01-001 Forest Cutting PlanQ
���AL MAC
Division of
Forests & Parka
PLEASE PRINT OR
CS m
TREE FARM NUMBER (OPTIONAL)_
DESCRIPTION OF AREA TO BE CUT
ADDRESS
1. FOREST TYPE: A WP B BB C 11H D
2. ACRES: A 3 B 1¢ C 3 D
TTER
(ENTER APPROPRIATE STAND LES) FOR NOS. 3, 4y 6 5)
3. PURPOSE(S) OF CUT:,•HARVEST ;IMPROVEMENT X ;SALVAGE ;WILDLIFE HABITAT
IMPROVEMENT • ;AESTHETIC OR RECREATION ;WATER MANAGEMENT ;OTHER
4. SOURCE OF REGENERATION: ADVANCE GROWTH ;SEEDING FROM CUT TREES ; SPROUTS
SEEDING FROM SURROUNDING /RESIDUAL STAND PLANTING DIRECT
SEEDING :OTHER +:'.'
5.,i HARVEST SYSTEM USED: SELECTION
COPPICE ' ° ;COPPICE WITH STANDARDS
SPECIAL HARVEST CUTTING (ATTACH EXPLANATLI
6. DESIGNATION OF TREES TO BE CUT: INDIVIDU
DESIGNATED BY MARKED TREES OR FLAGGING OF
DIAMETER, 'SIZE, 6 MARK BOUNDARY)
ETC.) , ..
;SHELTERWOOD CUT ;SEED TREE CUT_
_;CLEARCUT ;SALVAGE CUT
N) ;INTERMEDIATE CUT A.BrC
LLY MARKED X ;AREAS TO BE CLEARCUT
BOUNDARY ;OTHER (SPECIFY SPECIES,
-&. r- - tpg4,�D
7. ESTIMATED VOLUME BY.SPECIES: BOARD`FEET, CORDS OR
WHITE PINE ASH'"`
RED PINE ASPEN -
PITCH PINE BEECH
HEMLOCK WHITE BIRCH
SPRUCE YELLOW'BIRCH
OTHER SOFTWOODS BLACK BIRCH
BLACK CHERRY
"LOGGING 'AND'ENGINEERING `•` `" — - °' " "�
B. MEASURES PLANNED TO CONTROL EROSION (CHECK):
a. LAY OUT AND CLEAR RDADS IN ADVANCE
b. LAY OUT AND CLEAR MAIN SKID.ROADS IN ADVANCE
e. WATER BARS
• .. . LNPOUNDMENTS
"SEEDING DI STURBEDfSOLL'`�' `I?)T?(42i ?i2h9'
'1 7p ;:01REPAIRING "RUTS`)l7flfi'`..+ ihllaiuL'}li Y -ki
°S
9:' CULVERTS . y;�:lhtb'T.:
• -: Y. Lq 1:• . • . y7lfla `is +'F3.i`1Pi.�FYii3:�'i'+ki{'7
h BRIDGES
i': P CROSS STREAMS �AT'
f.
].- STOP SKIDDING'DURINC' NUDDY CONDITIONS
nz9 `k: OTHER: '•• , •• y "t:2iHi''aY,itl4Mlflglsl'tv..,u ..
*SEE FOOTNOTES a., b., & d. ON THE REVERSE SIDE
Page / 0( Lr
Notice of Intent / Forest Cutting Plan
M.G.L. Ch 1$2, Secs. 4046)
FOR D.E.M. USE ONLY
ATTACHMENTS
Ms ter Map ✓ Date Received
Sleep, Slope Form(SS)— L.:.. Map File Number HS ;Ic `ihF
Wetlands Form (WL)_� M.7
pa Msa — E S P 12 �IP�yS
TYPE.
PERCENTAGE (OPTIONAL)
HICKORY
• SUGAR MAPLE
RED MAPLE
RED OAK
WHITE OAK
OTHER OAKS
OTHER
' ROADS
LANDING
✓
xxxxxxx
y
xxxxxxx
✓
[E ow ,
✓
V
xx
xx xx 1 21995
xxxxxxx —
scanner
-- -
d,gi[IZeB
arked _
Page L of
9. a. WIDTH OF BUFi�d STRIPS ALONG PUBLIC WAYS: 50 FT. ;100 FT. I/
b. WIDTH OF BUFFER STRIPS ALONG WATER BODIES: 50 FT. FT.
