Loading...
36-400 (4) RECErVVE 0 zy APR - 3 2012 Kohl Construction DEPT. OF BUILDING INSPECTIONS NORTHAMPTON, MA 01080 E ID an www.KohlConstruction.com 31 Campus Plaza Road, Hadley, MA 01035 ph (413) 256 -0321 fx (413) 256 -0130 Dear Louis and Linda, Richard Lloyd discussed the following matter with Commissioner Louis Hasbrouck in November of 2011. It was suggested at the time that we make a formal request for a refund of the building permit • overpayment. paid a permit fee of $2,513.66 on June 1, 2011 based on an incorrect calculation of square footage. The erroneous square footage is listed below: First Floor: 2165 sf x $0.50 Second floor: 2205 sf x $0.30 Non - living: 1643 sf x $0.20 The permit fee based on correct square footage should have been $1,304.10 based on the following square footage. First Floor: 1159 sf x $0.50 Second floor: 1046 sf x $0.30 Non- living: 2054 sf x $0.20 Please refund the permit fee overpayment amount of $1209.56 to Kohl Construction Inc. Sincerely, Fred Meyer '� Project Manager, Estimator 03 X55 013 , - • 4/3// 7_