Loading...
Calvin Coolidge Bridge General Plan310CMR 10.99 Form 5 Commonwealth of Massachusetts From Northampton Conservation Mass. Highway Depaitalent Attention: Lori Lundgren Name of property owner Ten Park Plaza, Room 4260 Boston, MA 02116 -3973 Address [ ] Public water supply [ ] Private water supply [ ] Ground water supply Doc 990001062 OR 1563410169 031091x— '114;52 Order of Conditions Massachusetts Wetlands Protection Act G.L. c. 131, §40 and the Northampton Wetlands Protection Ordinance Commission Issuing Authority To: Mass. Highway Depaitlnent Attention: Lisa Rhodes Name of Applicant Ten Park Plaza, Room 4260 Boston, MA 02116 -3973 Address This Order is issued and delivered as follows: [ ] by hand delivery to applicant or representative on (date) [X ] by certified mail, return receipt requested on January 19, 1999. This project is located in Northampton at Route 9 over the Connecticut River . The property is recorded at the Registry of Hampshire County Book N/A Page N/A Certificate (if registered) N/A The Notice of Intent for this project was filed on November 23, 1998. The public hearing was closed on December 28, 1998. Findings: [X] Flood Control [X] Storm damage prevention [X] Prevention of pollution Total Filing Fee Submitted $787.50 State Share $381.25 (' /Z fee in excess of $25) Total Refund Due $ City Portion $ State Portion $ (1/2 total) 1 DEP File No. 246 - 437 (To be provided by DEP) City /Town Northampton Applicant_Mass Highway Dept. Map #:10 - _1. - Parcel # The Northampton Conservation Commission has reviewed the above - referenced Notice of Intent and plans and has held a public hearing on the project. Based on the information available to the Conservation Commission at this time, the Commission has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act (check as appropriate): [ ] Land containing shellfish [ ] Fisheries [ ] Protection of Wildlife Habitat City Share $406.25 (1/2 total) rte, T Doc: 990007062 OR /5u,,/0170 03/09/1999 14:52 Therefore, the Northampton Conservation Commission hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the regulations, to protect those interests checked above. The Conservation Commission orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions: 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by -laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. The applicant is prohibited from using demolition materials, asphalt, large chunks of concrete, tree stumps and limbs, and general refuse; 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings, before the Department have been completed. 8. No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of 2 SPECIAL CONDITIONS: Doc; 990007062 OR /5634/0 1' . 03/09/199914;52 title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be proposed work is to be done. The recording information shall be submitted to the Commission on the form at the end of this Order prior to commencement of the work. The Commission usually will record the Order in the Registry of Deeds. It is the applicant's responsibility to insure the Order is properly recorded. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the works, "Massachusetts Department of Environmental Protection, File Number 246- 437 ." 10. Where the Department of Environmental Protection is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 11. Upon completion of the work described herein, the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: PLANS /TITLE DATED SIGNED & STAMPED BY: Notice of Intent by Mass. Highway Dept. 11/16/98 Lori A. Lundgren "Hadley/Northampton, Route 9, General 1998 Plan," Sheets 8, 9 and 10. All Plans and information on file with Northampton Conservation Commission 13. The Commission and its agents shall have the right to enter and inspect the property at any time to monitor for compliance with the conditions of this Order, the Act, and Wetlands Protection Regulations: 310 CMR 10.00 and Chapter 24 of the City's Ordinances: "The Wetlands Protection Ordinance ". They shall have the right to request and receive any data or documentation that is deemed necessary for evaluation of compliance. 3 Docl 990007062 OR /5634/01'h— ' 03/09/199914;52- 14. This Order of Conditions shall apply to any successor in interest or successor in control; 15. The owner of the property described in this Order, must advise any potential buyer of the property that any construction or alteration to said property, including brush cutting or clearance, may require approval by the Northampton Conservation Commission. Any instrument conveying any or all of the owners' interest in said property or any portion thereof, shall contain language similar to the following: "This property is subject to the Northampton Wetlands Protection Ordinance and /or Wetlands Protection Act. Any construction or maintenance work performed on this property requires an Order of Conditions, and /or a Determination of Applicability from the Northampton Conservation Commission "; 16. The contractor is as responsible as the applicant and property owner for any violations of the Orders of Condition and penalties under the law, while all activities regulated by this Order are being performed. 