32C-029 (2) The Commonwealth of Massachusetts
C ity of Northampton
Temporary Certificate of Occupancy
p � i
f .f p y
In accordance with 780 CMR, Section 120.3 (The Eight Edition of the Massachusetts State Building Code)
this Temporary Certificate of Occupancy is issued to the premise or structure or part thereof as herein identified.
Identify Name of Building of Space Within I Certificate No.
Issued to
The Brewery BP- 2012 -0670
Identify property address including street number, name, city or town and county Certificate
Located at Expiration
11 Brewster Court March 10, 2012
Northampton, Hampshire County, Massachusetts
Use Group Restaurant (A -3 use) Allowable
Classification(s) Occupant Load
184
This Temporary Certificate of Occupancy is hereby issued by the undersigned to certify that the premise, structure or portion thereof as herein specified has been
inspected for general fire and life safety features. This certificate shall allow for the temporary use as herein described and in conformance with any and all conditions
as identified below. It shall be posted in a conspicuous place within the space as directed by the undersigned. Failure to post the certificate, failure to comply with
conditions or, tampering with the contents of the certificate is strictly prohibited.
Conditions of Temporary (30 DaA Certificate of Occupancy, pending completion of finishes on the two remodeled rest rooms
Temporary Use
Name of Municipal harles Miller Date of Map /Plot
Building Official Inspection /09/12
Signature of Municipal e
bate of
Building Official Issuance 02/09/12 32C -029
Based nn what lhorcobscnednr the site since the onset of work. and /o the best of m‘
knowledge, all work to date conforms to the requirements set out on my Draw ings A-1 and SD-1.
both . dated Z3Jm'uu�'2Ol2. Inaddbiou deem the completed v/orkVobeiu conformity * ith
reqo`ren�cn�softhe Massachusen5 Building Code (780 CMR— Eighth Edition), and ofihe
Architectural Access Board reLmlations f7.. CAIR I. Consequently. in my opinion. the alterations
to the Northampton Brewery's Men's and Women's Public Rest Rooms are now safe and read)
for use by the general public. despite the interior finish work rrmuioin�(as detailed here earlier).
I therefore see no impediment to your irtranting temporar) Certificate of Occupano for this
project,
Please be in touch if youhsx e an\ questions or concerns about this nformaiion. or ifou need
an) further information from me at this time. Thank }'ou
Kind
pitRizt
Copy: Janet EgelstonProprietress `
Pierre 8e|humcnr, Hans Dalhaus. builders.
Note: distribution to ail parties ia e-mail. and to Charles via LISPS aswell.
Charles Miller, Assistant Northampton Building Commissioner: Northampton Brewery
Pate 2,9 February 20|Z
,
�/\/ � 8 Po7 sJ 2
PIERRE A. BEY HUMEUR AlA A
101 Lovers Lane • P.O. Box 468* Greenfield, MA 01302
413-774-2248 Fax 413-774-2249
l2 August 2Ull
Charles Miller. Assistant BoddiogCnonolsmioucr
Department ufBuildingInspections
212 Main Street. Municipal Knildix�
Northampton. % 01060
Re: Northampton Brewery, 11 Brewster Court, Northampton, MA
01060
Public toilet room interior alterations
Construction progress report
Dear Inspector Miller:
lhuvc just returned from Northampton * here | conducted irk second site risit since work bcaun
there on the Mens aid Women's public toilet rooms late last Sunda night. /\s}'ournuyh�
aware, Brewer) personnel are euE!cr to have this work completed to the point `v here tke`' can
reopen for business this cveninw. at 5:00 PM, l am hopeful that the following infurnuzioo about
prozress to date 1l he suffcient t» allow 'jour issuance ofu<enponzt Certificate of0ccupmncy
for ork completed to date.
Since pr jzctonsez,h,dh toilet room concrete floor slabs have been replaced, along wizhall of the
suhgrndcsuniiar and floor drain plumbing. The new mesh-reinforced concrete floor has been
tinted and sealed. The new and relocated cziaiozplumbing fixtures are all in Their locations
shown oom> Drawing A'l dated Z}Januur>20l2. Also, the new |am\ory counters and fixtures
are mounted on their respective va11s. Prior onInv l2:30PP1 visit, the plumbing work here had
reportedly passed the required inspection.
New toilet partition installation was ondem+o)u1 the time ofo■ 'site visit: a process due for
completion shun|}thereafter ear1 afternoon. Those prebuilt and [refiniahed toilet partitions
*iU ha‘ e lever handle latches for the doors. nhh springhitmo» to assist theirdoyinkt.
Among the piees of orh. remaining and that xill not he cornpleied prior to his C\ ening are new
« uU finishes and replacement u6Un@s. For The moment. the existinau:i)in/5 remain unchanged
and continue in oury ice. and the new wainscot locations havebeen roughed and have their
' ioas tile backer material inplace. These are sc ro he coered ith sea slate.
Work on alt ofthcse surfaces will he onoirig until t project reaches lUO% completion. at
which point}ou will receive another update from stating :hut milestone has been reached..
The rwo toilet room entrance doors a chednled to re.ei e eleetrkall> operatcd door openers
acti\ ated via sa1l paddles in each ofthe rooms, Space is so tiht in eaeh of these rooms thai.
w ithouTdhoucduoractirxznrs,ohc6chnir'houzdponoosw'nuNfindicn«arin/poaih|ezpcsi/
those rooms without another person's assistance. [hose closers are not yet in place due TO an
approximate two-week lead time on delivery, and the w ere ordered last week.