C. PLAN TO CUT LESS THAN 50% IN BUFFER ; STRIPS: YES / ;NO
SHOW LOCATIONS ON ANY SUPPLEMENTARY MAPS ATTACHED TO FORMS WL AND SS.
10. MEASURES TO CONTROL MUD ON PUBLIC HIGHWAYS:
a. GRAVEL OR MULCH ACCESS ROAD ; b. STOP TRUCKING DURING MUDDY CONDITIONS,/ ;
c. CLEAN MUD FROM HIGHWAYS
11. ARE CRITICAL AREAS INVOLVED?
a. WETLANDS: YES ✓ ; NO IF YES, COMPLETE FORM WL.
b. STEEP SLOPES (OVER 30X FOR 200 FT.): YES ; NO ✓ . IF YES, COMPLETE FORM SS.
12. CVECK IF LAND IS UNDER CHAPTER 61 ✓ or CHAPTER 61A
MANAGEMENT PLAN NO. SZA ;EST. STUMPAGE VALUE �(�nJ
ARE BOUNDARIES WITHIN 50 FT OF CUTTING ARE HINT /BLAZED? YES - ; NO
13. REMARKS /ODMHENTS:_�eM i4s1;oq(+M
• Value and operator information will be provided when lot is sold.
• Exact volume will be provided after marking is completed.
14. SICNATURE OF PERSON PREPARING THE PLAN IF OTHER THAN LANDOWNER:
SIGNATURE ,� Nt�wrw_P✓ DATE AkV 28
15. SIGNATURESh' OF LANDOWNERS(S).
PLAN APPROVED .� DATE 1Z -6- 9.c
PLAN DISAPPROVED DATE
THIS APPROVAL IS OF ONLY THE CUTTING PLAN AND IH NO WAY DETERMINES THE
RIGHT TO CARRY OUT THE DESCRIBED OPERATION.
l cw l 1.1 r L
FILE (WORK ORDER) N0. �`�S�jUi DIRECTOR'S AGENT - FORER
EXPIRATION DATE
t ttA tA tA tA tA. tattArA< ttA� t�s .+A.ttA,r�,t� «at�,tA�,t��,t��a � ��A�ar�A����AA�AaA�nA�a�ax��� ..�
PLAN COMPLETION DATE EXTENDED TO
DATE
DIRECTOR'S AGENT - -FORESTER
tA tA, tA, tA, tA, tA, ttA, ttAnA �s.+ A ttAA�. t�� tA tA tA. ttA. ttA�aftttAA��, tA��A, totA.ttAAnA���.t,+A.tAAA�ar�A�A
IMPORTANT: a. IT SHALL BE THE LANDOWNER'S RESPONSIBILITY TO INFORM THE DIRECTOR OR HIS
AGENT OF INFORMATION LEFT BLANK ON THE FORM INCLUDING THE OPERATOR'S NAME AND LICENSE
HUMBER AND ANY SUBSTANTIAL CHANGE IN THE DATE THE CUTTING IS TO BEGIN. FAILURE TO DO SO
MAY RESULT IN VOIDING THIS PLAN. b. PERSONS HARVESTING FOREST PRODUCTS COMMERCIALLY IN
MASSACHUSETTS MUST BE LICENSED ONDER SEC. 46, CH. 132 OF THE GENERAL LAWS, AND ARE HELD
RESPONSIBLE FOR COMPLYING STRICTLY WITH A SUBMITTED /APPROVED CUTTING PLAN. C. IF AN
AGENT IS APPOINTED, A WRITTEN AUTHORIZATION MUST ACQQh?AWf TNT o. AA. AND MUST BE SIGNED
BY THE AGENT AND THE PRINCIPAL (LANDOWNER), d. A 1ftWz ARn W,9 TER MAP ARE REQUIRED
(SEE INSTRUCTIONS). cheek�I _,
I(WE) HEREBY CERTIFY THAT INS) HAVE THE LEGAL AUTHORITY TO CARRY OUT THE ABOVE
DESCRIBED OPERATION. FAILURE TO ACCURATELY UPDATE THE MATERIAL HEREIN REQUIRED AND
PROVIDE OTHER.RELEVANT INFORMATION CAN RESULT IN TTHHE V V OIDING OF HIS PLAN.
