Beaver Brook Leeds traffic studytCgIIVE FEB 2 6 2008 CITY CLERKS OFFICE NORTHAMPTON, MA 01060 D Prepared for Prepared by Traffic Assessment Mr. Patrick J. Melnik 110 King Street Northampton, MA 01060 January 2007 Beaver Brook Estates Northampton, Massachusetts rttissn Flangen Rristlin,..Jy - Transportation, Land Development, Environmental Services One Federal Street, Building 103 -3N Springfield, Massachusetts 01105 413.747.7113 \ I T ransportafion Land Development - Environmental S e r v i c e s Memorandum TTanacs P langes &u u , lttr To: Mr. Patrick J. Melnik 110 King Street Northampton, MA 01060 From: Matthew J. Chase, P.E. Juliet Locke, E.I.T. Date: January 9, 2007 Project No.: 10006.00 Re: Beaver Brook Estates Northampton, MA Vanasse Hangen Brustlin, Inc. (VHB) has been retained by Patrick Melnik (the proponent) to prepare a traffic impact study report outlining the potential traffic issues associated with a proposed residential development in Northampton, Massachusetts. In summary, it is the finding of this assessment that the proposed use on the site is expected to generate a minimal amount of traffic (approximately 25 to 30 peak hour trips) and would have an insignificant effect on area traffic operations. The following documents these findings. PROJECT DESCRIPTION The property, approximate location shown on Figure 1, is a 54 ± acre parcel located on Evergreen Road in Northampton, Massachusetts, and is currently occupied by a 4 -unit residential apartment complex. The proposed development program consists of constructing a 21 -unit single family and a 4 -unit apartment residential subdivision. The existing 4 -unit apartment complex previously mentioned will remain on site, and therefore a total of 29 units (21 single family homes proposed, 4 apartment units proposed and 4 apartment units existing) will occupy the site during full build -out. Access to the site will be provided via a new site driveway, consolidating the two existing driveways located on Evergreen Road. This proposed driveway is will be located directly across from Chestnut Street creating a four -way unsignalized location. EXISTING CONDITIONS Field observations and the expected transportation characteristics of the project helped identify the roadway and intersections that could be affected by the proposed development. In addition, VHB discussed the study area with the Northampton Planning Department to confirm areas of concern. Study Area Roadways Evergreen Road is a residential roadway in a small neighborhood bordered by Florence Street and Route 9 (Haydenville Road). Directly across from the site driveway is Chestnut Street, forming a four - legged intersection. Adjacent to the project site, Evergreen Road and Chestnut Street are two - lane roadways with no pavement markings. The pavement width directly in front of the site is approximately 20 -feet. Existing land use within the immediate vicinity of this site is residential. In addition to reviewing Evergreen Road adjacent the site, the following three intersections are the only access points to the surrounding neighborhood. These intersections were studied in addition to the site driveway to determine existing traffic conditions and potential traffic impacts. IlMaspringlprojects110006 .001docslmemos1Beaver Brook Memorandum 1 09 07.doc One Federal SI Building 102 Springfield, MA 01 413 747 -7 FAX 413 747 -0! Maspring1 projects110006.00 \graphics\ FIGURE'S—Lis map.dwg angen Inc.: NATIm6vm 0 1000 2000 Feet Beaver Brook Estates Northampton, MA Figure 1 Site Location Map Janua( ?007 1000fi.L Study Area Intersections Florence Street at Front Street Front Street intersects Florence Street at a 4 5- degree angle forming a skewe unsignalized intersection. Front Street a d, three legged an 8- percent downgrade. There is no stop p sign or stop line at S the Front Street approach. hick appears is a two -lane roadway with one general - purpose lane in each direction. The posted ears to l on Florence Street is 25 mph in the vicinity of the intersection. Sidewalks are present t the Florence speed limit intersection with a cross -walk from Front Street to the westerly side of Florence Street. Tmit bus stop shelter located at the intersection on Front Street and is serviced by PVTA on the trip to Northampton on a regular basis while the outbound trip is serviced as requested. A detailed a bus schedule is attached to this memorandum. inbound et Looking South on Front Street at Florence Street Route 9 at East Center Street East Center Street intersects Route 9 forming a three -le gged unsignalized intersection. There is no stop sign or stop Tine present along East Center Street. The pavement width at the intersection ' approximately 18 -feet on East Center Street and 24 -feet on Route 9 with three -foot shoulders. The area on Route 9 is primarily wooded, while the existing land use along East Center Street is residential. The posted speed limit on Route 9 is 30 mph. e IlMaspringlprojects110006 .001docslmemosIBeaver Brook Memorandum 1_09_07.doc Looking East on East Center Street at Route 9 -2- Jani' 1, 02 07 100[;, Route 9 at Leonard Street Leonard Street intersects Route 9 at an a pproximately 45- degree angle forming a skewed, three - legged intersection. Leonard Street is under stop control with a pavement width of approximately 23_ feet. Existing land use in the vicinity of the intersection is primaril rest Y dential. 11Maspringlprojecls110006 .001docslmemoslBeaver Brook Memorandum 1 09_07,doc Looking North up Route 9 at Leonard Street Traffic Volumes Peak hour turning movement counts ( T MCs) were conducted on December weekday y0 or hour (7:00 -g :00 AM) and during the weekday evening eak during the weekday mornin g peak h at the above mentioned study area intersections. Figures 2 and 3 illustrate weekday morning and evening g peak hour weekday morning and evening occurred peak 8 :00 to 9:00 respectively. The peak hour for the 00 AM and 4 :15 to : sfrate the Seasonal Variation 5:15 PM. To evaluate the potential for seasonal variation in the existing ' station 11 located on Routes 5 and 10 south of the Hatfield Town Line hour traffic count data, s anon 1 lo c the existing Routes and traffic volumes are Hatfield higher Highway Na monthly historical seasonal adjustment factors were reviewed using the Mass y permanent count traffic volumes by ne {in Northampton). This data adjust the existing approximately at two the average traffic condition y a than the average not percent. Therefore, to be conservati it was not necessa to Vehicle Crash Summary for this area. d from the data was obtained crash daine Ve most recent d three - year a ne Massachusetts Highway Department and the three study area intersections to determine if any current safety (2003 to 2005). This data was reviewed for the site driveway be exacerbated by (MassHighway) for rece three- y the proposed project - related traffic. No crashes were reported during Year time Y deficiencies exist that might three intersections border the the to it (Leonard d iv Street - Y: however four total Center were reported e at the Front Street = 1 crash). - 1 crash, East Getter Street = A crash summary table is attached to this memorandum. 2 crashes, and MassHighway crash rates were calculated for each of the study area effective tool to measure safety hazards. MassHighway develops standard crash rates for g unsignalized intersections throughout the state and publishes average rates rtes by district. These rates and are an intersections are expressed t r throughout vehicles entering (MEV) the intersection. The calculated sd rate is compared to the average rate for each of the study area intersections to d etermine if crashes are significant. The MassHighway average crash rate for unsignalized intersections that there are no existing safety deficiencies at these locations. (Northampton) is 0.85, All study ersections for District 2 y area intersections do not exceed this rate and therefore it appears -3 t Not to Scale i5 s angen Brustlin, Inc. (0 x io 2006 Existing Weekday Morning Peak Hour Traffic Volumes Northampton, Massachusetts to Figure 2 sik angers Brusthn, Inc. Not to Scale LL 2006 Existing Weekday Evening Peak Hour Traffic Conditions Northampton, Massachusetts Figure 3 LO AC Janus g, 2007 100 I Intersection Sight Distance Intersection sight distance (ISD) is the view a driver has from the side street of have The desirable values for intersection sight distance are such that the rna' - rave to substantially reduce its speed when the driver exits the side street approaching traffic. ave and nt traffic would not et and into the main lfl flow o' For the site driveway, existing intersection sight distances were measured distances were determined using an estimated design speed limit of 30 mph Intersection sight distance measurements (existing and required) the field and required are ei summarized in Table 1. Ph for a residential qurred) for each direction Table 1 Sight Distance Summary Intersection Site Driveway at Evergreen Road Intersection Looking Minimumb Desiredb Measured Left from Site Driveway 200' 335' >700' Right from Site Driveway 200' 335' a 250' Based o � Highway guidelines established in A Polio on the Geometric b Required sight distance an feet, based[on speed of a ] 2004. metric Desi n of Hi hwa sand Streets, American Association of State Bas for vehicles turning left from the site drivewa , PProly 30 miles per eastbound and westbound directions Y which is more ore conservative than right turning vehicles. Looking left from the site driveway the desired sight distance is met, as a driveway can see to the intersection of Evergreen Road /Leonard Street (over the site driveway the desired sight distance does not meet the measured exiting the site distance, and is due to a vertical crest in Evergreen Road; however, ( u intersection sight 700 feet). Looking right 7f f the available intersection sight distance for an entering �SHTO 1 recommends that: appropriate stopping sight distance for the major road, then drivers have sufficient s least equal ight distance the anticipate and avoid collisions." nt s ce to Stopping sight distance (SSD) is the length of roadway ahead visible to a drivers have sufficient visibility to anticipate and avoid collisions before reaching the roadway. Upon further