FINAL CONSTRUCTION CONTROL DOCUMENT
(for Professional Engineers, Architects responsible for only a portion of a controlled project)
Project Title: 98 King Street Renovation Date: July 7, 2011
Project Location: Elm Street, Smith College Campus. Northampton MA
Scope of Project: Complete Renovation
In accordance with Section 116.2.2 of the Massachusetts State Building Code, 780 CMR, Seventh Edition, I,
Charles P Sharpies Mass. Registration Number 28940 being a registered professional Engineer hereby
CERTIFY that I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [X ] Mechanical
[ ] Fire Protection [ ] Electrical [ ] Other (specify)
for the above named project and that to the best of my knowledge, such plans. computations and specifications meet
the applicable provisions of the Massachusetts State Building Code. all acceptable er ineering practices and all
applicable laws for the proposed project.
I further certify that I have perfonned the necessary professional services and I or my Representative have been
present on the construction site on a regular and periodic basis to determine that the work has proceeded in
accordance with the documents approved for the building permit and shall be responsible for the following as
specified in Secion 116.2.2.
1. Review for conformance to the design concept, shop drawings, samples and other submittals which are
submitted by the Contractor in accordance with the requirements of the construction documents.
2. Review and approval of the quality control procedures for all code - required controlled materials.
3. Be present at intervals appropriate to the state of construction to become generally familiar with the
progress and quality of the work and to determine in general if the work is being performed in a manner
consistent with the construction documents.
Pursuant to Secion 116.4. I have submitted progress reports together with pertinent comm-_ c,; ., - Building
Inspector. Upon completion of the work, I am submitting this Final Report as to the h ,t3tciy t ;`, �, tion of the
work and readiness of the project for occupancy. f i 4 " CHARLES
P.
Signature and Seal of registered professional ' ` i
, ito , ` '
'5 /'
BSCRIBED AND SWORN TO BEFORE ME THIS ('- D.4Y O ' 2011.
7 C r ,
r. i - . ,. _ . —Y- MY COMMISSION EXPIRES //
3 I , ' Y PUBLIC - A DARLENE L. MEACHAM
1 i Notary Public
COMh1QNWEAL H OF MASSACHUSETTS
My Commission Expires
May 11, 2015
TA r,( H,,,,„,,,,d Nfre4 al p selfigit
„. ,
z irs-
,,gai ff i 044 A411.0444s. L Resoo. 1301
,. S'4 g014414%) H4+414 021094619
1 M7)727
fmt (617) 727 -5732
FINAL CONSTRUCTION CONTROL DOCUMENT
(for Professional Engineers /Architects responsible for only a portion of a controlled project)
Project Title: 98 King Street Renovation Date: July 7, 2011
Project Location: 98 King Street, Northampton, MA
Scope of Project: Complete Renovation
In accordance with Section 116.2.2 of the Massachusetts State Building Code, 780 CMR, Seventh Edition, I, Evert
O. Lindgren, Jr. Mass. Registration Number 22425 being a registered professional Engineer hereby
CERTIFY that I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical
[ ] Fire Protection [X ] Electrical [ ] Other (specify)
for the above named project and that to the best of my knowledge, such plans, computations and specifications meet
the applicable provisions of the Massachusetts State Building Code, all acceptable ergineering practices and all
applicable laws for the proposed project.
I further certify that I have performed the necessary professional services and I or my Representative have been
present on the construction site on a regular and periodic basis to determine that the work has proceeded in
accordance with the documents approved for the building permit and shall be responsible for the following as
specified in Secion 116.2.2.
1. Review for conformance to the design concept, shop drawings, samples and other submittals which are
submitted by the Contractor in accordance with the requirements of the construction documents.
2. Review and approval of the quality control procedures for all code - required controlled materials.
3. Be present at intervals appropriate to the state of construction to become generally familiar with the
progress and quality of the work and to determine in general if the work is being performed in a manner
consistent with the construction documents.
Pursuant to Secion 116.4, I have submitted progress reports together with pertinent comments to the Building
Inspector. Upon completion of the work, I am submitting this Final Report as to the satisfactory completion of th-
work and readiness of the project for occupancy. �P�tH OF 4,,
q\ � ? EVERT tiN
Signature and Seal of registered professional: ���� � - 0 0. LINDGREN,
u B1� <- ' JR P.E. a'
j' A , p No. 22425
'�a �rsrE� � �` �
S SCRIBED AND SWORN TO BEFORE ME THIS 0 DAY OF 4,( 201 L FSSr� LNG '
i 21 ( , ^ f - MY COMMISSION EXPIRES tillnraT:
- "ENE MEACHAM
NO P LIC Notary Public
COMM OF MASSACHUSETTS
My Commission Expires
May 11, 2018
Sara E. Campbell, PE
Consulting Civil Engineer
July 7, 2011
Mr. Louis Hasbrouk, Building Commissioner
City of Northampton
Northampton, MA 01061
Re: 98 King Street, Northampton
Dear Mr. Hasbrouk
Being a registered professional Engineer, I hereby certify that I have directly prepared all
design plans, computations, and specifications concerning CIVIL ENGINEERING for the
above project and that, to the best of my knowledge, such plans, computations, and
specifications meet the applicable provisions of the Massachusetts State Building Code, all
acceptable engineering practices, and applicable laws and ordinances for the proposed use
and occupancy.
Based on my site observation and to the best of my knowledge, information, and belief, the
portion of the work indicated above has been completed in compliance with the applicable
provisions of the Massachusetts State Building Code per section 116.2.1 and the contract
documents prepared by our office for the Architect.
