply
loads per ACCA Manual J or other
V Cooling: Cooling: ❑Not Observable
approved methods. Btu/hr Btu/hr ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) ! 3 Low Impact(Tier 3)
Project Title: Rounds Report date: 04/17/13
Data filename: \\sbs2011\user data\bwalker\My Documents\REScheck\Rounds.rck Page 2 of 7
t
ciREScheck Software Version 4.4.4
Compliance Certificate
Project Title: Rounds
Energy Code: 2009 IECC
Location: Northampton,Massachusetts
Construction Type: Single Family
Project Type: Addition
Conditioned Floor Area: 0 ft2
Heating Degree Days: 6404
Climate Zone: 5
Permit Date:
Construction Site: Owner/Agent: Designer/Contractor:
25 Hampden Street Robert Walker Robert Walker
Northampton,MA 01060 Construct Associates,inc. Construct Associates,lOnc.
36 Service Center 36 Service Center
Northampton,MA 01060 Northampton,MA,MA 01060
413-584-1224 413-584-1224
walker @constructassociates.com walker @constructassociates.com
Compliance: Passes using UA trade-off
Compliance: 18.1%Better Than Code Maximum UA: 94 Your UA:77
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Cavity Cont. Glazing
Assembly Area or or Door UA
Perimeter
R-Value R-Value U-Factor
Ceiling 1:Raised or Energy Truss 256 0.0 60.0 4
Wall 1:Wood Frame,24"o.c. 864 28.0 0.0 37
Window 1:Vinyl Frame:Double Pane with Low-E 91 0.300 27
SHGC:0.00
Crawl 1:Solid Concrete or Masonry 256 0.0 14.0 9
Wall height:7.0'
Depth below grade:5.0'
Insulation depth:5.0'
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations
submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.4 and to
comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: Rounds Report date: 04/17/13
Data filename: \\sbs2011\user data\bwalker\My Documents\REScheck\Rounds.rck Page 1 of 7
•
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable ❑
Name of License Holder: S05 Z L& ln t As-GiL
C -a 0 2,z- (1 3
License Number
3� `� , C-F C Lc: -) _U2 'CZ- A-i+- r3) IA ( r b ( t 3
Address Expiration Date
Signature Telephone
9.Registered Home Improvement Contractor: Not Applicable ❑
Company Name Registration Number
Address / Expiration Date
Telephone 4- ` 1_-1,4_
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes Clf' No ❑
11. - Home Owner Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable)
New House ❑ Addition Replacement Windows Alteration(s) ❑ Roofing ❑
Or Doors 0
Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [p Siding[0] Other[0]
Brief Description of Proposed
Work: O 14` v, t t4' 2- S.11-'17-1, A^v n%--11-c-t"
Alteration of existing bedroom Yes No Adding new bedroom ✓ Yes No
Attached Narrati Renovating unfinished basement Yes %V No
Plans Attach Roll Sheet
6a. If New house and or addition existing housing. complete the following:
a. Use of building : One Family Two Family Other
b. Number of rooms in each family unit: 1 1 Number of Bathrooms
c. Is there a garage attached?
d. Proposed Square footage of new constructior Dimensions I ( lt` t W j 2- °)" ,-► s V c 15 rficeN-
e. Number of stories? 2-
f. Method of heating? 6- ! i-4--LA--> Fireplaces or Woodstoves 1 f.1) Number of.each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? 14�
h. Type of construction 1.-=4.:09 ` 2-7-L/ Z-4-k c.c
i. Is construction within 100 ft. of wetlands? Yes iO No. Is construction within 100 yr. floodplain Yes 1 No
j. Depth of basement or cellar floor below finished grade Cif CA-k-._:� ci e`L.,() e 4
k. Will building conform to the Building and Zoning regulations? Yes No.
I. Septic Tank City Sewer W Private well City water Supply W
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I, f r Q u .�,cl ) , as Owner of the subject
property
hereby authorize 120/ _(z 5\-- -lC-, -+e--
to act on my behalf, in all matters relative to work authorized by this building permit application.