review of the sight distance data in Table driver and ensures that west (right) from the site driveway w is approximately aching a stationary object west for from easiriv a pproximately 250 feet and exceeds the minimum required SSD o terse en are the nhanced bou according d pp oa to Since ISD exceeds SSD, traffic operations at this distance in this direction meets the required distance for 35 MPH (250 -fee guidelines. Furthermore, the measured sight t). ' A Polio on the Geometric Desi.n of Hi hwa s Streets, American Association of State Highway and Transportation Officials [AgSHTO], 2004 11Maspringlprojects110006 .001docslmemostBeaver Brook Memorandum 1 09 07.doc and Janus' 2007 10006:, FUTURE CONDITIONS The traffic analysis presented in this memorandum has been prepared in conformance with the Executive Office of Environmental Affairs /Executive Office of Transportation EOE Institute of Transportation Engineers (ITE) guidelines ( A/EOTJ and the with these guidelines, a future design year of 2011 (a fiive -y ar hori zon) izon) was reviewed accordance assessment. as part of this Background Traffic Growth Traffic growth on area roadways is a function of the expected land development, economic activity, changes in demographics. A frequently used procedure is to estimate traffic that could be o generated by planned new major developments, y alternative procedure is to estimate an overall area anntual percentage t h increase apply that study crease a area roadways. An increase to the study area traffic volumes. For the purposes of this assessment an annual percentage growth rate was used. Based on information provided in recent traffic studies completed in the area, a background growth rate of 1.5 percent per year was applied to the existing traffic volumes and used in the future 2011 traffic analysis. Figures 4 and 5 illustrate the morning and evening 2011 No -Build traffic volumes, respective) Trip Generation y As described earlier, the proposed residential development consists of constructing 21 new single family homes and 4 new apartment units on a 54 -acre parcel. Traffic expected to be generated by this development was determined using data provided by the Institute of Transportation Engineers Trip Generation Manual, 7 Edition. The Single - Family Detached Housing and use code (LUC) 210 and Apartment LUC 220 were used to forecast traffic volumes generated by the proposed residential development; Table 2 provides a summary of this data. Table 2 Site- Generated Traffic Summa Time Period Movement Sin . le Famil Weekday Daily (vpd) 1 Total artmentsb 246 28 Il Maspringlprojects110006 .001docslmemos \Beaver Brook Memorandum 1_ 09 07.doc Weekday Evening Enter Peak Hour (vph) z 17 2 E xit 11 10 Total 27 1 11 3 30 Total 274 Weekday Morning Enter Peak Hour (vph) 2 6 6 0 E xit 18 Tot 24 2 20 2 26 1 2 Traffic volumes expressed in vehicles per day. a Traffic volumes expressed in vehicles per hour. re D l on ITE Trip Generation Rates for Single - Family Detached Housing (Land Use Code 210) with 21 u esio nits by c b Data based on ITE Trip Generation Rates for Apartments (Land Use Code 220) for 4 units by average. Sum of a and b The proposed residential development is forecasted to generate approximatelytotal vehicle trips (246 for Single Family, 28 for Apartments). Approximately 26 (6 enter, 20 exit) vehicles tri trips during the weekday morning ps and evening peak hour are expected o genera ed by therresidential development. during 9 the weekday , 11 exit) vehicle trips trip generation summarized above does not take into account residents using the adjacent Northampton bike path or the PVTA transit stop at the end of Front Street, therefore, providing a conservative analysis. -5 1. 1;:: ; anasse . angen Brusthn, Inc. T Not to Scale N :110006 . 001 graphics1FIGURES1201 ma% 2011 No -Build Weekday Morning Peak Hour Traffic Volumes Northampton, Massachusetts Figure 4 8 . hicsIFIGURES12011 No Build.dw a 2011 No -Build Weekday Evening Peak Hour Traffic Volumes Northampton, Massachusetts Figure 5 / \ January',, .07 10006.00 Trip Distribution The trip distribution for the traffic generated by the proposed facility is expected to follow existing travel patterns near the site. The anticipated trip distribution for the site - generated traffic is summarized in Table 3. Table 3 Vehicle Trip Distribution Summary Roadwa Route 9 (Haydenville Rd) Route 9 (Haydenville Rd) Florence Street Florence Street Total Based on TMC counts conducted Via Leonard Street East Center Street Front Street Front Street in December 2006 11Maspri nglprojects110006.001docslmemos \Beaver Brook Memorandum 1 09 07.doc Direction (From/To North South North South 2 Highway Capacity Manual; Transportation Research Board; Washington D.C.; 2000. Percent of Total Site - Generated Traffic Weekday Morning Weekday Evening 10% 5% 60 % 60 % 20 % 30 % 10% 5% 100% 100 % The additional traffic associated with the proposed project was distributed along the study area roadways using the trip distribution shown in Table 3. The site generated trips were then distributed and assigned to the roadways and added to the 2011 future No -Build conditions to obtain the 2011 future Build conditions with the project. These morning and evening 2011 Build conditions traffic volumes are illustrated in Figures 6 and 7, respectively. Site - generated traffic assigned to the study area intersections is also illustrated in a figure attached to this memorandum in the Trip Generation Attachment. TRAFFIC OPERATIONS ANALYSIS Level -of- Service Criteria Level -of- service (LOS) is the term used to denote the different operating conditions that occur on a given roadway segment under various traffic volume loads. It is a qualitative measure of the effect of a number of factors including roadway geometry, speed, travel delay and freedom to maneuver. Level -of- service provides an index to the operational qualities of a roadway segment or an intersection. Level -of- service designations range from A to F, with LOS A representing the best operating conditions and LOS F representing the worst operating conditions. The level -of- service designation for unsignalized intersections assumes that traffic on the major street approaches are not affected by traffic on the side streets. Thus, LOS designation is for the critical movement, which is generally the left -turn out of the side street. Level of Service Analysis VHB conducted capacity analyses using the evaluation criteria recommended in the Hi hwa Capacity Manual (HCM) to determine the traffic capacity impacts due to the proposed facility. These analyses were conducted for the weekday morning and evening peak periods during the following conditions for the study area intersections: 6 2006 Existing conditions; o 2011 Future No -Build conditions (Existing conditions with a 1.5 % growth rate); 9 2011 Future Build conditions (2011 No -Build conditions, plus the additional traffic generated by the proposed facility). The capacity analysis output for the Existing, No- Build, and Build conditions are attached to this memorandum, and are also summarized in Table 4. P: 110006.00\graphics \ FIGURES 12011 Build.dwg ( ) aiiasse 2011 Build Weekday Morning Peak Hour Traffic Conditions Northampton, Massachusetts Figure 6 P: 110006.00 \graphics \FIGURES\2011 Build.dwq angen Brusthn, Inc. anasse 2011 Build. Weekday Evening Peak Hour Traffic Volumes Northampton, Massachusetts Figure 7 January 9, 2007 10006 00 ' _ Table 4. Unsignalized Capacity Analysis Summary Time Period Critical Location (Peak Hour) Movement Florence St Weekday AM SWLR 22 9 at Front St Weekday PM SWLR Route - 9 Weekday AM EBLR 37 at East Center Weekday PM EBLR 12 Route 9 Weekday AM NELR 21 at Leonard St Weekday PM NELR 17 Evergreen Rd Weekday AM SBLRA at Site Drive Weekday PM SBLRA 2006 Existing Conditions Dem a VIC b Delay = LOS d Dem VIC Delay LOS Dem VIC Delay LOS 2 2 .02 .01 .09 .02 .06 .04 0 0 9.1 9.7 15.2 11.5 16.5 14.3 8.6 8.6 A 23 A 9 C 39 B 13 C 23 B 20 A 2 A 2 \\ Maspring \projects110006.001docs1memos \Beaver Brook Memorandum 1_09_07.doc 2011 Future No Build Conditions 2011 Future Build Condition (without project) .03 .01 .11 .02 .08 .05 0 0 9.9 9.8 16.2 11.8 17.8 15.2 8.6 8.6 • Intersection sight distance at the site driveway is adequate; A 29 A 12 C 52 B 21 C 25 C 21 A 24 A 15 (with project) .04 .02 .14 .04 .08 .06 .03 .02 • The proposed residential development will generate approximately 274 daily trips; 9.8 9.8 16.5 11.5 18.3 15.6 9.1 9.0 During the 2006 Existing and 2011 No Build conditions the crit cal approach to this intersection is the northbound Chestnut Avenue approach which is directly across from the proposed site driveway. During the 2011 Future Bu'Id condition the critical approach is the proposed site driveway. a Dem - Demand. Vehicular demand expressed in vehicles per - tour for the critical movement volume of the approach. b V/C - Volume -to- capacity ratio. V/C ratios range from 1.0 when demand equals capacity to 0 when demand is zero. Values over 1.0 indicate demand in excess of capacity. c Delay - Control delay per vehicle, expressed in seconds, includes initial deceleration delay, queue move -up time, stopped delay, and final acceleration delay. d LOS - Level of Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions. LR = Shared left right movement; SW = south /westbound; NE = north /eastbound; SB = southbound; EB = eastbound During the 2006 Existing and 2011 Future conditions with and without the project, the study area intersections operate between an acceptable level of service A arid C. As Table 4 also indicates, the levels of service remains unchanged from the 2011 Future No Build condition (without the project) to the 2011 Future Build conditions (with the project). The analysis indicates that the development will not result in any significant additional congestion along area roadways in the future. CONCLUSION In summary, it is the finding of this evaluation that the traffic generated by the proposed residential development (totaling 25 new units and 4 existing units) would not have a significant impact on traffic operations on the surrounding area roadway network. The following summarizes the findings from this memorandum: i • During the weekday morning peak hour approximately 26 vehicle trips (6 entering and 20 exiting) are expected, which is equivalent to less than one car every 2 minutes; • During the weekday evening peak hour approximately 30 vehicle trips (19 entering and 11 exiting) are expected, or approximately one car every 2 minutes; - 7 - • It is anticipated that residents could utilize the nearby Northampton bike path or PVTA transit stop at the end of Front Street, which would reduce the number of single occupancy vehicles traveling to /from this development; and A A C B C C A A January 9, 2007 10006.00 - 8 - • The Levels of Service at the three study area intersections and the proposed site driveway are expected to remain at an acceptable LOS "C" or better with the construction of the proposed residential development. Lastly, the proponent has committed to connecting this subdivision with the proposed Northampton bike path by way of a bike path connector shown on the site plan. In addition, the proponent has committed to providing funding to assist in the construct of the bike path main corridor from the connector Grove Avenue north toward the Williamsburg line. Details of this commitment are summarized in a letter to the Northampton Planning Board dated July 27, 2006. The connection of the bike path to the proposed subdivision will create opportunities for this project to generate Tess traffic to the surrounding study area intersections. 