Loading...
16B-001 41 MARK WARNER DR - 20 BRIDGE RD BP 2011 -0284 GIS #: C OMMONWEALTH OF MASSACHUSETTS Map-Bloc 16B - 001 CITY OF NORTHAMPTON Lot: -041 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category BUILDING PERMIT Permit # BP-2011-0284 Protect # iS - i 1 -0004 74 Est. Cost: $244435.00 Fee: $1472.20 PERMISSION IS HEREBY GRANTED TO: Const. Class: 5B Contractor: License: Use Group: R4 SALOOMEY CONSTRUCTION 018780 Lot Size(sq. &L Owner: BRIDGE ROAD LLC Zoning: SR/URA/RI/WSP Applicant SALOOMEY CONSTRUCTION AT: 41 MARK WARNER DR - 20 BRIDGE RD Applicant Address: Phone: Insurance: P O BOX 1203 (413) 269 -4360 Workers_ Compensation WESTFIELDMA01086 ISSUED ON: 11/23/2010 0 :00 :00 TO PERFORM THE FOLLOWING WORK .- CONSTRUCT SFH WATT GARAGE /DUNROOM STYLE B POST TIIIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of /Wiring D.P.W. Building Inspector Underground: rice: / 8 / // Meter: Footings: Rough:Z ` - 1 Rough: #��///�Ah i�-Driveway House # Foundation: Off, Final: Final: �° ` "f![ � Final: 6 1 ?1{{b� Rough Frame:0K Gas: Fire Department Fireplace /Chimney: kou h• �' Insulation: <2 Alm Final: 3 Smoke: ��{,o• Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REG �EGt►t.� � �At+t�+�/1r+ Certificate of Occunan SiJOY nature: FeeType: Date Paid: Amount: a Building —11/23/2010 0:00:00 $1472.20 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Louis Hasbrouck — Building Cornmissioner F Ke- eztL- 1 l7 File # BP- 2011 -0284 Z ter (1 APPLICANT /CONTACT PERSON SALOOMEY CONSTRUCTION A0 ADDRESS/PHONE P O BOX 1203 WESTFIELD (413) 269 -4360 n0 �' 6 i PROPERTY LOCATION 41 MARK WARNER DR - 20 BRIDGE RD (,,, v?j MAP 16B PARCEL 001 041 ZONE SR/URA/RI/WSP THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid 771 y1p , Typeof Construction: CONSTRUCT SFH W /ATT GARAGE/DUNROOM STYLE B New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/ Statement or License 018780 / 3 sets of Plans / Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO VfATION PRESENTED: ,, 0 Approved V Additional permits required (see below) � s �°vC 'TC ,L vv+ vJ ;F_. E; j D PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND /OR Special Permit With Site Plan Major Project: Site Plan AND /OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received & Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management o Demolition Delay c% It 1 031 1 0 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning & Development for more information. Department use only City of Northampton Status of Permit: 0 Building Department Curb Cut/Driveway Permit 21 Main Street Sewer /Septic Availability � ,doom 100 Water/Well Availability, � Northampton, MA 01060 Two Sets of Structural Plans v phone 413- 587 -1240 Fax 413 -587 -1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 - SITE INFORMATION 1.1 Property Address This section to be completed by office Lot #41 Mark Warner Drive Map Lot D < UnQi Bear Hill Estates -20 Bridge Rd. Northampton, MA 01060 Zon ria Drs / VIL", : Elm St District CB District SECTION 2 - PROPERTY OWNERSHIP /AUTHORIZED AGENT 2.1 Owner of Record Bridge Road LLC P.O. Box 1203, Westfield, MA 01086 Name (Print) 1 Try ' ` •54 �cxD Telephone Signature 2.2 Authorized Agent: Ziter Saloomey P.O. Box 1203, Westfield, MA 01086 Name (Print) Current Mailing Address: 413 -269 -4360 Signature 1 Telephone SECTI - ESTIMATED CONSTRUC COSTS Item Estimated Cost (Dollars) to be Official Use Only com leted by ermit applicant 1. Building 217,135.00 (a) Building Permit Fee 2. Electrical 5,400.00 (b) Estimated Total Cost of Construction from 6 3. Plumbing 11,600.00 Building Permit Fee 4. Mechanical (HVAC) 10, 300.00 5. Fire Protection 6. Total = (1 + 2 + 3 + 4 + 5) 244, 435.00 Check Number 6 This Section For Official Use Onl Date Building Per t N ber: Issued: . Signature: Building Commissioner /Inspector of Buildings Date Section 4. ZONING Att Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg & paved p arking) # of Parking Spaces Fill: (volume & Location) A. Has a Special Permit /Variance /Finding ever been issued for /on the