17. A copy of this Order and associated plans shall remain on site during all construction and /or building activities. The project manager and all equipment operators shall be familiar with the approved plans, and shall be informed of their location on the site. This location shall be accessible to all contractors whenever work is occurring on site. 18. All required permits must be obtained from the Army Corp of Engineers (Section 404, Water Quality Certification), Planning Board, Zoning Board, Department of Public Works, or Building Inspector prior to the start of projects involving fill within any wetland resource area; 19. No disposal of soils or other materials shall be allowed within: a 100 -year floodplain; 40 feet of the 100 -year floodplain elevation; any wetland; or any area within 100 -feet of a wetland, unless such areas are specifically approved by the Commission, in accordance with 310 CMR 10.00, and City of Northampton Ordinances - Chapter 24; 20. Any change or deviation from the Notice of Intent, plans and/or Order of Conditions approved by the Commission, prior to or during construction, shall require the applicant to file a request for an amendment with the Conservation Commission. It shall include a written inquiry as to whether or not the change is substantial enough to require the filing of a new Notice of Intent. After making a positive determination, the Commission shall conduct a public hearing to amend the Order or to issue a new Order, if a new Notice of Intent is required. 4 Doc; 990007062 OR /5634/0173 ('9I1999 14:52 21 In accordance with General Condition 8 on page 5 -2 of this Order, this Order shall be recorded at the Hampshire County Registry of Deeds by the Northampton Conservation Commission prior to commencement of work on the site. 22. All revised plans, referenced within this Order of Conditions, shall be approved by the Conservation Commission and incorporated into this Order by reference and shall be followed during the course of construction. 23. Ongoing conditions that shall not expire with the issuance of a Certificate of Compliance are as follows: ( #30, A & B). PRE - CONSTRUCTION REQUIREMENTS: 24. The applicant shall notify the Commission, in writing, as to the date that the work will commence on the project. Said notification must be received by the Commission no sooner than (10) days and no later than five (5) days prior to the commencement of the approved activity; 25. The applicant shall notify the Commission in writing of the name, address, business and home telephone numbers of the project supervisor and/or contractor who shall be responsible for ensuring compliance with the conditions in this Order. 26. Prior to the start of any site work, excavation or construction, a preconstruction conference shall be held on the site, between the contractor conducting the work, the site /project engineer, the applicant, and a member or agent of the Conservation Commission, in order to ensure that the requirements of this Order are understood by all parties. Prior to the pre - construction meeting, all erosion control devices must be installed, also. 27. In the event of an emergency, problem, or the need to discuss site conditions with the Commission or its agent, the contact person for this project shall be: John Bennett (days) and (evenings & weekends); REQUIREMENTS DURING ACTIVE CONSTRUCTION: 28. EROSION AND SEDIMENTATION CONTROL: A. Areas of construction shall remain in a stable condition at the close of each work/construction day: 1. Erosion controls shall be inspected at this time, and after each rainstorm. 2. Any entrapped silt greater than six inches shall be removed to an area 5 Doc; 990007062 OR /51,,,/0174 03/09/199914; 52 outside of the buffer zone and wetland resource areas. 3. Any breaches in the siltation barriers shall be repaired prior to leaving the site for the day. 4. All erosion controls must be maintained or reinforced to meet specifications in the plans and this order and shall be replaced as necessary. 5. An adequate stockpile of erosion control materials shall be on site at all times for emergency or routine replacement. The stockpiles equipment shall include materials to repair silt fences, haybales, or any other devices planned for the control of erosion at the site. B. Adequate measures shall be taken to prevent erosion and siltation of all disturbed areas, and shall be implemented prior to any construction: 1. Erosion control devices shall remain in place until all disturbed surfaces have been stabilized with a vegetative cover or until the Commission has authorized their removal. Areas that cannot be permanently stabilized within 30 days of disturbance shall be stabilized by temporary measures acceptable to the Conservation Commission. POST CONSTRUCTION SUBMITTALS & WORK IN BUFFER ZONE: 29. Upon completion of the project, the Applicant shall submit a certification that all work has been done in conformance with the provisions of the Order of Conditions and request a Certificate of Compliance. If checked: [ X] YES Certification shall be by the Project Engineer. STORMWATER RUNOFF & POLLUTANT PREVENTION & WATER QUALITY 30. Stormwater Runoff: A. New or altered existing catch basins will be designed with four -foot sumps and oil separators and will be cleaned annually. B. Catch basin sediments will be disposed of in accordance with current DEP policy. 