11 Masprt nglprojects110006.001docs1memos \Beaver Brook Memorandum 1_09_07.doc P:\ 09983 .00\docs\memos\Altachment.doc ➢ Crash Summary ➢ Sight Distance 9 Traffic Counts • Trip Generation ➢ Intersection Capacity Analysis • Public Transportation 8109983 .001 does lmemosWItachmenI..doc — --- - - - - -- Crash Summary Table 1 Vehicular Crash Summary (2003 - 2005) Year 2003 2004 2005 Total Average Pavement Conditions Dry Snow Ice /Slush Total MassHighway Crash Rates: District 2 Crash Rate: 0.85 Significant' Accident Summary Rt 9 ( Haydenville Rd) at Rt 9 (Haydenville Rd) at Leonard St E Center St Florence St at Front St 0 1 0 1 0 0 0 1 1 1 2 1 0.3 0.7 0.3 Collision Type Rear -end 0 1 0 Sideswipe 0 0 1 Single- vehicle crash 1 0 0 Unknown 0 1 0 Total 1 2 1 Severity property- related 1 2 1 Total 1 2 1 Time of clay Weekday, 7:00 AM - 9:00 AM 0 1 1 Weekday, 4:00 PM - 6:00 PM 0 1 0 Weekday, other time 1 0 0 Total 1 2 1 0 2 0 0 0 1 1 0 0 1 2 1 0.08 0.08 0.27 No No No Page 1 1 2 3 4 5 6 NB SB EB 566 338 16 CITY/TOWN : Northampton COUNT DATE : 12/06/06 DISTRICT : 2 UNSIGNALIZED : X SIGNALIZED : €.s- Source # INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION : VOLUMES (PM) : " K " FACTOR : TOTAL # OF ACCIDENTS : Comments: MAJOR STREET : Route 9 MINOR STREET(S) : Leonard Street CRASH RATE CALCULATION : Source (optional): MassHighway CRASH RATE WORKSHEET .08 1 MassHiijbway INTERSECTION DATA - # OF YEARS : Route 9 APPROACH ADT : Hour Volumes 3 RATE _ 11500 AVERAGE # OF ACCIDENTS ( A) : (A " 1,000,000 ) ( ADT *365) ADT = TOTAL VOL/'K" FACT. 0 RIN # 3 REF # MHD USE ONLY RIN # RIN # RIN # 3 RIN # INTERSECTION last updated: 11/06/01 1 2 3 4 5 6 NB SI3 EB 599 358 11 INTERSECTION (Label Approaches) North DIAGRAM APPROACH DIRECTION : VOLUMES (PM) : " K " FACTOR :• TOTAL # OF ACCIDENTS : MAJOR STREET : Route 9 MINOR STREET(S) : East Center Street CRASH RATE CALCULATION : 0.08 Source (optional): MassHighway Comments: 1 Massilighway CRASH RATE WORKSHEET - INTERSECTION DATA - East APPROACH ADT : # OF YEARS: mes 3 RATE — Route 9 12100 COUNT DATE : 12/06/06 CITY/TOWN : Northampton DISTRICT : 2 UNSIGNALIZED : X SIGNALIZED : AVERAGE # OF ACCIDENTS ( A ) : ( A*1,000,000 ) ( ADT *365 ) 0 pl. Source # RIN # RIN # 'M INTERSECTION ;tZli REF # ATA =5 A D T = TOTAL VOU"K" FACT. 14 MHD USE ONLY RIN # RIN # RIN # last updated: 11/06/01 1 2 3 4 5 6 NB SB WB 142 120 8 } COUNT DATE : 12/06/06 MHO USE ONLY DISTRICT : 2 UNSIGNALIZED : X SIGNALIZED : Source # CITY/TOWN : Northampton INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION : VOLUMES (PM) : " K " FACTOR : TOTAL # OF ACCIDENTS : MAJOR STREET : Florence Street RIN # MINOR STREET(S) : Front Street Ew RIN # RIN # RIN # RIN # CRASH RATE CALCULATION : Sourc( optional): MassHighway Comments: MassHiijbway CRASH RATE WORKSHEET .08 1 -- INTERSECTION DATA - Peak Hour Volumes APPROACH ADT : 3375 # OF YEARS: 0.27 3 RATE _ AVERAGE # OF ACCIDENTS (A) : (A" 1,000,000 ) (ADT' 365) ADT = TOTAL VOL/ "K" FACT. 0 INTERSECTION REF # last updated: 11/06/01 PA09983.0CAdocs\memoslAllachmeadoc Sight Distance O O N m � o (n o v u 73 u e o .N .0 cn C o o c ' in • v A Fi u hi .F v (C • o v u 67 C '3 o g , X1 r C O o P:\09983.00\docs\memoMAllachment.doc Traffic Counts Grand Total 19 Front Street From North t.sroups rru r..a cum Florence Street From East . ..,.. ..... .., .. _.- From South 0 0 Florence Street From West 0 0 Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 07:00 AM 1 0 2 0 0 11 0 0 0 0 0 0 0 32 1 0 0 47 52 07:15 AM 3 0 3 0 0 14 0 0 0 0 0 0 0 31 1 0 80 07:30 AM 8 0 7 0 2 24 0 0 0 0 0 0 0 37 2 0 0 72 07:45 AM 2 0 3 0 0 16 0 0 0 0 0 0 0 49 2 0 0 Total 14 0 15 0 2 65 0 0 0 0 0 0 0 149 6 0 251 Grand Total 19 0 30 0 12 137 0 0 0 0 0 0 1 306 10 0 0 515 Apprch % Total To 38.8 3.7 0 0 61.2 5.8 0 0 8.1 2.3 91.9 26.6 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.2 96.5 59.4 3.2 1.9 0 PCs and Peds 19 0 26 0 12 123 0 0 0 0 0 0 1 293 10 0 484 Peds 100 0 86.7 0 100 89.8 0 0 0 0 0 0 100 95.8 100 0 94 PCs and HVs and Bikes 0 0 0 0 0 5 0 0 0 0 0 0 0 8 0 0 13 Bikes 0 0 0 0 0 3.6 0 0 0 0 0 0 0 2.6 0 0 2.5 %HVs and Buses 0 0 4 0 0 9 0 0 0 0 0 0 0 5 0 0 18 Bilges 0 0 13.3 0 0 6.6 0 0 0 0 0 0 0 1.6 0 0 3.5 N / S: Front Street E / W: Florence Street City, State: Leeds, MA Client: VHB / M. Chase 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 2 0 4 0 2 0 5 0 1 0 5 0 0 0 1 0 5 0 15 0 2 10 0 0 16 0 5 23 0 3 23 0 10 72 0 Front Street Florence Street From North From East _ S tart Time Right Thru Left Peds App. Tow Right Thru Left Peds n 1 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 2 0 4 0 6 2 10 08:15 AM 2 0 5 0 7 0 16 08:30 AM 1 0 5 0 6 5 23 08:45 AM 0 0 1 0 1 3 23 Total Volume 5 0 15 0 20 10 72 % App. Total 25 0 75 0 12.2 87.8 pI- p .625 .000 .750 .000 .714 .500 .783 0 0 0 0 0 0 .000 0 12 0 16 0 28 0 26 0 82 0 .000 .732 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 From South 0 0 0 0 0 0 0 0 0 0 Thru I Left Peds Right 0 0 0 0 0 0 0 0 0 0 0 0 1 157 4 0 162 0.6 96.9 2.5 0 .000 0 0 0 0 .000 0 0 0 0 .000 File Name : AM - Front @ Florence Site Code : 02051979 Start Date : 12/6/2006 Page No : 1 0 0 0 0 .000 App. Total 0 0 0 0 .000 0 34 3 1 25 1 0 46 0 0 52 0 1 157 4 0 34 1 25 0 46 0 52 3 1 0 0 0 0 0 0 .250 .755 .333 .000 0 0 0 0 0 Florence Street From West Right I Thru 1 Left Pe 1 App. Total 37 27 46 52 .779 55 50 80 79 264 In Twill] 55 50 80 79 264 .825 Grand Total Front Street From North Front Street From North Florence Street From East 0 From South 14 0 Florence Street From West 0 Start Time Right Thru Left Peas App. Toid Right Thru Left Peds App.Toml Right Thru Left Pe App. Tout Right Thru l Left I Peds I Nary Told Grand Total 0 Front Street From North 4 0 Florence Street From East 14 0 From South 0 0 Florence Street From West 0 0 Start Ti me Right Thru Left Peds Right 0 0 0 0 Thru 2 1 2 1 Left 0 0 0 0 Peds 0 0 0 0 Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 Peds 0 0 0 0 Right 0 0 0 0 Thru 0 1 3 0 Left 0 0 0 0 Peds 0 0 0 0 Int. Total o N N N — 0 F S 07:00 AM 07:15 AM 07:30 AM 07:45 AM 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 Total 0 0 2 0 0 6 0 0 0 0 0 0 0 4 0 0 12 Grand Total 0 0 4 0 0 14 0 0 0 0 0 0 0 13 0 0 31 Apprch % 0 0 100 0 0 100 0 0 0 0 0 0 0 100 0 0 Total % 0 0 12.9 0 0 45.2 0 0 0 0 0 0 0 41.9 0 0 HVs and Bikes 0 0 0 0 0 5 0 0 0 0 0 0 0 8 0 0 13 HVs and Bikes 0 0 0 0 0 35.7 0 0 0 0 0 0 0 61.5 0 0 41.9 Buses 0 0 4 0 0 9 0 0 0 0 0 0 0 5 0 0 18 % Buses 0 0 100 0 0 64.3 0 0 0 0 0 0 0 38.5 0 0 58.1 N / S: Front Street E / W: Florence Street City, State: Leeds, MA Client: VHB / M. Chase 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total 08:00 AM 0 08:15 AM 0 08:30 AM 0 08:45 AM 0 Total Volume % App. Total PHF Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 2 0 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 2 0 0 0 0 0 5 0 3 s Printed - I - i Bikes - Buses 0 0 0 0 0 0 0 5 0 0 3 0 0 8 0 0 0 0 0 0 0 0 0 0 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 File Name : AM - Front @ Florence Site Code : 02051979 Start Date : 12/6/2006 Page No : 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 3 0 0 4 0 0 9 0 0 2 0 0 0 0 0 3 0 0 4 0 0 0 0 0 0 0 0 0 0 2 0 3 4 2 0 2 0 10 7 19 Int. Tom] 0 0 0 2 0 2 0 100 0 .000 .000 .250 .000 .250 0 8 0 100 0 0 0 0 8 .000 .400 .000 .000 .400 0 0 0 0 0 0 0 0 0 .000 .000 .000 .000 .000 0 9 0 0 0 100 0 0 .000 .563 .000 .000 .563 10 7 19 .475 L Route 9 From North From East Route 9 From South East Center Street From West S tart Time Ri ght Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 07:00 AM 0 138 0 0 0 0 0 0 0 46 1 0 12 0 0 0 197 07:15 AM 0 149 0 0 0 0 0 0 0 24 0 0 10 0 0 0 183 07:30 AM 0 181 0 0 0 0 0 0 0 70 2 0 6 0 0 0 259 07:45 AM 0 142 0 0 0 0 0 0 0 73 3 0 6 0 1 0 225 Total 0 610 0 0 0 0 0 0 0 213 6 0 34 0 1 0 864 08:00 AM 0 151 0 0 0 0 0 0 0 68 2 0 12 0 0 0 233 08:15 AM 0 178 0 0 0 0 0 0 0 70 2 0 4 0 1 0 255 08:30 AM 0 179 0 0 0 0 0 0 0 61 1 0 7 0 0 0 248 08:45 AM 0 179 0 0 0 0 0 0 0 66 2 0 8 0 2 0 257 Total 0 687 0 0 0 0 0 0 0 265 • 7 0 31 0 3 0 993 Grand Total 0 1297 0 0 0 0 0 0 0 478 13 0 65 0 4 0 1857 Apprch % Total To 0 100 0 0 0 69.8 0 • 0 0 0 0 0 0 0 0 0 0 97.4 2.6 0 0 25.7 0.7 0 94.2 0 5.8 0 3.5 0 0.2 ' 0 PCs and Peds 0 1256 0 0 0 0 0 0 0 453 12 0 65 0 4 0 1790 % PCs and Peds 0 96.8 0 0 0 0 0 0 0 94.8 92.3 0 100 0 100 0 96.4 HVs and Bikes 0 35 0 0 0 0 0 0 0 20 1 0 0 0 0 0 56 70111/s and Bikes 0 2.7 0 0 0 0 0 0 0 4.2 7.7 0 0 0 0 0 3 Buses 0 6 0 0 0 0 0 0 0 5 0 0 0 0 0 0 11 % Buses 0 0.5 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0.6 Route 9 Route 9 East Center Street From North From East From South From West Start Time Right 1 Thru I Left I Peds i App.Tuim Right 1 Thru I Left Peds I App. Total Right I Thru Left I Peas I App.ro..,i Right 1 Thru i Left I Peds I App.TmnI int. Thud Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 12 08:00 AM 0 151 0 0 151 0 0 0 0 0 0 68 2 0 70 12 0 0 0 233 08:15 AM 0 178 0 0 178 0 0 0 0 0 0 70 2 0 72 4 0 1 0 5 255 08:30 AM 0 179 0 0 179 0 0 0 0 0 0 61 1 0 62 7 0 0 0 7 248 257 08:45 AM 0 179 0 0 179 0 0 0 0 0 0 66 2 0 68 8 0 2 0 10 Total Volume 0 687 0 0 687 0 0 0 0 0 0 265 7 0 272 31 0 3 0 34 993 'b App. Total 0 100 0 0 0 0 0 0 0 9 2.6 0 9 0 8.8 0 PHF .000 .959 .000 .000 .959 .000 .000 .000 .000 .000 .000 .946 .875 .000 .944 .646 .000 .375 .000 .708 .966 N / S: Route 9 E / W: East Center Street City, State: Leeds, MA Client: VHB / M. Chase Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave: Belchertown, MA 01007 File Name : AM - Route 9 @ E. Center Site Code : 12060677 Start Date : 12/6/2006 Page No : 1 • t...] DC.......7Derlc_NVennMKeIroO- Grand Total 3 Route 9 From North From East 0 From East Route 9 From South 0 Leonard Street From West 0 Start Time Right Thru 1 Left I Peds I Atp.Tm.t Right I Thru Left I Peds npp.Tui.t Right Thru Left I Peds I npV.mtm Right Thru j Left I reds I App. Total Grand Total 3 Route 9 From North 0 0 From East 0 0 Route 9 From South 0 16 Leonard Street From West 0 0 Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds int. Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM 0 1 1 0 2 4 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4 3 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 00 tel Total 2 11 0 0 0 0 0 1 0 10 0 0 0 0 0 0 24 Grand Total 3 15 0 0 0 0 0 1 0 16 0 0 0 0 0 0 35 Apprch To 16.7 83.3 0 0 0 0 0 100 0 100 0 0 0 0 0 0 Total % 8.6 42.9 0 0 0 0 0 2.9 0 45.7 0 0 0 0 0 0 HVs and Bikes 1 13 0 0 0 0 0 1 0 13 0 0 0 0 0 0 28 % HVs and Bikes 33.3 86.7 0 0 0 0 0 100 0 81.2 0 0 0 0 0 0 80 Buses 2 2 0 0 0 0 0 0 0 3 0 0 0 0 0 0 7 % Buses 66.7 13.3 0 0 0 0 0 0 0 18.8 0 0 0 0 0 0 20 N / S: Route 9 E / W: Leonard Street City, State: Leeds, MA Client: VHB / M. Chase 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 2 0 04:15 PM 1 4 0 04:30 PM 1 3 0 04:45 PM 0 2 0 Total Volume To App. Total 0 1 0 0 1 0 0 3 1 4 0 0 0 0 0 0 2 0 5 0 4 0 2 2 11 0 0 15.4 84.6 0 0 13 .500 .688 .000 .000 .650 P.HF ( ) Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 0 0 0 0 0 0 0 0 0 - HVs and Bikes - Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 100 .000 .000 .000 .250 .250 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1 0 3 0 6 4 3 1 2 0 0 0 0 File Name Site Code Start Date Page No 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1 2 0 10 0 0 10 0 100 0 0 .000 .625 .000 .000 .625 : PM - Route 9 @ Leonard :23456789 : 12/6/2006 :1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .000 .000 .000 .00 .000 2 1 2 6 11 Int. Total 7 8 5 4 24 .750 N / S: Route 9 E / W: Leonard Street City, State: Leeds, MA Client: VHB / M. Chase ( ' Data Acquisition, Transformation & Analysis Inc. 50 Alden _Ave. __ Belchertown, MA 01007 File Name : AM - Route 9 @ Leonard Site Code : 12345678 Start Date : 12/6/2006 Page No : 1 Route 9 From North From East - - - -- Route 9 From South Leonard Street From West Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds int. Total 07:00 AM 07:15 AM 07:30 AM 07:45 AM 2 127 0 0 1 152 0 0 2 182 0 0 0 133 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 39 1 2 0 35 0 0 0 63 0 0 0 70 0 0 4 0 0 0 1 0 0 0 1 0 1 0 2 0 0 0 175 189 249 205 Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM 5 594 0 0 1 142 0 0 1 166 0 0 4 183 0 0 4 159 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 207 1 2 0 70 0 0 0 78 0 0 0 55 0 0 0 69 1 0 8 0 1 0 2 0 2 0 2 0 1 0 2 0 3 0 4 0 3 0 818 217 248 247 240 Total Grand Total Apprch % Total % 10 650 0 0 15 1244 0 0 1.2 98.8 0 0 0.8 70.3 0 0 0 0 • 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 272 1 0 0 479 2 2 0 99.2 0.4 0.4 0 27.1 0.1 0.1 10 0 9 0 18 0 10 0 64.3 0 35.7 0 1 0 0.6 0 952 1770 PCs and Peds t7 PCs and Peas 11 1208 0 0 73.3 97.1 0 0 0 0 0 0 0 0 0 0 0 455 2 0 0 95 100 0 18 0 10 0 100 0 100 0 1704 96.3 flVs and Bikes '7 FNs and Bikes 0 34 0 0 0 2.7 0 0 0 0 0 0 0 0 0 0 0 19 0 2 0 4 0 100 0 0 0 0 0 0 0 0 55 3.1 Buses % Buses 4 2 0 0 26.7 0.2 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 1 0 0 0 0 0 0 0 0 0 0 11 0.6 Start Time Peak Hour Analysis Peak Hour for 08:00 AM 08:15 AM 08:30 AM 08:45 AM Route 9 From North From East Right 17W Left Peds App. AM - Peak 1 of 1 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Route 9 From South Right Thru Left Peds App. Total 0 70 0 0 70 0 78 0 0 78 0 55 0 0 55 0 69 1 0 70 Leonard Street From West Right Tina Left Peds App. Total 2 0 2 0 4 2 0 1 0 3 2 0 3 0 5 4 0 3 0 7 Toinl 217 248 247 240 Right Thru Left Peds Am. Total From 07:00 AM to 08:45 Entire Intersection Begins at 08:00 1 142 0 0 143 1 166 0 0 167 4 183 0 0 187 4 159 0 0 163 Total Volume App. Total 10 650 0 0 660 1.5 98.5 0 0 0 0 0 0 0 0 0 0 0 0 272 1 0 273 0 99 0.4 0 10 0 9 0 19 52.6 0 47.4 0 952 PI .625 .888 .000 .000 .882 .000 .000 .000 .000 .000 .000 .872 .250 .000 .875 .625 .000 .750 .000 .679 .960 N / S: Route 9 E / W: Leonard Street City, State: Leeds, MA Client: VHB / M. Chase ( ' Data Acquisition, Transformation & Analysis Inc. 50 Alden _Ave. __ Belchertown, MA 01007 File Name : AM - Route 9 @ Leonard Site Code : 12345678 Start Date : 12/6/2006 Page No : 1 'N / S: Route 9 E / W: East Center Street City, State: Leeds, MA Client:: VHB / M. Chase Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 File Name : PM - Route 9 @ E. Center Site Code : 12060678 Start Date : 12/6/2006 Page No : 1 iz v a a uu y mca - Route 9 From North From East Route 9 From South East Center Street From West Start Ti Right T hru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM 0 4 0 0 0 3 0 0 0 3 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 3 0 0 0 1 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 6 4 4 Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM 0 11 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 22 2 1 1 5 Total Grand Total Apprch % Total 0 4 0 0 0 15 0 0 0 100 0 0 0 48.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 15 0 0 0 100 0 0 0 48.4 0 0 1 0 0 0 1 0 0 0 100 0 0 0 3.2 0 0 0 9 31 TVs and Bikes 9 }rvs and Bikes 0 14 0 0 0 93.3 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 80 0 0 1 0 0 0 100 0 0 0 27 87.1 Buses % Buses 0 1 0 0 0 6.7 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 20 0 0 0 0 0 0 0 0 0 0 4 12.9 Start Time Peak Flour Analysis Peak Hour for 04:00 PM 04:15 PM 04:30 PM 04:45 PM Route 9 From North Right Thru Left Peds Arr.Tmm From 04:00 PM to 05:45 PM Entire Intersection Begins at 04:00 0 4 0 0 4 0 3 0 0 3 0 3 0 0 3 0 1 0 0 1 From East Right Thru Left Peds A Route 9 From South East Center Street From West Right Thru Left Peds Arr.Tm_.I I Thru 1 Left Peds I Arrro�ot I,L Total - Peak 1 of 1 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 4 0 3 0 0 3 0 1 0 0 1 0 3 0 0 3 —Right 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 6 4 4 Total Volume 7 App. Total 0 11 0 0 11 0 100 0 0 0 0 0 0 0 0 0 0 0 0 11 0 0 11 0 100 0 0 0 0 0 0 0 0 0 0 0 22 PI-IF .000 .688 .000 .000 .688 .000 .000 .000 .000 .000 .000 .688 .000 .000 .688 .000 .000 .000 .000 .000 .688 'N / S: Route 9 E / W: East Center Street City, State: Leeds, MA Client:: VHB / M. Chase Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 File Name : PM - Route 9 @ E. Center Site Code : 12060678 Start Date : 12/6/2006 Page No : 1 iz v a a uu y mca - Grand Total Front Street From North Front Street From North Florence Street From East r1 MIMI a t.J auui a,.o Florence Street From East From South ....... _ ---- From South Florence Street From West 0 Start Time Right Thru Left Peds App. Told Right Thru Left Peds App. Tom! Right Thru Left Peds App.To.1 Right Thru Left Peds AppTnml Grand Total 9 Front Street From North brULLtJS r1 MIMI a t.J auui a,.o Florence Street From East ..... ..... ....... ....... _ ---- From South 0 0 Florence Street From West 0 0 Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 57 04:00 PM 2 0 0 0 4 25 0 0 0 0 0 0 0 23 3 0 60 04:15 PM 1 0 1 0 0 38 0 0 0 0 0 0 0 20 0 0 60 04:30 PM 1 0 1 0 1 27 0 0 0 0 0 0 0 26 4 0 0 78 04:45 PM 1 0 1 0 2 40 0 0 0 0 0 0 0 29 5 0 0 Total 5 0 3 0 7 130 0 0 0 0 0 0 0 98 12 0 255 Grand Total 9 0 7 0 7 248 0 0 0 0 0 0 0 206 25 10.8 0 0 502 Apprch To Total To 56.2 1.8 0 0 43.8 1.4 0 0 2.7 1.4 97.3 49.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 89.2 41 5 0 PCs and Peds 8 0 5 0 7 246 0 0 0 0 0 0 0 202 25 0 493 % PCs Peds 88.9 0 71.4 0 100 99.2 0 0 0 0 0 0 0 98.1 100 0 98.2 and HVs and Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0.2 Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5 0 7 IIVs and Buses 1 0 2 0 0 2 0 0 0 0 0 0 0 3 0 0 8 Buses 11.1 0 28.6 0 0 0.8 0 0 0 0 0 0 0 1.5 0 0 1.6 N / S: Front Street E / W: Florence Street City, State: Leeds, MA Client: VHB / M. Chase 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total 04:15 PM 1 04:30 PM 1 04:45 PM 1 05:00 PM 1 Total Volume % App. Total PHF 1 0 1 0 1 0 1 0 4 0 Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 Name : PM - Front @ Florence 1 0 0 0 3 0 0 0 4 0 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 o Peak Hour for Entire Intersection Begins at 04:15 PM 0 1 .0 2 0 38 0 0 1 0 2 1 27 0 0 1 0 2 40 0 0 1 0 2 0 34 0 2 0 0 0 0 0 34 25 26 33 118 0 0 0 0 0 0 0 0 0 38 28 42 34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 File Site Code : 05161961 Start Date : 12/6/2006 Page No : 1 0 0 0 0 0 0 0 0 0 0 0 28 8 0 28 1 0 31 2 0 21 2 0 108 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0 26 0 29 0 28 4 5 8 0 0 0 0 0 20 30 34 36 4 0 4 50 0 50 0 0 8 1.000 .000 Loot) .000 1.000 3 139 0 0 142 2.1 97 0 0 .375 .869 .000 .000 .845 0 0 0 0 0 0 0 0 0 .000 .000 .000 .000 .000 0 103 17 0 120 0 85.8 14.2 0 .000 .888 .531 .000 .833 72 55 63 57 247 60 60 78 72 270 .865 Grand Total Front Street From North Florence Street From East • From South Florence Street From West Start Time Right I Thru 1 Left I Peds I App.T I Right I Thru 1 Left I Peds I App.Toint Right I Thru 1 :Left I Peds I App. Teal Right 1 Thru I Left I Ped App Tmol Grand Total 1 Front Street From North 2 0 Florence Street From East 2 0 From South 0 0 Florence Street From West 0 0 Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Tluu Left Peds Int. Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 - N -, Total 1 0 1 0 0 1 0 0 0 0 0 0 0 1 0 0 4 Grand Total 1 0 2 0 0 2 0 0 0 0 0 0 0 4 0 0 9 Apprch To 33.3 0 66.7 0 0 100 0 0 0 0 0 0 0 100 0 0 Total % 11.1 0 22.2 0 0 22.2 0 0 0 0 0 0 0 44.4 0 0 HVs and Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 7 FIVs and Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 25 0 0 11.1 Buses 1 0 2 0 0 2 0 0 0 0 0 0 0 3 0 0 8 Buses 100 0 100 0 0 100 0 0 0 0 0 0 0 75 0 0 88.9 N / S: Front Street E / W: Florence Street City, State: Leeds, MA Client: VHB / M. Chase 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM 0 0 1 0 1 0 0 04:30 PM 1 0 0 0 1 0 0 04:45 PM 0 0 0 0 0 0 1 05:00 PM 0 0 0 0 0 0 1 Total Volume 1 0 1 0 2 t% App. Total 50 0 50 0 PH:F .250 .000 .250 .000 .500 0 2 0 100 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 2 0 .000 .500 .000 .000 .500 Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave: Belchertown, MA 01007 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .000 .000 .000 .000 .000 File Name PM - Front @ Florence Site Code : 05161961 Start Date : 12/6/2006 Page No : 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 1 0 0 0 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 1 0 100 0 0 .000 .250 .000 .000 .250 Int. Totnl 1 2 5 .625 0 3 1 5 Grand Total 2 Route 9 From North 0 0 From East 0 0 Route 9 From South • 0 East Center Street From West 53 0 Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 04:00 PM 1 86 0 0 0 0 0 0 0 125 6 0 1 0 0 0 219 04:15 PM 0 84 0 0 0 0 0 0 0 148 5 0 3 0 0 0 240 04:30 PM 0 78 0 0 0 0 0 0 0 133 3 0 3 0 0 0 217 04:45 PM 0 102 0 0 0 0 0 0 0 128 10 0 2 0 1 0 243 Total 1 350 0 0 0 0 0 0 0 534 24 0 9 0 1 0 919 Grand Total 2 689 0 0 0 0 0 0 • 0 1131 53 0 33 0 2 0 1910 Apprch % Total % 0.3 0.1 99.7 36.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 95.5 59.2 4.5 2.8 0 0 94.3 1.7 0 0 5.7 0.1 0 0 PCs and Peds 2 674 0 0 0 0 0 0 0 1116 53 0 32 0 2 0 1879 7 PCs and Peds 100 97.8 0 0 0 0 0 0 0 98.7 100 0 97 0 100 0 98.4 HVs and Bikes 0 14 0 0 0 0 0 0 0 12 0 0 1 0 0 0 27 %1-1Vs and Bikes 0 2 0 0 0 0 0 0 0 1.1 0 0 3 0 0 0 1.4 Bases 0 1 0 0 0 0 0 0 0 3 0 0 0 0 0 0 4 % Roses 0 0.1 0 0 0 0 0 0 0 0.3 0 0 0 0 0 0 0.2 N / S: Route 9 E / W: East Center Street City, State: Leeds, MA Client: VHB / M. Chase 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total I 1 Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave: Belchertown, MA 01007 File Name : PM - Route 9 @ E. Center Site Code : 12060678 Start Date : 12/6/2006 Page No : 1 0 94 0 0 1 84 0 0 0 83 0 0 0 78 0 0 1 339 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Route 9 From North Start Time Right Thru i Peds App. Tole' Right Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 0 102 0 0 102 0 0 05:00 PM 0 94 0 0 94 0 0 05:15 PM 1 84 0 0 85 0 0 05:30 PM 0 83 0 0 83 0 0 Totnl Volume 1 363 0 0 364 0 0 % App. Total 0.3 99.7 0 0 0 0 PHF .250 .890 .000 .000 .892 .000 .000 From East Peds App. Total Right Peds 0 0 0 0 0 0 0 0 0 0 0 0 .000 .000 0 0 0 0 0 .000 0 165 7 0 0 155 5 0 0 146 9 0 0 131 8 0 0 597 29 0 Thru Route 9 From South Peds App. Told 0 128 1 0 138 0 165 7 0 172 0 155 5 0 160 0 146 9 0 155 Right 2 0 0 0 8 0 0 0 4 0 0 0 10 0 1 0 24 0 1 0 East Center Street From West ®EM 2 0 1 2 0 0 8 0 0 4 0 0 0 0 0 0 App. Tom! 3 2 8 4 268 253 242 228 991 Int. Totnl 243 268 253 242 1006 0 594 31 0 625 0 95 5 0 .000 .900 .775 .000 .908 94.1 16 0 1 0 17 0 5.9 0 .500 .000 .250 .000 .531 .938 Grand Total 8 Route 9 From North 0 0 From East 0 0 Route 9 From South 0 1088 Leonard Street From West 0 15 Start Time Right Tim' Left Peds Right Thru Left Peds Right Tluu Left Peds Right Thru Left Peds Int. Total 04:00 PM 1 86 0 0 0 0 0 1 0 118 1 0 1 0 0 0 208 04:15 PM 2 81 0 0 0 0 0 0 0 158 3 0 1 0 1 0 246 04:30 PM 1 76 0 0 0 0 0 0 0 130 0 0 2 0 1 0 210 04:45 PM 0 102 0 0 0 0 0 0 0 119 3 0 2 0 2 0 228 Total 4 345 0 0 0 0 0 1 0 525 7 0 6 0 4 0 892 Grand Total 8 649 0 0 0 0 0 1 0 1088 14 0 15 0 12 0 1787 Apprch % Total % 1.2 0.4 98.8 36.3 0 0 0 0 0 0 0 0 0 0 100 0.1 0 0 98.7 60.9 1.3 0.8 0 0 55.6 0.8 0 0 44.4 0.7 0 0 PCs and Peds 5 634 0 0 0 0 0 0 0 1072 14 0 15 0 12 0 1752 % PCs and Peds 62.5 97.7 0 0 0 0 0 0 0 98.5 100 0 100 0 100 0 98 HVs and Bikes 1 13 0 0 0 0 0 1 0 13 0 0 0 0 0 0 28 HVs and Bikes 12.5 2 0 0 0 0 0 100 0 1.2 0 0 0 0 0 0 1.6 Buses 2 2 0 0 0 0 0 0 0 3 0 0 0 0 0 0 7 Buses 25 0.3 0 0 0 0 0 0 0 0.3 0 0 0 0 0 0 0.4 N / S: Route 9 E / W: Leonard Street City, State: Leeds, MA Client: VHB / M. Chase 05:00 PM. 05:15 PM 05:30 PM 05:45 PM Total Start Time Right 1 Thru l Left I 04:15 PM 04:30 PM 04:45 PM 05:00 PM Totol Volume t App. Total PHF 0 2 4 76 80 74 74 304 / / Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Route 9 From North From East Peds A„ Toial Right I Then I Left I Peds I Apr Told Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 2 81 0 0 83 0 0 0 0 0 1 76 0 0 77 0 0 0 0 0 0 102 0 0 102 0 0 0 0 0 0 76 0 0 76 0 0 0 0 0 3 335 0 0 338 0.9 99 0 0 .375 .821 .000 .000 .828 0 0 0 0 0 0 0 0 0 0 0 158 0 130 0 119 0 156 156 147 141 119 563 File Name Site Code Start Date Page No 3 0 1 0 2 0 1 0 7 0 Route 9 From South Right I Thru I Left I Peds I n 3 0 0 0 3 0 3 0 i 161 130 122 159 PM - Route 9 @ Leonard :23456789 : 12/6/2006 :1 4 0 2 0 1 0 2 0 9 0 3 1 2 2 8 Leonard Street From West 1 0 1 2 0 1 2 0 4 0 2 3 0 0 0 0 0 0 0 0 0 2 3 4 7 242 232 221 200 895 Right Thru Left Peds App. Twat IoLToml 246 210 228 242 926 0 0 0 0 0 0 0 0 0 .000 .000 .000 .000 .000 0 563 9 0 572 0 98.4 1.6 0 .000 .891 .750 .000 .888 56.2 9 0 7 0 43.8 0 16 0 .563 .000 .583 .000 .571 .941 N /S: Route 9 E / W: Leonard Street City, State: Leeds, MA Client: VHB / M. Chase Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 File Name : AM - Route 9 @ Leonard Site Code : 12345678 Start Date : 12/6/2006 Page No : 1 Route 9 From North From East Route 9 From South Leonard Street From West Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 07:00 AM 07:1.5 AM 07:30 AM 07:45 AM 0 5 0 0 0 6 0 0 2 6 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 2 0 3 0 0 0 7 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 9 15 8 Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM 2 20 0 0 0 2 0 0 0 3 0 0 2 7 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0 2 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 44 2 6 10 4 Total Grand Total Apprch % Total % 2 16 0 0 4 36 0 0 10 90 0 0 6.1 54.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 24 0 2 0 92.3 0 7.7 0 36.4 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22 66 HVs and Bikes To HVs and Bikes 0 34 0 0 0 94.4 0 0 0 0 0 0 0 0 0 0 0 19 0 2 0 79.2 0 100 0 0 0 0 0 0 0 0 55 83.3 Buses % Buses 4 2 0 0 100 5.6 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 20.8 0 0 0 0 0 0 0 0 0 0 11 16.7 Route 9 From North From East Route 9 From South Leonard Street From West Start Time Peak Hour A Peak Hour for 07:00 AM 07:15 AM 07:30 AM 07:45 AM Right I Thru I Left I Peds 1 Ammo mlysis From 07:00 AM to 08:45 Entire Intersection Begins at 07:00 0 5 0 0 5 0 6 0 0 6 2 6 0 0 8 0 3 0 0 3 Right I Thru 1 Left I Peds I App Toim AM - Peak 1 of 1 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Right I Thru I Left I Peds I Arp rI 0 5 0 2 7 0 3 0 0 3 0 7 0 0 7 0 5 0 0 5 Right I Thru I Left I Peds i App.Tuim 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Int. Totnt 12 9 15 8 Total Volurne %n App. Total 2 20 0 0 22 9.1 90.9 0 0 0 0 0 0 0 0 0 0 0 0 20 0 2 22 0 9 0 9.1 0 0 0 0 0 0 0 . 0 0 44 NT .250 .833 .000 .000 .688 .000 .000 .000 .000 .000 .000 .714 .000 .250 .786 .000 .000 .000 .000 .000 .733 N /S: Route 9 E / W: Leonard Street City, State: Leeds, MA Client: VHB / M. Chase Data Acquisition, Transformation & Analysis Inc. 50 Alden Ave. Belchertown, MA 01007 File Name : AM - Route 9 @ Leonard Site Code : 12345678 Start Date : 12/6/2006 Page No : 1 Grand Total 0 Route 9 From North 0 0 From East 0 0 Route 9 From South 0 East Center Street From West 1 0 Start Time Right I Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total 07:00 AM 0 7 0 0 0 0 0 0 0 8 0 0 0 0 0 0 15 07:15 AM 0 6 0 0 0 0 0 0 0 2 0 0 0 0 0 0 8 07:30 AM 0 6 0 0 0 0 0 0 0 6 0 0 0 0 0 0 12 07:45 AM 0 6 0 0 0 0 0 0 0 5 0 0 0 0 0 0 11 Total 0 25 0 0 0 0 0 0 0 21 0 0 0 0 0 0 46 Grand Total 0 41 0 0 0 0 0 0 0 25 1 0 0 0 0 0 67 Apprch % 0 100 0 0 0 0 0 0 0 96.2 3.8 0 0 0 0 0 Total % 0 61.2 0 0 0 0 0 0 0 37.3 1.5 0 0 0 0 0 I -IVs and Bikes 0 35 0 0 0 0 0 0 0 20 1 0 0 0 0 0 56 Y HVs and Bikes 0 85.4 0 0 0 0 0 0 0 80 100 0 0 0 0 0 83.6 Buses 0 6 0 0 0 0 0 0 0 5 0 0 0 0 0 0 11 % Buses 0 14.6 0 0 0 0 0 0 0 20 0 0 0 0 0 0 16.4 N / S: Route 9 E / W: East Center Street City, State: Leeds, MA Client: VHB / M. Chase 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total DataAcquisition, Tr- ansfor-mation -& Analysis In 0 3 0 0 0 2 0 0 0 6 0 0 0 5 0 0 0 16 0 0 Route 9 From North From East 50 Alden Ave. Belchertown, MA 01007 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Route 9 From South Start Time Right I Thru I Left I Peds Arr.Tot.i Right 1 Thru Left I Peds I Arp.romI Right Thru I Left I Peds I Arr.Toi.l Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM 0 7 0 0 7 0 0 0 0 0 0 8 0 0 8 07:15 AM 0 6 0 0 6 0 0 0 0 0 0 2 0 0 2 07:30 AM 0 6 0 0 6 0 0 0 0 0 0 6 0 0 6 07:45 AM 0 6 0 0 6 0 0 0 0 0 0 5 0 0 5 Total Volume 0 25 0 0 25 0 0 0 0 0 0 21 0 0 21 To App. Total 0 100 0 0 0 0 0 0 0 100 0 0 P1-11 .000 .893 .000 .000 .893 .000 .000 .000 .000 .000 .000 .656 .000 .000 .656 0 0 0 File Name : AM - Route 9 @ E. Center Site Code : 12060677 Start Date : 12/6/2006 Page No : 1 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 0 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 5 7 6 21 East Center Street From West Right I Thru I Left I Peds I Arr.rm.t Int. Tntnl 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .000 .000 .000 .000 .000 0 0 0 0 15 8 12 11 46 .767 11181Plant. 181INEMINIUMMIE PA09983.00\docs memos\Allachmeadoc P: 110006.00 \graphics \ FIGURES \Site Generated Traffic.dwq Not to Scale 0 cri co - k- 1 ( 2 ) N 4-0 Evergreen Rd Site Generated Traffic AM (PM) Northampton, Massachusetts AM PM Enter 6 Enter 19 Exit 20 Exit 11 Total 26 Total 30 �anasse ITE TRIP GENERATION WORKSHEET (7th Edition, Updated January 2004) LANDUSE: Single - Family Detached Housing LANDUSE CODE: 210 JOB NAME: JOB NUMBER: Independent Variable - -- Number of Units WEEKDAY UNITS ( #): 21 Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies RA2 Average Low High Average Low High Enter Exit DAILY 350 0.96 9.57 4.31 21.85 197 2 2,900 50% 50% AM PEAK (ADJACENT ST) 274 0.89 0.75 0.33 2.27 201 2 2,900 25% 75% PM PEAK (ADJACENT ST) 302 0.91 1.01 0.42 2.98 214 2 2,900 63% 37% TRIPS: TRIPS: TRIPS: DAILY AM PEAK (ADJACENT ST) PM PEAK (ADJACENT ST) DAILY PEAK OF GENERATOR DAILY PEAK OF GENERATOR BY AVERAGE Total Enter Exit 201 100. 