site? NO Q DON'T KNOW Q YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW ® YES IF YES: enter Book Page and /or Document # B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW © YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained ® , Date Issued: C. Do any signs exist on the property? YES ® NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES ® NO IF YES, describe size, type and location: E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan that will disturb over 1 acre? YES QS%j NO O IF YES, then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable) New House ® Addition ❑ Replacement Windows Alteration(s) Roofing Or Doors D Accessory Bldg. ❑ Demolition ❑ New Signs [[:3] Decks [M Siding [[- Other [[7] Brief Description of Proposed NEW OpNSTRUCPION of "B" Style Unit OJ S U Work: i1 f C ���� Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll - Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building: One Family X Two Family Other b. Number of rooms in each family unit: _ Number of Bathrooms c. Is there a garage attached? Y d. Proposed Square footage of new construction. Dimensions sa X y e. Number of stories? f. Method of heating Gas (propane0 Fire lac 1 g . Fireplaces or Woodstoves p 9dumber of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction JLA i. Is construction within 100 ft. of wetlands? Yes x No. Is construction within 100 yr. floodplain Yes <No j. Depth of basement or cellar floor below finished grade F-_ rd k. Will building conform to the Building and Zoning regulations? X Yes No. I. Septic Tank City Sewer X Private well City water Supply X SECTION 7a - OWNER AUTHORIZATION - TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT ZITER SAL COMEY as Owner of the subject property hereby authorize ZITER SALOOMEY to act on my behalf, in all matters relative to work authorized by this building permit application. - 9/20/10 Si ature f Owner Date ZITER SALOOMEY I ' , as Owner /Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. ZITER SALOOMEY Print Name Signat of er/Agent Date SECTION 8 - CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor Not Applicable ❑ Name of License Holder ZITER SALOOMEY 018780 License Number P.O. Box 1203, Westfield, MA 01086 11/13/11 Address Expiration Date 413- 531 -0062 Signature Telephone 9. Res s eyed Home Improvement C tract Not Applicable ❑ SALOOMEY CONSTRUCTION, .NC 100978 Company Name Registration Number P.O. Box 1203, Westfield, MA 01086 6/24/12 Address Expiration Date 413- 269 -4360 Telephone SECTION 10- WORKERS' COMPENSATION INSURANCE AFFIDAVIT (M.G.L. c. 152, § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... No...... ❑ 11. - Home Owner Exemption The current exemption for "homeowners" was extended to include Owner - occupied Dwellings of one (1) or two(2) families and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts as supervisor. CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner Person (s) who own a parcel of land on which he/she resides or intends to reside, on which there is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm structures. A person who constructs more than one home in a two -year period shall not be considered a homeowner Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s) you hire to perform work for you under this permit. The undersigned "homeowner" certifies and assumes responsibility for compliance with the State Building Code, City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature N N The Commonwedlin of Massachusetts I _ ± — (a Department oflndustrialAccidents l_' �- - r Office ofl — 600 Washington Street !� Boston Mass. 02111 _`— Workers' Compensation Insurance Affidavit name: location: city phone # I am a homeowner performing all work myself. I am a sole proprietor and have no one working in any capacity III all, MENREW I am an employer providing workers' compensation for my employees working on this job. SalooM Constructit�n company na'tne• Y Bo 203 1 P O X address: Westfield, Ma t}1 086.::::.: < ;:::: � <1.3 >.