Sincerely yours,
Sara E. Campbell, PE
KingCO
16 Prospect Street Millers Falls, MA 01344 saranoh@aal.con, 413 - 4232 -3581
1_8 - j
Ford
Gillen
Architects, Inc.
409 Main Street
Amherst, MA 01002
Tel 413- 253 -2528
Fax 413 - 256 -1553
fgaofEce@fordgillen.com
Kathleen E. Ford, AIA
William V. Gillen, AIA
July 7, 2011
Mr. Louis Hasbrouk, Building Commissioner
City of Northampton
Northampton, MA 01061
Re: 98 King Street Northampton
Dear Mr. Hasbrouk
Being a registered professional Architect, I hereby certify that I have directly prepared all design
plans, computations, and specifications concerning ARCHITECTURAL for the above project and
that, to the best of my knowledge, such plans, computations, and specifications meet the applicable
provisions of the Massachusetts State Building Code, all acceptable engineering practices, and
applicable laws and ordinances for the proposed use and occupancy.
Based on my site observation and to the best of my knowledge, information, and belief, the portion of
the work indicated above has been completed in compliance with the applicable provisions of the
Massachusetts State Building Code per section 116.2.1 and the contract documents prepared by our
office.
Sincerely yours,
11110 /1" ip 6
Kathleen E. Ford
The Commonwealth of Massachusetts ,
4
/- City of Northampton r p
Certificate of Occupancy
In accordance with 780 CMR, Section 5120.2 (The Seventh Edition of the Massachusetts State Building Code)
this Certificate of Occupancy is issued to the premise or structure or part thereof as herein identified.
Identify Name of Building of Space Within Certificate No.
Issued to Valley Community Development Corporation BP- 2011 -0069
Identify property address including street number, name, city or town and county
Located at 98 King Street
Northampton, Hampshire, Massachusetts
Use Classificati n(s) B (Business) R -2 (10 Unit Dwelling)
This Certificate of Occupancy is hereby issued by the undersigned to certify that the premise, structure or portion thereof as herein specified has been inspected for
general fire and life safety features. This certificate shall allow for the use as herein described and in conformance with any and all conditions as identified below. It
shall be posted in a conspicuous place within the space as directed by the undersigned. Failure to post the certificate, failure to comply with conditions or, tampering
with the contents of the certificate is strictly prohibited.
Conditions of Use All Safety and Structural Must Be Maintained
Name of Municipal Date of Inspection Map /Plot:
Building Official Charles Mille 07/08/11
Signature of Municipal - O to f Issuance 31B -157
Building Official /
„,.
A
d
1; 4 7, 2 • 3/, G:7 zt.9
14 2/ J44-7 44i7 7 if-1 1 E-
z>”
-CM d4j 1--A t 1 40'?
# 7OQ 0 454 Z:t..2.1 ?"-Rb; I71 iM) IIQ
# - 9 ) -) /
PF-4 4 -ill A )1 1116
1 „2,00,a7 o - '),10 411 — cl 4- l ' 4711 /11- 4 41 i P
".4
141° DC/V.1 y.?,2 c iyj, 7 14 -2 1 -E
c I
dfq tic.1 . ttv 'SW,' V .
g 5 riP y lAro 4
r -
)7
11 , 4 r 1! , - Fni r ). 7 o,
)1 ZifA s e P 1 ›./ I dx)xa „>K ?w, ir /.06 :)10 t vg
b_
---- z , cas - 77. - 1 - ' a , ,,nrry9 ms)!, •q.1.- —
--\ 1 1 ■1 1, 6.0 1 1
0 4,
98 KING ST BP- 2011 -0069
GIS #: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 31B -157 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: renovation BUILDING PERMIT
Permit # BP- 2011 -0069
Project # JS -2009- 001118
Est. Cost: $936000.00
Fee: $5616.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: 3B Contractor: License:
Use Group: B,R2 TEAGNO CONSTRUCTION INC 034716
Lot Size(sq. ft.): 5401.44 Owner: VALLEY COMMUNITY DEV CORP
Zoning: GB(100)/ Applicant: TEAGNO CONSTRUCTION INC
AT: 98 KING ST
Applicant Address: Phone: Insurance:
P 0 Box 2054 (413) 549 -0803 Workers
Compensation
AM H E RSTMA01004 - 2054 ISSUED ON :: 8/31/2010 0:00:00
TO PERFORM THE FOLLOWING WORK: RENOVATE TO 10 EFFICIENCY APARTMENTS
& GROUND FLR COMMERCIAL SPACE
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of W' in D.P.W. Building Inspector
Underground:12 410 ' 1 vice: Meter: � �' `�
� t S �-�( b -� Z � y ti.-,
Fo o�in ►�.�
Ro ugh : ��`'`� House # Foundation � a
Driveway Final: �l
Final: 'a- �`� l / < Final: • 6 / / / 4v1s .� We ` �3� y = 1�
Rough Frame: Rafr+.t 4 14 0L #a(1 1'C
Pe * .a.,:‘ t ry Ekem;e. f !141 .14101/4..
cC"I, -lvr es or Aqc e
Gas: Fire Department Fireplace /Chimney:
: - 2 Oil:
Rough i� Insulation: 3_3(3 _
/ f - // 3 /( cn
Final: Co e2 I 2. Smoke: Final: 7- -S —// k 11i 1
do
THIS PERMIT MAY BE REVOKED BY E CI Y OF ►tORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REG • �'
Certificate of Occu. anc nature: -
FeeType: Date Paid: Amount:
Building 8/31/2010 0:00:00 $5616.00
212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272
Louis Hasbrouck — Building Commissioner