100. 16 4 12' 21 13 . 8 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies RA2 Average Low High Average Low High Enter Exit DAILY 73 0'.93 10.10 5.32 15.25 214 15 1,000 50% 50% PEAK OF GENERATOR 52 0.90 0.94 0.50 1.75 220 15 675 54% 46% BY AVERAGE Total Enter Exit 212.' 106 106 20 1i.. 9 SUNDAY RATES: Total Trip Ends # Studies RA2 Average Low High DAILY 69 0.94 8.78 4.74 12.31 PEAK OF GENERATOR 51 0.88 0.86 0.55 1.48 BY AVERAGE Total Enter Exit • 184 . 92 92 1.8,. 10 8 BY REGRESSION Total Enter Exit 247 ' 124.. 24 6 26 17 BY REGRESSION Total Enter Exit 243 121 30 .16 . Independent Variable Range Average Low High 218 15 1,000 217 15 675 BY REGRESSION Total Enter Exit 176 88 23 12 P: \10006.00 \ssheets \Trip Gen \Trip Gen 210 - Single Fam Single Family Housing - 210 1/4/2007 Directional Distribution Enter Exit 50% 50% 53% 47% ITE TRIP GENERATION WORKSHEET (7th Edition, Updated January 2004) TRIPS: TRIPS: RATES: TRIPS: LANDUSE: Apartment LANDUSE CODE: 220 JOB NAME: JOB NUMBER: DAILY AM PEAK (ADJACENT ST) PM PEAK (ADJACENT ST) DAILY PEAK OF GENERATOR # Studies RA2 DAILY 14 0.82 PEAK OF GENERATOR 13 -- DAILY PEAK OF GENERATOR Independent Variable - -- Number of Units WEEKDAY UNITS ( #): 4 Directional RATES: Total Trip Ends Independent Variable Range Distribution # Studies RA2 Average Low High Average Low High Enter Exit DAILY 86 0.88 6.72 2.00 12.50 212 0 1000 50% 50% AM PEAK (ADJACENT ST) 78 0.83 0.51 0.10 1.02 235 0 1100 20% 80% PM PEAK (ADJACENT ST) 90 0.77 0.62 0.10 1.64 233 0 1100 65% 35% BY AVERAGE Total Enter Exit 27: .. 13 13 2. 0 2 2 1 BY AVERAGE Total Enter Exit 26 • 13 13 2: NA NA BY AVERAGE Total Enter Exit 23 12 12 2. NA NA BY REGRESSION Total Enter Exit SATURDAY RATES: Total Trip Ends Independent Variable Range # Studies R ^2 Average Low High Average Low High DAILY 15 0.85 6.39 2.84 8.40 175 65 360 PEAK OF GENERATOR 14 0.56 0.52 0.26 1.05 178 65 360 BY REGRESSION Total Enter Exit -225 112. 1 21 NA :.. NA SUNDAY Total Trip Ends Independent Variable Range Average Low High Average Low High 5.86 3.21 7.53 182 90 360 0.51 0.26 1.43 186 90 380 BY REGRESSION Total Enter Exit -75 ` -38 -38 NA NA ::: NA . Directional Distribution Enter Exit 50% 50% Peak Distribution Not Availble Directional Distribution Enter Exit 50% 50% Peak Distribution Not Availble P: \10006.00 \ssheets \Trip Gen \Trip Gen 220 = Apt 4 units Apartment - 220 1/4/2007 PAO9g133.001does\ memooWtachmentsloc • Intersection Capacity AnalySis HCM Unsignalized Intersection Analysis 12: Florence & Front Lane Configurations Sign ControP Grade Volume.(veh Peak Hour Factor Hourly flow rate4(vp Pedestrians Lane Width ft' Walking Speed (ft/s) ercentBlocka Right turn flare edian type;. Median storage veh Upstream signal (I pX, platoon unblocked cohflicting volume' vCi , stage 1 conf vol stage 2 conf vol u, unblocked vol P: \10006.00 \graphics \BASES\2006 AM.sy7 vhb, inc. 1700 1506 898 p0 queue free % cM ca ac p 1, Di acid Wgn V Volume Left olume,Ri cSH Volume to Capaci Queue Length 95th (ft) ontrol Delay` Lane LOS pproach Delay Approach LOS A ;(manse tion Summary ' :.': Fra.,�` WA M TNS Average Delay 0.8 )004 CapWO: y Uti att Analysis Period (min 2006 Existing AM Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 15: Ever • reen & Site Dr 'erne tlififie Lane Configurations Sign Control t Grade Volume (vehl Peak Hour Factor Hourly flow r Pedestrians Lane W idth ( Walking Speed (ft/s) Percent B.lockaq " A Right turn flare Median storage veh Upstream signaL(fi pX, platoon unblocked vC, conflictmg;volume.; vC1, stage 1 conf vol vC2, s t a ge, 2 c& vCu, unblocked vol 0% 0% 0% 0 r 3.-c� 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 .92 -r. ..... y... .. (. .... i.;�,. 0 ... 2`Y`r'Rt p0 queue free % cM :cpacity ('e Orgarci 0, WM Volume Left olume> cSH Volume to Cap _.,. Queue Length 95th (ft) ontrol Delay:i Lane LO S s) roach'i T Approach LOS ante seo oro Average Delay I nter'sectiom Capaci Analysis Period (min a&F #il 15 P: \10006.00 \graphics \BASES\2011 B PM.sy7 vhb, inc. 6.1 ervi 100 1611 1607 939 911 100 100 99 99 100 99 7 5 838 1069' 905 f 840 53 47 12 y 63 45 tcf 2011 Build PM ta, 100 Synchro 6 Report Page 1 HCM Unsignalized - Intersection- Capacity Analysis 5: Ha denville Rd Rt 9 & Leonard en , 61 1q;7 Lane Configurations Sigrr Contro Grade Volume veh /l Peak Hour Factor Hourly flow rate (v Pedestrians Lane W dth (l Walking Speed (ft/s) Percent Blocka, Right turn flare (veh Median typE Median storage veh Upstream signal pX, platoon unblocked VC, confl ct ig,volume vC1, stage 1 conf vol e 2 con u, unblocked vol 717 • vC2,{ s1 v p0 queue free % cM capacity (ve..l` Ol Volume Left plume R;i cSH '6166 67, Queue Length 95th (ft) Control Delay (s;) Lane LOS Approach uelay Approach LOS BIN Efir Average Delay Intersection Capacity Analysis Period (min I 1 P: \10006.00 \graphics \BASES\2006 AM.sy7 vhb, inc. 0.3 2006 Existing AM tO single =(s). tC, 2 stage (s) ree r , r, .� 0% 0% 0% 2.2 s a 100 884 1700 333 1010 712 Yir izati Synchro 6 Report Page 1 UDSign 2011 Build P�� ��K�'������ 3: E Center & Ha denville Rt 9 Lane Configurations 4 i+ Speed Peak Hour Factor Walking hight turn flare (veh) Median storage veh) • pX, platoon unblocked vUu, 99 97 96 p0 queue free %, 0% 0% 0% 0.92 -_ 0.92 olume L cSH 571 1140 1700 Queue Length 95th (ft) 3 Lane LO8 Approach LOS PjJ00OG.00\oreph�a\BASES\2O11 8pM�y7 vhb, inc. /_\ • --'---------------- ---- 0.8 Average Analysis Period (min) 15 Synchro 6 Report Page 1 HCM- Unsignalized_Intersection Capacity Analysis 2006 Existing PM 12: Florence & Front Mo.ee `ti , r Lane Configurations $166 ::(6,n Grade Volume1(veh /f Peak Hour Factor burly flow r`ate Wp Pedestrians Lane Width (f Walking Speed (ft /s) Percent Blockage; Right turn flare M.e'dian typ Median storage veh Upstream signal pX, platoon unblocked conflicting volu vC1 stage 1 conf vol v02, stagd 2 conf v vCu, unblocked vol sm le tC, 2 stage p0 queue free 44,:,07407,4610F* r ir k ection olumE Volume; cSH " " -..... Volume -to C apaci Queue Length 95th (ft) Onto l D Lane LOS Approach Delay Approach LOS i£ei MMITI Average Delay Intersection Capacity: Analysis Period (min) r 0.8 P: \10006.00 \graphics \BASES\2006 PM.sy7 vhb, inc. gaiElagaWn IV'S e, f'F -'G.tY 1700 1426 773 .4152031;:wTRZIM VAT,' Synchro 6 Report Page 1 HCM-Unsignalized-Intersection_Capacity_Analysis 15: Evergreen & Site Dr Rafatlig'INATII-Ir livg, „.,_TstLAM'MgfoaraTt9T3ME5TMSEBSTAMM. Lane Configurations ,, . . , 4 4) 4) Sign Off ; _ : : if 06 00 :OM IF i:E .';'.. ?...,' :',.;',, .. .',' , i. , :-,.:Kg;g. , Fc-Nx - ; , wf - !::c . fx:* , p6 ,, e-Ni; , :.; . -:iw:: , ;gi:q.:: . .g.;;F...m.::; , :v:ylgikyi gfsoR,rt gf613g. Afill'Affilftl , ,,-,,,6:,:. , ,, , : , :;,T, , ,.:0,:„F;; , ., , .„4:-_„. , :„ , ,:;- ,,,,, :i-.:, , ,:, , ,K ,, ,...t ,,, y ,,, , , ,..,.,:;..,,,,,,, Grade 0% 0% 0% 0% „•,,,,,,„-,,,,,",, At 01Wme;:Lkvenin).4-1..T.-,Y,..,z?,i.,,,,3..v).11,1&:?.s,',-4,:v.,•-,;"--.1,,w,,:,;;..*::',41,-?.;:f.:,.,:,ii:.:1•;.;',.•1:.':.:•...:(-:],,,::",it,i3I•,•,•,-.5.;f:g4714•.,.;.,,;:,,,,•,.,-,:.;,-.. •,',,,`,,,,;,..L',4-.4,4.,,,I.,-.4.4i• .4,4.,-,.,4.-,s....,..,••,..,..,4,4,..:' .,.::■■''.,:'::-1.!:ga'.....4i.:.,:'','':..4.':!:-%:'••,..2,7.i'r:;"•''',::.•,,:,19.;:k',ZV•f:3',%,:••'"F:,V•.::',,,i,..,,,,;,1'14,..:',$'..11n1,;i1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 _. Ourly4ow : 2 1,' .,.,, •,-.,,: '.-2,,,,, . --,,,,,,,::',. 2,-,.. ,.<.<1:-: , ,,,,,,,..,,,,....21....--..,,,,,,,:.,,, ... Pedestrians r ,- .z .,. vx ? yu , ;f , :c n-, , ta;;,,,y: : :.::.;RT'A,!,r:::::;,-r,7:v.,..;::e.,EiT!:,'t:::x:;;e.,.=:! : :!nl. : W:::viy;K:w.a5:u::-:;'i:.`";Za'rs7:Egc - :::TY5'Zf=,:::'=',RT , iZ::'::WZRTFE:;;;L.giF;igr';;5VaaTZV:;..Fg';i7P' , .a!V-5.ifj.a . rg.g'gf2 E:',1?,'Y.:.ff!WY.A!*.igf-gen4::',Viiingt Walking Speed (ft/s) ---,r.,,;,,,c,;,..:-..w . ,, I ,,;., • -• A , g ;;-Y-J:-: ; :;•.•:- 7 ,7:g. „ ercenv bilocKaoe,t, ,-,0 Right turn flare (veh) Preagii - Median storage veh) Upstre.m pX, platoon unblocked l'•: vci, stage 1 conf vol Volume Left Lane LOS FEBi 151AllierTMane Queue Length 95th (ft) 0 s P:\10006.00\graphics\BASES\2011 B AM.sy7 vhb, inc. '4 4r 4k '" 41 \ 1 / \* I/ • 7,irmugget 2011 Build AM V • , . 4 • r• - _ . , . ,• vCu, unblocked vol 13 12 67 53 12 66 53 12 fitiggtjanieitgkgritilgaitigiggigalfiNagagak tU, 2 stage (s) p0 queue free cY0 100 :74:r:' 99 100 100 99 100 98 99 12 VdrikfigFIrdliTiv'ANgEtrawi- cSH 1605 1607 1007 A . ,k- - ,•,W•y..; , ,;.i , t , 0• , . , 7 - 27. • <• ,, , , ;• , ..6: •,, W kli. i: ...•:=M?"'"' ,,,,,,:,•-zr,111,-,Y,11,,,,,,,ilvv.,,,,,F.,,,,,,,,,,,,,,,r,,,,,,,i,D.,,,,,,,,,,,,,,,,,,,,,,,,,,.• • •••••-•,,,--,,,,-,--,,,, -,- - -,,,---. , - ' , rdaC171,DO I ayASY,,,441:0.!,,Alit,3 .,c : , g,..::;';:::6 • : ,, W , ' , Aq'r , 3* :' -=" ( iV-" I ' 4 .• :,i ' t i: ';','. • ': 4' 1'Z I P4',:-•-t,i:i",,,,, p ,F.Sjiali.,Ve., g i;RVOSi.;.MI',70Ril ,i-,,,•,,,,;,.,, ..:,•,• .•,. • ::,?1,-YL'fka'..W,;',WI:a.,t51:;,A:ai-ifiAT..7i:',N•thNil-G'VEn-rcr-t-i,VIV,Ph-,:q••4t:1,VV:'11!'''''''''''',1 Approach LOS A A NifireareleasTeirgifittgly ',.,,:!. 21CiF fwarMitIRTMERKAVENif im .,„ Average Delay 5.8 -,t,-.7,...,.,,,,::,—,-„:;:,,,,:- 13 — 0, „,,,,,,,, .,.. ,,,,, IntersectionLCapacitNRutilizationwmler,d2-::7:vo..-.. ,e,, rrVick,qt, ,,,,, q , v4FN ,,,, YPv4 , - w , 41 - mw , zif , 4 q Analysis Period (min) 15 Synchro 6 Report Page 1 HCM- Unsignalized - Intersection- Capacity Analysis 2006 Existing PM 5: Haydenville (RI 9) & Leonard Lane Configurations Sign Control „'; Grade Volume ( Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 H ourly flow rate Pedestrians Lane Width (ft) Walking Speed (ft/s) P -r Right turn flare edian. Median storage veh .000:00: ft pX, platoon unloced vC, conflicting uolume` vC1, stage 1 conf vol vc2, sage 2corifYv0 vC u, unblocked vol 370 single (s` tC, 2 stage (s) VoIL ne- Volume Left 44 0.4F Ric p0 queue free cM capacity (veh IFfdEar cSH Volume to C Queue Length 9 (ft) Control pelay:ts) : tf Lane LOS Approach Delay'(s)` Approach LOS InreIsac i,iri Average Delay Intersio n Ca Analysis Period �xrz�r tt aryy9:� t 10 P: \10006.00 \graphics \BASES\2006 PM.sy7 vhb, inc. 0.4 998 367 99 1189 1700 406 Oa i r�x �' 11 a7 E'9 � 3j Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 3: E Center & Haydenville (Rt 9) �n Move Lane Configurations Sign Contri Grade Volume'(ye Peak Hour Factor bur owrate (v Pedestrians Lane WidtW(ft) Walking Speed (ft /s) Percent Blocka m. Right turn flare (veh e Median storage veh Upstream signal' pX, platoon unblocked conflictmg volu vC1, stage 1 conf vol vC2, stage 2 `con vCu, unblocked vol t 0.92 0.92 0.92 0.92 0.92 0.92 {i 2011 Build AM o[un%E_ Volume Left olume:' cSH p0 queue free % capacity (ve Dil�ecion \/olurnea`o Capacity _ Queue Length 95th (ft) 12 c ont rol belay (s )� ,.,.r Lane LOS Approach Delay Approach LOS stiff use liop irninary 'L � nE w. Average Delay Intersection Capacitj Analysis Period (min 1138 804 804 99 87 99 366 820 1700 0.9 P: \10006.00 \graphics \BASES\2011 B AM.sy7 vhb, inc. 15 ervi 311 ;AMU f.