``'`ZS:�`�:4 °3.6:0 city phaiie ;. #r J insurance co.. MdSS Employers Iris. C O iicv# M6 - 2001 ? 200 • C] I am a sole proprietor, general contractor, or homeowner (circle one) and have hired the contractors listed below who have the following workers' compensation polices: company name address city: Rorie: #: insurance co. company frame: address: city: Rhyne #; insurance co. poliev:# ttach d__ho_- 'shxe ""EMS _c . Failure to secure coverage as required under Section 25A of ifGL 152 can lead to the imposition of criminal penalties of a fine up to S1b00.00 and /or one vears' imprisonment as well as civil penalties in the form of a STOP WORK ORDER and a fine of 5100.00 a day against me. I understand that a copy of this statement may be forwarded to the Office of Investigations of the DIA for coverage verification. I do hereb erttfr unde the gains a allies of perjure• that the information provided above is true and correct S i snatur Date Printname -Merri yn A. Gagri ' — Office Manager Phone# (413) 269 -4360 { official use only do not write in this area to be completed by city or town official city or town: permit/license # n Building Department QLicensing Board `=3 p check if immediate response is required (]Selectmen's Office []Health Department i, contact person: phone #; n Other Irmsed 3195 P1Al Generated by REScheck -Web Software Compliance Certificate Energy Code: 2009 IECC Location: Northampton, Massachusetts Construction Type: Single Family Glazing Area Percentage: 31% Heating Degree Days: 6404 Climate Zone: 5 Construction Site: Owner /Agent: Designer /Contractor: Compliance: Passes using UA tra de-off Compliance: Maximum UA: 570 Your UA: 511 Cont. Assembly Gross Cavity R- or Area or Value Value Door U- Perimeter Ceiling: Flat or Scissor Truss 1250 38.0 0.0 37 Skylight: Wood Frame, 2 Pane w/ Low -E 12 0.310 4 Ceiling: Cathedral 450 38.0 0.0 12 Wall: Wood Frame, 16in. o.c. 1522 21.0 0.0 57 Door: Solid 40 0.180 7 Door: Glass 80 0.310 25 Window: Wood Frame, 2 Pane w/ Low -E 348 0.310 108 Window: Wood Frame, 2 Pane w/ Low -E 50 0.310 16 Basement: Wood Frame 400 21.0 0.0 18 Wall height: 8.0' Depth below grade: 7.3' Insulation depth: 8.0' Basement: Wood Frame 800 21.0 0.0 48 Wall height: 8.0' Depth below grade: 0.0' Insulation depth: 8.0' Floor: All -Wood Joist/Truss Over Uncond. Space 880 30.0 0.0 29 Floor: Heated Slab -On -Grade 226 13.0 150 Insulation depth: 6.0' Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck -Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name - Title Signature Date Project Title: Report date: 09/20/10 Data filename: Pagel Generated by REScheck -Web Software Inspection Checklist Ceilings: • Ceiling: Flat or Scissor Truss, R -38.0 cavity insulation Comments: • Ceiling: Cathedral, R -38.0 cavity insulation Comments: Above -Grade Walls: ❑ Wall: Wood Frame, 16in. o.c., R -21.0 cavity insulation Comments: Basement Walls: • Basement: Wood Frame, 8.0' ht / 7.3' bg / 8.0' insul, R -21.0 cavity insulation Comments: • Basement: Wood Frame, 8.0' ht / 0.0' bg / 8.0' insul, R -21.0 cavity insulation Comments: Windows: • Window: Wood Frame, 2 Pane w/ Low -E, U- factor: 0.310 For windows without labeled U- factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: • Window: Wood Frame, 2 Pane w/ Low -E, U- factor: 0.310 For windows without labeled U- factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: Skylights: ❑ Skylight: Wood Frame, 2 Pane w/ Low -E, U- factor: 0.310 #Panes Frame Type Thermal Break? Yes No Comments: Doors: • Door: Solid, U- factor: 0.180 Comments: • Door: Glass, U- factor: 0.310 Comments: Floors: • Floor: All -Wood Joist/Truss Over Uncond. Space, R -30.