Signature o Owner Date
I, T Qj Cz�A-- � 4( , as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
Print Name ,,�.� A�
Signature of Owner/Agent Date
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size f 1 / We < i , 006
Frontage 1 l 0 r E 1 C>
Setbacks Front -2c, 2-
'
Side L: 610 R: )8 L: S0 R: lg
Rear le' 4-6
Building Height 27' Z c
Bldg. Square Footage 7 5 % t c� t L �-
t� l.
Open Space Footage %
(Lot area minus bldg&paved 93 2 0 &4 9.v&3 5-2-Z
parking)
#of Parking Spaces
Fill:
(volume&Location)
A. Has a Spe al Permit/Variance/Finding ever been issued for/on the site?
NO DONT KNOW 0 YES Q
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO 0 DON'T KNOW 0 YES
IF YES: enter Book Page and/or Document#
B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW ® YES Q
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained O Obtained 0 , Date Issued:
C. Do any signs exist on the property? YES ® NO
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO
IF YES, describe size, type and location:
E. Will the construction activity disturb(clearing,grading, ex vation, or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES 0 NO
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
•
/ 1(eg(
—RECEIVED - L Department use only
! ity of Northampton Status of Permit:
APR I 2013 Building Department Curb Cut/Driveway Permit
212 Main Street Sewer/Septic Availability
L__ Room 100 Water/Well Availability
DEPNORTHAMP70N MT.cF rsuiiD , ins 6 0
�uNs Ngrthampton, MA 01060 Two Sets of Structural Plans
A 010
phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans
Other Specify
APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Property Address: This section to be completed by office
2 c P DE(,, c) r c c- Map Lot Unit
NC Ne d \ A Zone Overlay District
0 IM(.)
Elm St.District CB District
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
CALF g Amp F1. .A tZc,C>,-(Z., a 2z:.a:f'--'0 S 7 S t+-40s 47r+k-.) ,�;. c ►Z-+NAAT -
o
Name(Print) Current Mailing Address:
% �._._.. 1( 3 5-x-5-- -0 7-7'
Telephone
Signature
2.2 Authorized Agent:
Name(mint) Current Mailing Address:
Signature Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by permit applicant
1. Building 11 C i '1.J (a)Building Permit Fee Total Cost 2. Electrical c-C 7C;• (b) Construction n from(6)of
3. Plumbing '--/ 3 sz, Building Permit Fee {/,,
4. Mechanical(HVAC) `2j(: D 3 5/. D V
5. Fire Protection /� }0 7.
6. Total=(1 +2+3+4+5) I ' 1 ) 4bQ, Check Number
This Section For Official Use Only
Date
Building Permit Number: Issued:
Signature:
Building Commissioner/Inspector of Buildings Date
File#BP-2013-0958 ti kkr\
APPLICANT/CONTACT PERSON ROBERT WALKER
I
ADDRESS/PHONE 36 Service Center NORTHAMPTON (413)584-1224 Q ' `
�1
PROPERTY LOCATION 25 HAMPDEN ST
MAP 38D PARCEL 018 001 ZONE URB(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out r,
Fee Paid t/ 14Yrel 40 f-37"( .zro Is--. 6
Typeof Construction: 16x16 Two Story Addition //��
New Construction
Non Structural interior renovations AiledAVv-
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License 172016
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INF MATION PRESENTED:
�1//Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
•• : Elm Street Commis
_do.
�/ y �/' 7
Sire of Building 0 icial Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of
Planning&Development for more information.
25 HAMPDEN ST BP-2013-0958
GIS#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 38D-018 CITY OF NORTHAMPTON
Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category:ADDITION BUILDING PERMIT
Permit# BP-2013-0958
Project# JS-2013-001605
Est.Cost: $131400.00
Fee: $351.80 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: ROBERT WALKER 172016
Lot Size(sq. ft.): 11020.68 Owner: ROUNDS CALEB M&MARGARET B
Zoning:URB(100)/ Applicant: ROBERT WALKER
AT: 25 HAMPDEN ST
Applicant Address: Phone: Insurance:
36 Service Center (413) 584-1224
NORTHAMPTONMA01060 ISSUED ON:4/22/2013 0:00:00
TO PERFORM THE FOLLOWING WORK:CONSTRUCT 2 STORY 16 X 16 ADDITION
(MUDROOM/KITCH/MSTR BEDRM
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 4/22/2013 0:00:00 $351.80