- • Synchro 6 Report Page 1 HCM Unsignalized- Intersection- Capacity - Analysis 2011 NoBuild AM 12: Florence & Front i MoV t Lane Configurations Sign Control Grade Volume (veh /l Peak Hour Factor Hourly flow rate Pedestrians Lane Widt Walking Speed (ft/s) ercent Blocka ` . ' Right turn flare Median storage veh Jpstream signal,'' " pX, platoon unblocked conflicting volume vC1, stage 1 conf vol vC2, stage 2, conf vCu, unblocked vol tC, 2 stage 0.92 0.92 0.92 0.92 0.92 0.92 p0 queue free % cM capacity (veI Du otton ane Volume Total' Volume Left Volume Right cSH plume to`Ca aci: Queue Length 95th (ft) Controt D Lane LOS Approach Delay Approach LOS reaTORV crs �.�..r� - , , Average Delay Intersection Capacity Ut ilizati Analysis Period (min 0.9 P: \10006.00 \graphics \BASES\2011 NB AM.sy7 vhb, inc. 15 iiiniMITOTOWSEje ervi 1J x Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 15: Evergreen & Site Dr PICONEITMEIREFORMITSAMMK,4,4„, . — loom Lane Configurations 4) 4) 4. §i00 (:.POIlt(0:';mM6.' Grade 0% 0% 0% 0% 1 Ven/h Volurrie.'() ''.!.:: '''-' ti' '-''''' '',' 0 ''''-'''.."' ''. ' 5 5 ` -":''''";'3 , -,..i0....'` i." '::',:,' .:.sT&I 0 : ■ I.-..... - 1 ' (veh/h) ',',-.- '', ',-,' : ' `‘', .:''": -.'.": T. :. '',-;"''-'.;,,... .":.''.. , ',": .:;',--'': "n,-,`C::C31';'; ;-',..,..;',..;,;.).-.j'.-`,..,,, Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Rb6VC',Jdki4fCNO:.(0: 12 Pedestrians t.. 1 - Ayio . , , ,v.vlairi.T.(fi) .302S?g(k. -.--(at:,'NF(..:;:.(-(zr((((s.:',• . .., -,.:1,.,,,.,-:-...y::,!,,i Walking Speed (ft/s) Right turn flare (veh) Mecftan type .. None None Median storage veh) Upstream s:gnal (ft) pX, platoon unblocked vC1, stage 1 conf vol vCu, unblocked vol 7 12 32 32 12 43 31 6 ;?..; tC, 2 stage (s) t DifgEtarEalig ...e_ds5a 1,111111 Volutila .a Average Delay A 0 A A .4 p0 queue free °A. 100 100 100 100 — 2011 NoBuild PM 15ftflgifff; - ,: - .11Vii5f.:0 99 100 100 100 Volume Left cSH 1614 1607 1069 1007 • RiTREIRTSWEIVIRSEEIGMBENEWATRir VIRMICIENNW 4.3 - intersectionfcwapacitptutilization,i,..;:%:40.,66,,,,,,:r.,,,,m,,:1, I k2; , :Lev e opb e Analysis Period (min) 15 Synchro 6 Report P:\10006.00\graphics\BASES\2011 NB PM.sy7 Page 1 vhb, inc. HCM- Unsignalized -.Lntersection_Capacity Analysis 2011 NoBuild AM 5: Haydenville (Rt 9) & Leonard 7 3 - -WE WNW INELSIN agia. Lane Configurations Sign Control Grade Vo ume (:veh Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 V. Hourly flow rate (v Pedestrians Lane W WO: Walking Speed (ft /s) Pe "rcent ,Blockac _ Right turn flare (veh edian tyl Median storage veh Upstream signal pX, platoon unblocked vC, conflictin volume` vC1, stage 1 conf vol con vCu, unblocked vol 773 j.60 tC, 2 stage p0 queue free cM capa (ue • Volume T� Volume Left o neR ~ cSH Volume to Capaci; Queue Length 95th (ft) Control De Lane LOS Approach Delay Approach LOS 'I "a f ta c rege Pr Average Delay Intersection Ca Analysis Period act P f 842 1700 303 0.4 P: \10006.00 \graphics \BASES\2011 NB AM.sy7 vhb, inc. 1088 767 Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 3: E Center & Ha denville Rt 9 Ia�ueentBL Lane Configurations Sign' C on", Grade V•lume(.veh /h) Peak Hour Factor H ourly flow rate(v Pedestrians Lane Width Walking Speed (ft /s) ercent Blop Right turn flare : Median!„ type '" Median storage veh stream signal { (f t pX, platoon unblocked conflicting vdi vC1, stage 1 conf vol vC:2, stage 2 con vC u, unblocked vol 1150 420 420 stngl tC, 2 stage (s) p0 queue free % capacity (veh; rM9n5,- an VolumE Volume Left olume: cSH Volum to C apac, Queue Length 95th (ft) ontr of Lane LOS p040: {Delay'i Approach LOS ;ink re sec,,tto STMT e Average Delay Intersectlori Capacit Analysis Period (min 0.92 0.92 0.92 0.92 0.92 0.92 99 544 1140 1700 I \ 98 97 0.6 P: \10006.00 \graphics \BASES\2011 NB PM.sy7 vhb, inc. 1 a S FA ° T'3' 2011 NoBuild PM s'ire 0.� Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 12: Florence & Front NOM Et lifT-FigniNMEMBEE,.. Lane Configurations S ign Control , Grade V o l ume0e h /h) Pe H our Factor Haurlyflow rate =(v Pedestrians Lane Wi" Walking Speed (ft/ s) P,erce iv Iockagei Right turn flare Median .type Median storage veh Upstream signal (f pX, platoon unblocked uC, conflicting volume vC1, stage 1 conf vol uC2, stage 2 cohf vo(,' vCu, unblocked vol tC, 2 stage r Lr 4r ' Volume Left Volume` c Volume to Capaci Queue Length 95th (ft) ontro Lane LOS A'pproaeh D14 Approach LO Average Delay Intersection Cap Analysis Period (min 0% p0 queue free % capacity (yeh )ton olurne:Total 1700 1412 754 +.. Ato., s. 0.8 P: \10006.00 \graphics \BASES\2011 NB PM.sy7 vhb, inc. 0% 0% 2011 NoBuild PM Synchro 6 Report Page 1 HCM- Unsignalized- Inter- -section- Capacit-y-Analysis 2011 NoBuild AM 15: Evergreen & Site Dr Lane Configurations Sign ControlF Grade V /h) : -� ,., :;' Q 11 0 r 1111 = ' , „�r 0 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate' :(vph) ;' 0 12 0 ;12 ' 12 0 s 0 ; x 3 Pedestrians Lang. Walking Speed (ft /s) Percent=Bioc Right turn flare (veh Median type 1 : Median storage veh Upstream signal(f pX, platoon unblocked conflcting vC1, stage 1 conf vol age2corfv vCu, unblocked vol 12 12 smgle;(s) C, 2 stage (s) o um Volume Left 6Iume_Ri cSH Volume t C apacit y Queue Length 95th (ft) ) optrol Delay ( f ' Lane LOS ,proachs ueia: Approach LOS rataraMISMOVITERW,SES Average Delay Intersection Analysis Period 1607 1607 1069 4.1 15 P: \10006.00 \graphics \BASES\2011 NB AM.sy7 vhb, inc. 989 4 4 ervi 49 48 12 60 48 Synchro 6 Report Page 1 12 HCM- Unsignalized- Intersection- Capacity Analysis 5: Haydenville (Rt 9) & Leonard Lane Configurations SignC Grade Volume (veh /r Peak Hour Factor Hourly flow rate (vr Pedestrians Lane W k th (f Walking Speed (ft /s) Percent Boc` ka Right turn flare Median type ' ` Median storage veh stream signa pX, platoon unblocked vC° conflictingoaumef ; vCi, stage 1 conf vol v a:41 :n c on vCu, unblocked vol single �(s) tC, 2 stage (s) p0 queue free f " cM' capacity (ve agIBY Volume Volume Left 'o'Iume F cSH to_Ca act Queue Length 95th (ft) ontrol Lane LOS Approach Deia} Approach LOS Infer ergs u pi a .. Average Delay Intersection Capacity Ut illzat l o Analysis Period (min 1 P: \10006.00 \graphics \BASES\2011 NB PM.sy7 vhb, inc. 0.92 0.92 0.92 0.92 0.92 0.92 99 396 1074 394 1163 1700 371 96 98 44, ..:vK� 0.4 �� u a�i 2011 NoBuild PM y Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 3: E Center & Haydenville (Rt 9) 41\ t 0 . eTiVIANKTWATRUI 'F,V6t5 4 , - '174 - NR:V,MPLOR141.e"TW'WW1-7-MilT,T.F.A.I'F ATatiat„41,1 Lane Configurations Sig n.OtrO ocy. 0 Grade 285 740 Q Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 „ Pedestrians Lane Width (ft) Walking Speed (ft/s) PercenfBlockag Right turn flare (veh) ,egit Vome Volume Left 11=701■1171.71M 99 p0 queue free °A. cSH 36 gOri:PAP:..49APP,0, Queue Length 95th (ft) 004ON Lane L'O' 91 99 P:\10006.00\graphics\BASES\2011 NB AM.sy7 vhb, inc. .11111.8.1110 •. Analysis Period (min) 15 e Median storage veh) P64f64WA6i*:lltf)RaOEERZ:ga.zq pX, platoon unblocked vol, stage 1 con, vol - - . ,.. 1 .,,,,,,.:,,,,..:,,,,,,,,,,i.„.,..,,z,,,,,,...,,,,,,,,,,..,,,-„,,,;,,,,,, ,..,- ...:,,,,, ".:-:P".";:z,..,'.?.,.1,,::,-,E.F",,,-"k,::".:-J'-n1":".:::.c.;a:;.t-5:,,F,";0.:,,,,4•,,,,',2,,,q.",-;-.:',„,--,,,-21-A,:ii,:".-0,,,..(•-,'-ili,'', VC COrt „.. . , .,, ,,, .11::;:, „ ;',, ,- ,4 , ,,:*- vCu, unblocked vol 1132 804 804 te:',:70:0176r(4) igaffitMigw4457-f:11. tC, 2 stage (s) '-' ,g.",i;, 2011 NoBuild AM 'WOK 1 820 1700 '712111 A 04 00 Approach LOS immwomacrommitriamegerfferw Average Delay 0.6 nterSeCtion:iCapacityz.UtiliZatiorrA • .; 1:17*, 7: Tga• I MVP r' i'5 , Synchro 6 Report Page 1 HCM Unsignalized Intersection_Capacity_Analysis 2011 Build AM 12: Florence & Front t r Ltr woris7.61,..:, efismum. matrogye- Laneponfigurations Sgn Grade Volume (veh/ Peak Hour Factor Hourly flow ath (vpl tC, 2 stage (s) VoumTo Volume Left Average Delay Volume 1 .1•2113.11.1 I+ 4 left 5Free « Free Stop 0% 0% 0.92 0.92 0.92 0.9 0.92 Pedestrians Walking Speed (ft/s) Right turn flare (veh) Median storage veh) pX, platoon unblocked vC1, stage 1 conf vol vCu, unblocked vol 98 286 91 ,,, singe 22 100 p0 queuefree"Y. 20 cSH 1700 1495 772 Vokme to .a Queue Length 95th (ft) 0 0 3 Lane LOS A A ;l:ivg-xgu3,twan;igxw3y:::gyyoawigTN-Fop-5,,,gvgggpaggetvgggtvgm Approach LOS ritCriNgEnottmillielfgaiMitrALN....401 IMTIMP:117 1.1 . ............................................................................................ L eve l Service ce Analysis Period (min) 15 P:\10006.00\graphics\BASES\2011 B AM.sy7 vhb, inc. ... 97 99 1•41.1,61iIMEIMMENO23=1....... • WW047'' 72?"7 •■1,14 .44P gr EIRINVIWing•;:ilZ-EIVINE • 14 7. 4'144 ; r414391rWat.R.ViFfiVelgir 4 P-& - -IwAr.. 6 a* fIlIMMONOL Synchro 6 Report Page 1 15: Ever. reen & Site Dr 1 1'IOVG1Yti1t',f ° vG 2, stage 2 cori v J , sIn( tC, 2 stage (s) tF'(s ..__.__. � 1 HCM Unsignalized Intersection Capacity Analysis P: \10006.00 \graphics \BASES\2006 PM.sy7 vhb, inc. 4-- 41 t # 15 11 100 p0 queue free % 100 cM capacii plume Volume Left —awne: c Volume to Capacity Queue Length 95th (ft) Control Delay Lane LOS pproachDela Approach LOS .y YeI,ggpxgo a , :..2.ht9,4, Wzr"t�i�-*'i111 —'4 r zk ,44 Average Delay 4.3 IntersectsonfCapaci Utilizati _ Analysis Period (min) 1614 1608 1070 1010 0.00 ae 2006 Existing PM N�Y1BmE 5P:1 Lane Configurations Sign C ontrol Grade 0% VoIume (veh /h Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Pedestrians Lane Wid ( Walking Speed (ft/s) Percent Blockade Right turn flare edian type :,.._:.,... Median storage veh U pstream` signai( pX, platoon unblocked vC; c ohflietmg vo lumeY v 1, stage 1 conf vol 100 100 31 30 11 41 30 l .. u, unblocked vol 99 100 100 100 Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 2006 Existing PM 3: E Center & Haydenville (Rt 9) _lbA Lane Configurations 010;i, Contrc Grade Volume '(veh /I Peak Hour Factor Hourly flow rate'(vi Pedestrians Lane Width :( Walking Speed (ft/s) ? ercent Blockac Right turn flare Median tyj Median storage veh Upstream signal, pX, platoon unblocked vG, c nflic ot ing volurh vC1, stage 1 conf vol stage, 2 conf .. vC u, unbloc vol VOW Volume Left e Uolum cSH .. .... Volume to Cal Queue Length 95th (ft) ontrolrD (s Lane LOS App�oabl Approach LOS N,s ,� rr s7- -3. 