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. • Floor: Heated Slab -On- Grade, 6.0' insulation depth, R -13.0 continuous insulation Comments: Slab insulation extends down from the top of the slab to at least 6.0 ft. OR down to at least the bottom of the slab then horizontally for a total distance of 6.0 ft. Air Leakage: ❑ Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material, suitable film or solid material. ❑ Air barrier and sealing exists on common walls between dwelling units, on exterior walls behind tubs /showers, and in openings between window /door jambs and framing. Project Title: Report date: 09/20/10 Data filename: Page 2 ❑ Recessed lights in the building thermal envelope are 1) type IC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. ❑ Access doors separating conditioned from unconditioned space are weather - stripped and insulated (without insulation compression or damage) to at least the level of insulation on the surrounding surfaces. Where loose fill insulation exists, a baffle or retainer is installed to maintain insulation application. ❑ Wood - buming fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: ❑ Building envelope air tightness and insulation installation complies by either 1) a post rough -in blower door test result of less than 7 ACH at 33.5 psf OR 2) the following items have been satisfied: Air barriers and thermal barrier: Installed on outside of air - permeable insulation and breaks or joints in the air barrier are filled or repaired. Ceiling /attic: Air barrier in any dropped ceiling /soffit is substantially aligned with insulation and any gaps are sealed. Above -grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. Floors: Air barrier is installed at any exposed edge of insulation. Plumbing and wiring: Insulation is placed between outside and pipes. Batt insulation is cut to fit around wiring and plumbing, or sprayed /blown insulation extends behind piping and wiring. Corners, headers, narrow framing cavities, and rim joists are insulated. Shower /tub on exterior wall: Insulation exists between showers /tubs and exterior wall. Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U- factor of 0.50 and the maximum skylight U- factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: ❑ Vapor retarder is installed on the warm -in- winter side of all non- vented framed ceilings, walls, and floors; or it has been determined that moisture or its freezing will not damage the materials; or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: ❑ Materials and equipment are installed in accordance with the manufacturer's installation instructions. ❑ Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R- value. • Materials and equipment are identified so that compliance can be determined. • Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R- values and glazing U- factors are clearly marked on the building plans or specifications. Duct Insulation: ❑ Supply ducts in attics are insulated to a minimum of R -8. All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R -6. Duct Construction and Testing: • Building framing cavities are not used as supply ducts. • All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are substantially airtight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction. Metal duct connections with equipment and /or fittings are mechanically fastened. Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet -metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking -type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa). ❑ Duct tightness test has been performed and meets one of the following test criteria: Postconstruction leakage to outdoors test: Less than or equal to 261.2 cfm (8 cfm per 100 ft2 of conditioned floor area). Postconstruction total leakage test (including air handier enclosure): Less than or equal to 391.8 cfm (12 cfm per 100 ft2 of conditioned floor area) pressure differential of 0.1 inches w.g. Rough -in total leakage test with air handler installed: Less than or equal to 195.9 cfm (6 cfm per 100 ft2 of conditioned floor area) when tested at a pressure differential of 0.1 inches w.g. Rough -in total leakage test without air handler installed: Less than or equal to 130.6 cfm (4 cfm per 100 ft2 of conditioned floor area). Project Title: Report date: 09/20/10 Data filename: Page 3 Heating and Cooling Equipment Sizing: ❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. ❑ For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and /or Service Water Heating (Sections 503 and 504). Circulating Service Hot Water Systems: • Circulating service hot water pipes are insulated to R -2. • Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: ❑ HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R -3. Swimming Pools: • Heated swimming pools have an on /off heater switch. • Pool heaters operating on natural gas or LPG have an electronic pilot light. • Timer switches on pool heaters and pumps are present. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar- and /or waste - heat - recovery systems. • Heated swimming pools have a cover on or at the water surface. For pools heated over 90 degrees F (32 degrees C) the cover has a minimum insulation value of R -12. Exceptions: Covers are not required when 60% of the heating energy is from site - recovered energy or solar energy source. Lighting Requirements: ❑ A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: Compact fluorescent T -8 or smaller diameter linear fluorescent 40 lumens per watt for lamp wattage <= 15 50 lumens per watt for lamp wattage > 15 and <= 40 60 lumens per watt for lamp wattage > 40 Other Requirements: ❑ Snow- and ice- melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling, and c) the outdoor temperature is above 40 degrees F (a manual shutoff control is also permitted to satisfy requirement `c'). Certificate: ❑ A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R- values; window U- factors; type and efficiency of space- conditioning and water heating equipment. The certificate does not cover or obstruct the visibility of the circuit directory label, service disconnect label or other required labels. NOTES TO FIELD: (Building Department Use Only) Project Title: Report date: 09/20/10 Data filename: Page 4 2009 IECC Energy Efficiency Certificate Insulation Rating R-Value Ceiling / Roof 38.00 Wall 21.00 Floor / Foundation 30.00 Ductwork (unconditioned spaces): Glass & D.. . Window 0.31 0.25 Skylight 0.31 0.25 Door 0.31 0.25 Cooling Heating & Heating System: Cooling System: Water Heater: Name: Date: Comments: .............................. .... Project Title: Report date: 09/20/10 Data filename: Page 5 c IM ran DEPP.RTMENT OF BUILDD\IG 7NSPEG7IONS 212 Main Street * -Municipal Building :INSPECTOR ' Nord=ptcm, NLA 01060 LOCATION y- SQUARE FOOTAGE AMOUNT BASEMENT @ - 3c� CQ 1 FLOOR @ .50 / 2'' FLR @ :30 � cc yy l FLOORS, FINISH ATTIC, GARAGE @.20 / ! 7 G , Q O DECK/PORCHES @ . TOTAL.. Louis Hasbrouck From: David Pomerantz, CS Director Sent: Friday, November 19, 2010 3:40 PM To: Louis Hasbrouck Subject: RE: Bear Hill Estates Stormwater Permit Amendment Louis - I'm satisfied with Saloomey's letter that the detention basin /pipe connection work will be done by the end of the year, pending coordination with Central Services. That work would need to include sediment control and required repairs to the parking lot at JFK based on projected site work. Also, I'm satisfied with the proposed Spring, 2011 schedule for additional construction as long as that schedule is met. David From: Louis Hasbrouck Sent: Friday, November 19, 2010 2:45 PM To: David Pomerantz, CS Director Subject: FW: Bear Hill Estates Stormwater Permit Amendment Dave, Does Doug's report and Ziter's letter satisfy your requirements? Let me know. Thanks. Louis Hasbrouck City of Northampton Town of Williamsburg (413) 587 -1240 From: Doug McDonald [ mailto:dmcdonald(a)nohodpw.org] Sent: Friday, November 19, 2010 2:31 PM To: Ziter Saloomey Cc: Carolyn Misch; Louis Hasbrouck; PMGOGGINSCcbaol.com 'David Dietz'; Jim Laurila; Ned Huntley; David Pomerantz, CS Director Subject: Bear Hill Estates Stormwater Permit Amendment Ziter: Attached please find the approved Amendment to the Stormwater Management Permit for Bear Hill Estates. Please read the conditions of the permit amendment and let me know if you have any questions. David Dietz should coordinate with the Central Services Department and JFK Middle School administration to schedule the work on JFK property at an appropriate time. I look forward to the