DATE / 0'L' 30 /9ff- LANDOWNER SIGNATURE Co�t�, l -�C�'
t Wetlands
i hfassachusetts Forest Cutting Practices Act
s i 'v "` Ln kion of For." lk Parks
Page 3 of (,
File No.
FOILU N'L
1. THE FOLLOWING WETLAND SITUATIONS EXIST: (check those used)
A. Stream crossings (indicate location(s) on map by number
Method of Crossing Is- .Structure
# Loc. on Me Ford Bridge culvert Other(describe) permanent temporary
A -1 X fXl TI
A -2 X �/ poiES
A-4 _
B. CROSSING of wetland areas (swamps, land subject to flooding, bordering
vegetative wetlands, etc.)
To Be Done When Ground Is:
Loc. on Mapl Dry I Frozen I Special Provision (see /f4 [eparate f crossing
B -1 s by cause - B ay, tben de- E cribe on a
B -4 sheet
C. LOGGING of wetland areas (swamps, land subject to flooding, bordering
vegetative wetlands, etc.)
To Be Done When Ground Is:
Loc. on Map Dry Frozen Special Provision (see 04)
C -1 X O X [ NOTE: Not awe
C -2 507. of Basal
C -3 Area may be cu
C -4 at one time.
2. MAPS: In simple situatiuna, wetlands and operations may be shown on the master
map. More complex situations may require a supplementary map to accompany this
form. In any event, the following items must be clearly shown:
A. All wetland areas in and around the area to be operated.
B. Filter strips 50 feet wide along all water bodies.
C. Portions of filter strips to be crossed by logging equipment (see 3 below)
D. Buffer strips of 50' or 100' along all water bodies (see cutting plan M9).
E. Location of trunk roads, fardings, or main skid roads (ircli.d ing stream
crossings by ford) located within the wetland areas.
F. Location of water control structures such as bridges, culverts, hay
impoundments and sections of roads needing water bars.
G. Is a supplementary sup attached? Yes_; No X
3. Specific reason(s) for operating logging equipment within filter strips:
Crossing A -1 is needed for access.
f A -1?
4. If crossing or logging of wetland areas is to be done by special provision see
1.13, or C. above), describe: a.) The special provisions; and b.) why the operation
is not feasible when soil is dry, frozen or otherwise stable.
NOTE: DO NOT REFUEL OR CLEAN ANY Fn117nmru7 mTTUTV ins -- ...... __ -. .
Dale ,, /9QS Landowner Signs
APPROVED
DISAPPROVED Date dag(tlze� — � T -
� IIICTO7�R'S AG NT - FORESTER
checked
I
I
zll
i
c-
c
29SO — N
��w NORTH� �
, DOWN
U
wr-A
el _X %\
�NORTHAWMN. MA Property of
Robert E. Bates
68 Sheffield Lane
Northampton, MA 01060
Prepared 5/94 by Lincoln C. Fish,
Bay State Forestry Service
from David Robb Chap. 61 Map and Assessors' Maps
SCALE: 1" = 300'
P'V oF6
S
s
A
e
z�
LEGEND
— • — • — Forest Type Boundary
o n
— •-->• --•• — Intermittent Stream
- -x- Barbed Wire
n ^ p
Stone Wall
I P Iron Pin
1 1
L Wet Area
�
Area Excluded from Chapter 61
— Woods Road
® Landing Area
q -�� 5krta+� CresS,no�
w B Water Bars to be Installed
U
wr-A
el _X %\
�NORTHAWMN. MA Property of
Robert E. Bates
68 Sheffield Lane
Northampton, MA 01060
Prepared 5/94 by Lincoln C. Fish,
Bay State Forestry Service
from David Robb Chap. 61 Map and Assessors' Maps
SCALE: 1" = 300'
P'V oF6
S
s
A
e
z