7 r r crzi ' Sp ��`� ,If;EerO, tortSWrntary Average Delay Intersection Capacity, UtiIizat Analysis Period P: \10006.00 \graphics \BASES\2006 PM.sy7 vhb, inc. 0.92 0.92 0.92 0.92 0.92 0.92 1067 389 389 100 98 569 1169 1700 98 15 evel`of 0.5 •r Synchro 6 Report Page 1 HCM Unsignalized-Intersection-Capacity Analysis 2011 Build AM 5: Ha denville Rt 9 & Leonard -kWi4,17 • e .,..,WYMMVANivey'AOkis4M - Prist014 , 1"6 7 *.0 . 4.,., Lane Configurations Grade Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hour!y flow rate (vph) 1 318 761 13 13 12 „.. Pedestrians Walking Speed (ft/s) Percent Btockage Right turn flare (veh) Median type , Median storage veh) WOft000)0413f4iliiORTRIPTIEN.'2NPoR4v.:::if:;:P17,11, pX, platoon unblocked V.6 vbi , stage 1 conf vol ifeCTMEne Lane LOS vCu,unblockedvol 774 1088 767 - . ••• - • . 1."': - - • • . . • Queue Length 95th (ft) 0 0 7 , °furor Lie s: MI=1.01151MIMMISII• tC, 2 stage (s) p0 queue free "Yo 100 cM capacity • +•:•,-;',.•■•••,,, • . . /47 r :ETSRMWSWORNOr Noh 95 •1•■••10/.1f02 97 33 - 4 1 7 ,:fMVZ WRNS Votu Volume Left 1 0 13 776106 7PTAq 3.w.-wqr2wgagRagvraggng cSH 842 1700 296 yo a qaTflgq - ,Z , Ugi ' Vg."X 7 i4S ' inAgi ,' S",,, , . , . - Approach LOS RiffiTATREMIT'M. RAIL_ ' ' :V r.1-grAffa, mogOMMVISFWARAMW.14, Average Delay 0.4 In tersection ,uapact ULU! 4 IC Level Analysis Period (min) 15 ela=■•••■•NII:=1■07•10. Synchro 6 Report P:110006.00\graphics\BASES\2011 B AM.sy7 Page 1 vhb, inc. HCM Unsignalized Intersection Capacity Analysis 2006 Existing AM 15: Evergreen & Site Dr P!loverr�ent alj' t E ,- E Lane Configurations Sign Control`' Grade Voiume .(ve Peak Hour Factor Hourly flgw rate Pedestrians Lane W kith (ft) Walking Speed (ft/s) ?:ercent :Blockage Right turn flare Median,tj Median storage veh stream signal (fi platoon unblocked conf[icting volun' ~` vC1, stage 1 conf vol corn... u, unblocked vol single (s)'` tC, 2 stage (s) p0 queue free % cM cabaci sec Volum Volume Left ' plum e Righ'' cSH Volume to Cap Queue Length 95th (ft) iontro Lane LOS Approach; Dela Approach LOS IFfteC RMIN7 Average Delay Inte'rseetion Capacity Utiliza Analysis Period (min f 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 v1i 1608 1608 1070 1015 99 100 100 100 P: \10006.00 \graphics \BASES\2006 AM.sy7 vhb, inc. 3.2 15 Synchro 6 Report Page 1 r HCM- Unsignalized- Intersection - Capacity- Analysis 2011 Build PM 12: Florence & Front 0.92 0.92 0.92 0.92 0.92 0.92 tagifigairig4 ac Lane Configurations - 161670 - & - :476,1 Grade Volume;(veh Peak Hour Factor curly fl ow rate. (wp Pedestrians Lane Walking Speed (ft/s) ; ercent,Blocka Right turn flare Median typ Median storage veh Upstreari signal_ pX, platoon unblocked onfiictirg yolu vC1, stage 1 conf vol VC2, stage 2 conf u vCu, unblocked vol 1700 1409 757 ^a_ 168 334 166 1? , tC, 2 stage p0 queue free % capacit f D�r'` "`io y; Volume To. Volume Left Volume cSH Volume„tg Capaci Queue Length 95th (ft) ontro Dea Lane LOS ►roach Dela Approach LOS `I)'itomatio Bali ; Average Delay Intersection C 01 Analysis Period t r t, P: \10006.00 \graphics \BASES\2011 B PM.sy7 vhb, inc. g Synchro 6 Report Page 1 a`t HCM Unsignalized- Intersection- Capacity Analysis 3: E Center St & Haydenville Rd (Rt .D p0 queue free cM`capacity (vel- 0% 0% 0 °° 0.92 0.92 0.92 0.92 0.92 0.92 1050 747 747 y r* .,.... �- '1 Lane Configurations ortrgl Grade Volume' (ueh /h)` Peak Hour Factor Hourly flow rate-;(.vph Pedestrians Lane Width (ft) Walking Speed (ft /s) 'e1664 Blockagf Right turn flare Median t Median storage veh Upstream signal; p5<, platoon unbl conflicting volume vC1, stage 1 conf vol vC2, stage vCu, unblocked vol tG; single: �s) tC, 2 stage (s) tF, FDrci Volume Toth Volume Left plume cSH V;Qlume to Capaci Queue Length 95th (ft) Control Dela' Lane LO S pproac ..,... Approach LOS Itters ct ar'a Average Delay Intersection Capacity Analysis Period (min 4\ t mkt -p m r .,. 0.6 iza TicaNTWANIELL,." P: \10006.00 \graphics \BASES\2006 AM.sy7 vhb, inc. 2006 Existing AM Synchro 6 Report Page 1 — HCM Unsignalized- Intersection- eapaeity- Analysis 2011 Build PM 5: Ha denville Rt 9 & Leonard Lane Configurations S ign Contro Grade Volume(ve Peak Hour Factor H ourly flow ra Pedestrians Lane W idth Walking Speed (ft/s) Percent Blockage h�'. Right turn flare (veh) Median type Median storage veh) Upstream signal. (ft) ` .;. pX, platoon unblocked vC, onfl,ctmg volume F vC1, stage 1 conf vol 2stage u, unblocked vol 398 99 11 1161 1700 361 0.92 0.92 0.92 0.92 0.92 0.92 1076 395 98 F , .�A v sm tC, 2 stage p0 queue free % c'M capacity ( ve C'i Volurn Volume Left 'elute R# cSH Uolume to,C apaci . Queue Length 9 (ft) C ontrol Delay Lane LOS Approach D elaj Approach LOS Average Delay Intersection Ca paci Analysis Period (min P 0.5 / er: P: \10006.00 \graphics \BASES\2011 B PM.sy7 vhb, inc. Synchro 6 Report Page 1 P909983.001docslmemoslAtlachm entdoc Public Transportation i e Williamsburg Library Williamsburg Center WILLIAMSBURG 40;;Z 1/2 Leeds; /Genie Haydenville S T. NT Look Park 1 Mile • VA Hospital HATFIELD — — - - 9 bn nectic ut o: • Niue. l Q Service to Leeds Center inbound to Northampton . M, ?s only. Outbound trips will iflorence serve Leeds Center by Center t PV request. , ro c Carag \ . Al usr sT „ b ... ' 1 \ n"r' ` ` '� / \\ Cooley - Dickinson Hospital 1, tVt�G cip r f 3 <13 Northampton High School • l' !i F<y VCourthouse NORTHAMPTON sr , -; \ o Calvin Smith Colle e • ',._ _ Theatre ' i Peter Pan Bus Terming f� Walter Salvo House• 66 \ *R41 .I I WANT TO JOIN THE TRANSIT CLUB! PLEASE SEND ME THE PASSES INDICATED BELOW: ❑ Elderly & Persons with Disabilities Pass - $18.00 /month ❑ Regular Pass - $36.00 /month ❑ Ticket Pack - $9.00 /ten rides ❑ Check enclosed for month of: Northampton/ Williamsburg PVTA Route RED 42 . __.. Connecting Route • Major Bus Stop Name Address City, State, Zip Phone CONFIDENTIAL PVTA OFFICE USE ONLY Please make check payable to PVTA. Mail to: PVTA Information Center 1776 Main Street, Springfield, MA 01103 LEAVE NORTHAMPTON COURTHOUSE V.A. HOSPITAL WILLIAMSBURG CENTER V.A. HOSPITAL SMITH COLLEGE WALTER SALVO HOUSE ARRIVE NORTHAMPTON COURTHOUSE -- -- -- 0 7:00 7:05 -- 7:45 -- -- 6:00 0 6:05 6:05 8:55 6:15 9:05 9.05�s..:;: ,_.9:15.._.. :.E..;.'''::...,' .:9:30. 6:30 r. i. '..,9.56.� :'.. 6:45 6:55 7:00 7:05 7:05 12:00 7:15 12:05 12:15 12:30 12:45 7:30 1:00 7:45 7:55 8:00 8:05 8:05 ,.. -2:05. 8:15 2:45 2:55 8:30 3:05 CG 8:45 8:55 9:00 9:05 05.. _ '_ : f :9.15 .:. 4:55 9:30 - �.._ .:505x..,.:�..,.,...�5.15�,._ ,`.5.3 9:45 9:55 10:00' ..10:05 -- 6:50 -- 7:05 7:10 CG' -- -- -- 10:30 10:35 10:35 10:45 -- 10:45 10:55 11:00 11:05 CG _ " - ;: ,::. — ,,, =: . 12:40 . 0 ,_ :12:45.:... 12:45 12:55 1:10 1:25 1:35 1:40 1:45 -- -- -- -- -- 2:20 2:25 2:25 2:40 2:55 3:10 3:20 3:25 3:35 35.....:.ir . ,'.. - 50,. - '' :. `4 '.;; .4:20 >- . t' 4.30 = =; :.:r 435.: . ,: , ;: 4.45.':.: 4:45 5:00 5:15 5:30 5:40 5:45 5:55 5:55 6:05 6:20 6:35 6:45 6:50 6:55 6:55 7:05 7:20 7:35 7:45 7:50 7:55 CG LEAVE NORTHAMPTON COURTHOUSE V.A. HOSPITAL WILLIAMSBURG CENTER V.A. HOSPITAL SMITH COLLEGE WALTER SALVO HOUSE ARRIVE NORTHAMPTON COURTHOUSE - - •- - - - - -- - -- 0 7:00 7:05 7:05 7:15 7:30 7:45 7:55 8:00 8:05 8:05 8:15 8:30 8:45 8:55 9:00 9:05 9.05�s..:;: ,_.9:15.._.. :.E..;.'''::...,' .:9:30. 9.45:, .., r. i. '..,9.56.� :'.. . . � 10:05.CG - -- - -- - -- - -- - -- 12:00 12:05 12:05 12:15 12:30 12:45 12:55 1:00 1:05 115 .. ...: 1. :30,. .; - 1.45_: 155..:.,.: ..;.2200 <e..a ,.. -2:05. 2:05 2:15 2:30 2:45 2:55 3:00 3:05 CG - -- - -- - -- - -- - -- 3:50 4:00 4:00 4:10 4:25 4:40 4:50 4:55 5:05 - �.._ .:505x..,.:�..,.,...�5.15�,._ ,`.5.3 ^' - `� �..,... 45.,.�F .. �_ - 5 55_ ... ,.__ ;6.0 r.. .., . .,_ .6: 15.. 6:15 6:25 6:40 6:50 7:00 7:05 7:10 CG' RED RED NORTHAMPTON/WILLIAMSBURG SATURDAY NORTHAMPTON /WILLIAMSBURG C - bus stops on King St. at Calvin Theatre (not Courthouse) G - to PVTA Garage at 54 Industrial Drive, Northampton service Nash Hllj by_ ROUTE INFORMATION 1�inA!11;B t New Year's Day Martin Luther King Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Christmas Day WEEKDAY Now you can purchase your PVTA monthly bus pass by mail. Call 781 -PVTA for more information or mail in order form on reverse side of schedule. l RPM Pioneer Valley Transit Authority Effective September 3, 2006 Effective September 3, 2006 Service to Leeds Center inbound to Northampton only. Outbound trips will serve Leeds Center by request to driver. Due to traffic and weather conditions, times are subject to change. Fares: Elderly and Persons with Disabilities and Medicare card holders are eligible for 'h fare when they show a PVTA E &D identification card available at the Information Center. Elderly & Persons with Disabilities (with PVTA ID) 50 -cents Regular Cash Fare $1.00 Children 6 -12 years 75 -cents Children 5 years and under FREE Regular and Children's Transfer 25 -cents Elderly & Persons with Disabilities Transfer 10 - cents (with PVTA E &D identification card) Types of Bus Passes: Elderly & Persons with Disabilities ($18 /month) • Regular Pass ($36 /month) PVTA Information Center: Services offered include identification cards for elderly, persons with disabilities and Medicate cardholders, bus tokens and monthly passes. The office is located at 1776 Main Street at the Springfield Bus Terminal. Schedule and fare information is available by calling 781 -PVTA or 586 -5806. Transfers PVTA's routes are designed to create a network so that by transferring from one bus to another you can reach your destination. If you are going to transfer, purchase a transfer from the operator at the time you pay your fare. Transfers are good only until the latest time shown, and never for a round -trip or stopover.