completion of the work and a resolution of the drainage issues. Thanks, Doug Doug McDonald Environmental Planner Engineering Department Northampton Department of Public Works 125 Locust Street Northampton, MA 01060 i 413 -587 -1582 (tel) 413 -587 -1576 (fax) dmcdonald( ,vnohodpw. org http://www.northamptonma..izov/dpw/Stoi 2 STORMWATER MANAGEMENT PERMIT Amendment to Permit City of Northampton Department of Public Works Vj c Project / Site Name: Bear Hill Estates (previously Warner Hill Estates) Project Street or Location / Assessor I Current Owner Name: Ziter Saloomey, Saloomey Construction Inc. Current Owner Address/Phone: P.O. Box 1203, Westfield, MA 01086 / 413- 259 -4360 Date of Original Permit Decision: 3/17/2005 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: Approval of the Stormwater Management Permit Amendment. X Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development of the proposed West Street Parking Area shall be conducted in strict accordance with the previously approved plans and information as referenced in the Stormwater Management Permit issued by the Northampton Department of Public Works (DPW) on 3/17/2005 and as amended by the following plans and information and as amended by any conditions attached to this permit amendment. a. Drainage Modification Plan, Bear Hill Estates, Bridge Rd., Northampton, MA, Sheet SKI, dated 5/17/2010 and revised 11/12/2010, prepared and stamped by Mark B. Darnold, P.E., The Berkshire Design Group, Inc. b. Bear Hill Estates, Revisions to Stormwater Management System Modifications with Conservation Restriction, Letter and Drainage Calculations, dated 10/8/2010, prepared by Marc D'Urso, P.E., The Berkshire Design Group, Inc. c. Letter from Ziter Saloomey, Saloomey Construction to Doug McDonald, Northampton DPW, regarding East Detention Basin / Soccer Field, Bear Hill Estates, dated 11/16/2010. M: \Stormwater Permits \Permits_Active \Bridge Road\Bear Hill Estates \Bear Hill Estates Ldoc Page 1 of 2 Specific Permit Conditions: 1. The construction and stabilization of the Stormwater Management System Modifications and the soccer field as specified in the approved plan cited above shall proceed according to the schedule outlined in the 11/16/2010 Letter from the owner, Ziter Saloomey cited above. The contractor must install appropriate erosion and sediment control measures during construction to prevent the discharge of sediment to the municipal drainage system. If the work does not proceed according to the specified schedule, the DPW may request a hold on issuance of additional building or occupancy permits until such time as construction and stabilization of the site has been completed to the satisfaction of the DPW. 2. The modified stormwater management system at Bear Hill Estates approved as part of this amendment is designed to correct offsite flooding problems at the JFK Middle School and mitigate and safely convey peak stormwater flows. If, after reconstruction of the stormwater management system at Bear Hill Estates, the flooding problems continue at JFK Middle School or other adjacent properties or roadway, the owner of the Bear Hill Estates Stormwater Mangement System must reassess the functioning and discharge point of the on -site stormwater system. If the stormwater management system at Bear Hill Estates is found to increase stormwater flows or volumes to adjacent properties or to the municipal storm drain system, or otherwise result in negative impacts to adjacent properties resulting from excessive offsite stormwater flows, the owner shall redesign and reconstruct the drainage system to correct these problems to the satisfaction of the DPW. n flDat la ature of y ngineer cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development M: \Stormwater Permits \Permits_Active \Bridge Road \Bear Hill Estates \Bear Hill Estates Ldoc Page 2 of 2 �� p ' � � row -• ro r` � � � ``�' � n � ,�,. �• fy co � � p 4 A tom.,. � � rt v' t► n Z` (�► 'c3 • /r� n '+ ro Z n U q rt m M o Ln CD r+ `C3 CD O Q0 w tp cy rl ro "S W yoe O Q A ro vr-- O n