6 10.99: continued appeared rrn > tJ r rtb -r--1 310 CMR., >EPARTMENT OF ENVIRONMENT \'PROTECTION Issued by the Northampton Conservation Commission This Order must be signed by a majority of the Conservation Commission. On this day of Dec- earuf-Z2 19 9 d - ', , before me personally the foregoing instrument, and acknowledged that he /she executed the same as his/her free act and deed. - - Doc, 990007062 OR /5634/0175 03/09/199914; 52 - 7/ 4 7 9 � D My Commission Efcspires , to me known to be the person described in, and who executed, The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the Department of Environmental Protection to issue a Superseding.Order, providing the request is made by certified mail or hand . delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7) within ten days from the date of issuance of this determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. 4/1/94 Detach on dotted line and submit to the Northampton Conservation Commission prior to commencement of work. To Northampton Conservation Commission Issuing Authors r'� Please be advised that the Order of Conditions for the project at File Number has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on 19 If recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Signature Applicant 1tEGLST 310 CMR - 423 423 cr "15s iNrEHw Xi y Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. WPA Form 7 Rev. 02/00 O 92134549 OR /6473/0270 12/21/200108;'~ Massachusetts Department of Environmental Protection _Bureau__ of Resource_ P_rotection_— Wetlands WPA Form 7 — Extension Permit for Orders of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City of Northampton Wetlands Protection Ordinance, Chapter 24 A. General Information 1. Applicant: Massachusetts Highway Department Name Ten Park Plaza Mailing Address Boston City/Town 2. Property Owner (if different): Name Mailing Address City/Town B. Finding Information The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on: January 19, 1999 Date for work at: Route 9 over the Connecticut River. N/A N/A Street Address recorded at the Registry of Deeds for: Hampshire County Certificate (if registered land) is hereby extended until: January 19, 2005 Date Date the Order was last extended (if applicable): N/A Date Issued by: Northampton Conservation Commission Conservation Commission MA State State Assessor's Map /Plat Number N/A Book DEP File Number: 246 -437 Provided by DEP 02116 - 3973 Zip Code Zip Code Parcel /Lot Number N/A Page This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest extension. Only unexpired Orders of Conditions or Extension may be extended. Page 1 of 3 WPA Form 7 Rev. 02 /00 Doc: 9r '1549 OR /6473/0271 12/21/2001 08:57 Massachusetts Department of Environmental Protection —Bureau-of-Resource-Protection---Wetlands WPA Form 7 Extension Permit for Orders of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City of Northampton Wetlands Protection Ordinance, Chapter 24 B. Finding Information (cont.) This Order of Conditions Extension must be signed by a majority of the Conservation Commission and a copy sent to the applicant and the appropriate DEP Regional Office (see Appendix A). Signatures: On Twenty -ninth Day before me personally appeared The above -named Mason Maronn that he /she executed the same as his /her free act and deed. Date sent to DEP: December 4, 2001 Of November, 2001 Month and Year My ommission Expires C /l ,,, to me known to be the person described in and who executed the foregoing instrul ant an�ci - pc n ovule &fed DEP File Number: 246 -437 Provided by DEP C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order (or in this case, the Extension Permit for the Order of Conditions) in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach page 3 of Form 7 and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. Page 2 of 3 • WPA Form 7 Rev. 02/00 Do'32134549 OR /6473/0272 12/21/2001 08 ( Massachusetts Department of Environmental Protection -- Bureau -of- Resource - Protection - - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City of Northampton Wetlands Protection Ordinance, Chapter 24 C. Recording Confirmation (cont.) To: for: Northampton Conservation Commission Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: Route 9 over the Connecticut River Project Location has been recorded at the Registry of Deed of: Hamsphire County Massachusetts Highway Department Property Owner 246 -437 DEP File Number and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: Date Book If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant or MARIANNE I DONOHUE REGISM DEP File Number: 246 -437 Provided by DEP Page Page 3 of 3